PREPARING ROW
|
STA
|
4.000
|
$4,000.000
|
$15,000.000
|
$45,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
140.000
|
$15.000
|
$50.000
|
$10.000
|
|
|
REMOVING CONC (APPR SLAB)
|
SY
|
169.000
|
$15.000
|
$150.000
|
$10.000
|
|
|
REMOVING STAB BASE & ASPH PAV (12")
|
SY
|
1,223.000
|
$20.000
|
$30.000
|
$15.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (5")
|
SY
|
1,302.000
|
$9.000
|
$25.000
|
$5.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
278.000
|
$15.000
|
$50.000
|
$50.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
296.000
|
$50.000
|
$50.000
|
$50.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
2,312.000
|
$10.000
|
$6.000
|
$4.000
|
|
|
BLOCK SODDING
|
SY
|
2,312.000
|
$6.000
|
$10.000
|
$8.000
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
2,312.000
|
$0.300
|
$1.000
|
$2.000
|
|
|
VEGETATIVE WATERING
|
MG
|
401.000
|
$25.000
|
$1.000
|
$30.000
|
|
|
CEMENT
|
TON
|
37.000
|
$165.000
|
$350.000
|
$400.000
|
|
|
CEMENT TREAT (NEW BASE) (8")
|
SY
|
3,214.000
|
$20.000
|
$20.000
|
$10.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
856.000
|
$5.000
|
$15.000
|
$15.000
|
|
|
CEM STABIL BKFL
|
CY
|
105.000
|
$250.000
|
$300.000
|
$300.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
565.000
|
$80.000
|
$125.000
|
$50.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
666.000
|
$250.000
|
$350.000
|
$400.000
|
|
|
CL B CONC (FLUME)
|
CY
|
6.200
|
$800.000
|
$1,000.000
|
$1,000.000
|
|
|
CL C CONC (ABUT)(HPC)(SRC)
|
CY
|
48.000
|
$1,200.000
|
$2,500.000
|
$2,000.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
35.800
|
$1,100.000
|
$2,500.000
|
$2,000.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
16.800
|
$1,000.000
|
$2,500.000
|
$2,000.000
|
|
|
CL C CONC (WINGWALLS)
|
CY
|
25.600
|
$1,200.000
|
$2,000.000
|
$2,000.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
6,798.000
|
$45.000
|
$40.000
|
$45.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
61.000
|
$700.000
|
$1,500.000
|
$1,250.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
842.500
|
$165.000
|
$370.000
|
$300.000
|
|
|
SILICONE RESIN PAINT FINISH
|
SF
|
1,403.600
|
$15.000
|
$6.000
|
$10.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
2.000
|
$785.000
|
$2,000.000
|
$1,500.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
481.000
|
$200.000
|
$200.000
|
$225.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
430.000
|
$225.000
|
$200.000
|
$225.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
68.000
|
$480.000
|
$800.000
|
$1,000.000
|
|
|
RAIL (TY T552)
|
LF
|
103.000
|
$145.000
|
$225.000
|
$200.000
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
388.000
|
$100.000
|
$200.000
|
$200.000
|
|
|
CONC BOX CULV (8 FT X 7 FT)
|
LF
|
120.000
|
$900.000
|
$1,350.000
|
$1,500.000
|
|
|
WINGWALL (FW - 0) (HW=9 FT)
|
EA
|
1.000
|
$32,000.000
|
$38,000.000
|
$30,000.000
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
1.000
|
$12,000.000
|
$40,000.000
|
$20,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$1,800.000
|
$10,000.000
|
$5,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$125,000.000
|
$200,000.000
|
$300,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$247,402.000
|
$345,000.000
|
$450,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$8,500.000
|
$12,500.000
|
$10,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
269.000
|
$32.000
|
$1.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
269.000
|
$11.000
|
$1.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,329.000
|
$3.000
|
$1.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,329.000
|
$1.500
|
$1.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
200.000
|
$3.000
|
$10.000
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
200.000
|
$1.500
|
$2.000
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,157.000
|
$50.000
|
$215.000
|
$400.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
720.000
|
$80.000
|
$90.000
|
$150.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
720.000
|
$10.000
|
$30.000
|
$10.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
720.000
|
$20.000
|
$30.000
|
$30.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
850.000
|
$40.000
|
$30.000
|
$50.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,800.000
|
$2,100.000
|
$3,000.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,500.000
|
$1,500.000
|
$2,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
650.000
|
$6.000
|
$2.000
|
$5.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
5.000
|
$330.000
|
$500.000
|
$250.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$2,800.000
|
$3,000.000
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$320.000
|
$500.000
|
$250.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$2,000.000
|
$3,000.000
|
$3,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$1,300.000
|
$2,000.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
1.000
|
$10,000.000
|
$10,000.000
|
$12,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
3.000
|
$20.000
|
$20.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
3.000
|
$20.000
|
$20.000
|
$25.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
20.000
|
$27.000
|
$20.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
6.000
|
$35.000
|
$30.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
16.000
|
$35.000
|
$30.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
6.000
|
$35.000
|
$30.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$20.000
|
$30.000
|
$50.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
6.000
|
$150.000
|
$150.000
|
$300.000
|
|
|
INSTL OM ASSM (OM-3L)(WFLX)GND)GND
|
EA
|
6.000
|
$250.000
|
$500.000
|
$600.000
|
|
|
INSTL OM ASSM (OM-3R)(WFLX)GND)GND
|
EA
|
2.000
|
$257.000
|
$500.000
|
$600.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
65.500
|
$1.500
|
$2.000
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
3,040.000
|
$1.300
|
$1.500
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
2,830.000
|
$1.300
|
$1.500
|
$2.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
3,301.000
|
$1.000
|
$1.000
|
$2.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
509.000
|
$1.200
|
$1.000
|
$2.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
3,300.000
|
$1.000
|
$1.250
|
$2.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
19.000
|
$4.000
|
$10.000
|
$10.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
30.000
|
$4.000
|
$10.000
|
$10.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
3,619.250
|
$0.500
|
$1.000
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
3,212.000
|
$0.750
|
$0.100
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
402.000
|
$1.000
|
$1.000
|
$0.500
|
|
|
REPAIR (REACT)
|
EA
|
1.000
|
$3,400.000
|
$30,000.000
|
$5,000.000
|
|
|
D-GR HMA TY-B PG70-22
|
TON
|
1,275.000
|
$150.000
|
$215.000
|
$160.000
|
|
|
D-GR HMA TY-D PG70-22 (EXEMPT)
|
TON
|
322.000
|
$250.000
|
$215.000
|
$180.000
|
|
|
BONDING COURSE
|
GAL
|
234.000
|
$5.250
|
$10.000
|
$15.000
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
2.000
|
$350.000
|
$1,000.000
|
$2,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
1,200.000
|
$150.000
|
$80.000
|
$25.000
|
|
|
TMA (STATIONARY)
|
DAY
|
41.000
|
$400.000
|
$250.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
17.000
|
$400.000
|
$250.000
|
$1,000.000
|
|
Totals: |
$2,740,539.775
|
$3,882,921.050
|
$4,171,570.250
|