Show Job Controls
Bid Cobra

WILBARGER US 287 (0043-05-112)

Items: 88

County: WILBARGER
Length: N/A
Highway: US 287
District: WICHITA FALLS
Control Number: 0043-05-112
DBE Goal: N/A
Project: F 2023(621)
Guaranty: N/A
Time: 210 WORKING DAYS
Engineer's Estimate: $2,740,539.77
Date: 04/05/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
CALLAN COLTHARP
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$2,740,539.77
Over/Under Est: 41.68% $1,142,381.28
$4,171,570.25
Over/Under Est: 52.22% $1,431,030.48
Amt Left: 7.43% $288,649.20
Subcontractor Percentage Amount
FOUTSCO PAVING COMPANY, LLC 13.45% $522,252.88
MORRIS COUNTY CONTRACTORS, L.L.C. 2.20% $85,424.26
LANCO TURF & SEEDING, INC. 0.95% $36,887.75
BARRICADES UNLIMITED 0.81% $31,451.66
TEXOP CONSTRUCTION 0.80% $31,063.37
TORO BRAVO CONSTRUCTION, LLC 0.39% $15,143.39
TRP CONSTRUCTION GROUP, LLC 0.35% $13,590.22
PENHALL COMPANY 0.18% $6,989.26
SCOTT DERR PAINTING CO, LLC 0.18% $6,989.26
Total: 19.31% $749,792.05

