Show Job Controls
Bid Cobra

WICHITA FM 367 (0681-04-041)

Items: 95

County: WICHITA
Length: N/A
Highway: FM 367
District: WICHITA FALLS
Control Number: 0681-04-041
DBE Goal: N/A
Project: STP 1802(253)HES
Guaranty: N/A
Time: 170 WORKING DAYS
Engineer's Estimate: $4,269,955.13
Date: 08/08/2018 (7 years ago)
Contract Number: N/A
Type: SAFETY TREAT FIXED OBBJECTS, PROVIDE ADDL WIDTH
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$4,269,955.13
$5,646,361.90
Over/Under Est: 32.23% $1,376,406.77
$6,768,797.30
Over/Under Est: 58.52% $2,498,842.17
Amt Left: 19.88% $1,122,435.40
$7,043,197.25
Over/Under Est: 64.95% $2,773,242.12
Amt Left: 24.74% $1,396,835.35
Delta: -4.05% -$274,399.95

Bid Items & Bid Tabulations

95 Total 0 of 95
WICHITA  |  FM 367  |  WICHITA FALLS  |  0681-04-041  |  08/08/2018  |  $4,269,955.13  |  STP 1802(253)HES  |  SAFETY TREAT FIXED OBBJECTS, PROVIDE...  |  170 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
DUININCK, INC.
GILVIN-TERRILL, LTD.
REMOVING CONC (CURB)
LF 46.000 $10.000 $25.000 $20.000 $20.000
EXCAVATION (ROADWAY)
CY 5,489.000 $14.000 $15.000 $37.500 $25.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 14,671.000 $10.000 $15.000 $34.500 $30.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 22.600 $820.000 $550.000 $510.000 $450.000
DRILL SEEDING (TEMP) (WARM)
AC 11.300 $700.000 $450.000 $240.000 $400.000
DRILL SEEDING (TEMP) (COOL)
AC 11.