Bid Items & Bid Tabulations

88 Total 0 of 88
WILBARGER  |  US 287  |  WICHITA FALLS  |  0043-05-112  |  04/05/2023  |  $2,740,539.77  |  F 2023(621)  |  BRIDGE REPL  |  210 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HODGES AND SON CONSTRUCTION COMPANY, INC.
EARTH BUILDERS, L.P.
PREPARING ROW
STA 4.000 $4,000.000 $15,000.000 $45,000.000
REMOVING CONC (RIPRAP)
SY 140.000 $15.000 $50.000 $10.000
REMOVING CONC (APPR SLAB)
SY 169.000 $15.000 $150.000 $10.000
REMOVING STAB BASE & ASPH PAV (12")
SY 1,223.000 $20.000 $30.000 $15.000
REMOVING STAB BASE AND ASPH PAV (5")
SY 1,302.000 $9.000 $25.000 $5.000
EXCAVATION (ROADWAY)
CY 278.000 $15.000 $50.000 $50.000
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 296.000 $50.000 $50.000 $50.000
COMPOST MANUF TOPSOIL (4")
SY 2,312.000 $10.000 $6.000 $4.000
BLOCK SODDING
SY 2,312.000 $6.000 $10.000 $8.000
DRILL SEED (TEMP)(WARM OR COOL)
SY 2,312.000 $0.300 $1.000 $2.000
VEGETATIVE WATERING
MG 401.000 $25.000 $1.000 $30.000
CEMENT
TON 37.000 $165.000 $350.000 $400.000
CEMENT TREAT (NEW BASE) (8")
SY 3,214.000 $20.000 $20.000 $10.000
PRIME COAT (MC-30)
GAL 856.000 $5.000 $15.000 $15.000
CEM STABIL BKFL
CY 105.000 $250.000 $300.000 $300.000
TEMPORARY SPL SHORING
SF 565.000 $80.000 $125.000 $50.000
DRILL SHAFT (36 IN)
LF 666.000 $250.000 $350.000 $400.000
CL B CONC (FLUME)
CY 6.200 $800.000 $1,000.000 $1,000.000
CL C CONC (ABUT)(HPC)(SRC)
CY 48.000 $1,200.000 $2,500.000 $2,000.000
CL C CONC (CAP)(HPC)
CY 35.800 $1,100.000 $2,500.000 $2,000.000
CL C CONC (COLUMN)(HPC)
CY 16.800 $1,000.000 $2,500.000 $2,000.000
CL C CONC (WINGWALLS)
CY 25.600 $1,200.000 $2,000.000 $2,000.000
REINF CONC SLAB (HPC)
SF 6,798.000 $45.000 $40.000 $45.000
APPROACH SLAB (HPC)
CY 61.000 $700.000 $1,500.000 $1,250.000
PRESTR CONC GIRDER (TX28)
LF 842.500 $165.000 $370.000 $300.000
SILICONE RESIN PAINT FINISH
SF 1,403.600 $15.000 $6.000 $10.000
RIPRAP (CONC)(CL B)
CY 2.000 $785.000 $2,000.000 $1,500.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 481.000 $200.000 $200.000 $225.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 430.000 $225.000 $200.000 $225.000
RIPRAP (MOW STRIP)(4 IN)
CY 68.000 $480.000 $800.000 $1,000.000
RAIL (TY T552)
LF 103.000 $145.000 $225.000 $200.000
RAIL (TY SSTR)(HPC)
LF 388.000 $100.000 $200.000 $200.000
CONC BOX CULV (8 FT X 7 FT)
LF 120.000 $900.000 $1,350.000 $1,500.000
WINGWALL (FW - 0) (HW=9 FT)
EA 1.000 $32,000.000 $38,000.000 $30,000.000
REMOV STR (BOX CULVERT)
EA 1.000 $12,000.000 $40,000.000 $20,000.000
REMOV STR (WINGWALL)
EA 2.000 $1,800.000 $10,000.000 $5,000.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $125,000.000 $200,000.000 $300,000.000
MOBILIZATION
LS 1.000 $247,402.000 $345,000.000 $450,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $8,500.000 $12,500.000 $10,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 269.000 $32.000 $1.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 269.000 $11.000 $1.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,329.000 $3.000 $1.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,329.000 $1.500 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 200.000 $3.000 $10.000 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 200.000 $1.500 $2.000 $1.000
CONSTRUCTING DETOURS
SY 1,157.000 $50.000 $215.000 $400.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 720.000 $80.000 $90.000 $150.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 720.000 $10.000 $30.000 $10.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 720.000 $20.000 $30.000 $30.000
MTL W-BEAM GD FEN (STEEL POST)
LF 850.000 $40.000 $30.000 $50.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,800.000 $2,100.000 $3,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,500.000 $1,500.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 650.000 $6.000 $2.000 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $330.000 $500.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $2,800.000 $3,000.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $320.000 $500.000 $250.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $2,000.000 $3,000.000 $3,000.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,300.000 $2,000.000 $1,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $10,000.000 $10,000.000 $12,500.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 3.000 $20.000 $20.000 $25.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 3.000 $20.000 $20.000 $25.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 20.000 $27.000 $20.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 6.000 $35.000 $30.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 16.000 $35.000 $30.000 $50.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 6.000 $35.000 $30.000 $50.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 6.000 $20.000 $30.000 $50.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 6.000 $150.000 $150.000 $300.000
INSTL OM ASSM (OM-3L)(WFLX)GND)GND
EA 6.000 $250.000 $500.000 $600.000
INSTL OM ASSM (OM-3R)(WFLX)GND)GND
EA 2.000 $257.000 $500.000 $600.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 65.500 $1.500 $2.000 $2.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 3,040.000 $1.300 $1.500 $2.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 2,830.000 $1.300 $1.500 $2.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 3,301.000 $1.000 $1.000 $2.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 509.000 $1.200 $1.000 $2.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 3,300.000 $1.000 $1.250 $2.000
REFL PAV MRKR TY II-A-A
EA 19.000 $4.000 $10.000 $10.000
REFL PAV MRKR TY II-C-R
EA 30.000 $4.000 $10.000 $10.000
ELIM EXT PAV MRK & MRKS (4")
LF 3,619.250 $0.500 $1.000 $1.000
PAV SURF PREP FOR MRK (4")
LF 3,212.000 $0.750 $0.100 $1.000
PAV SURF PREP FOR MRK (6")
LF 402.000 $1.000 $1.000 $0.500
REPAIR (REACT)
EA 1.000 $3,400.000 $30,000.000 $5,000.000
D-GR HMA TY-B PG70-22
TON 1,275.000 $150.000 $215.000 $160.000
D-GR HMA TY-D PG70-22 (EXEMPT)
TON 322.000 $250.000 $215.000 $180.000
BONDING COURSE
GAL 234.000 $5.250 $10.000 $15.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 2.000 $350.000 $1,000.000 $2,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 1,200.000 $150.000 $80.000 $25.000
TMA (STATIONARY)
DAY 41.000 $400.000 $250.000 $500.000
TMA (MOBILE OPERATION)
DAY 17.000 $400.000 $250.000 $1,000.000
Totals: $2,740,539.775 $3,882,921.050 $4,171,570.250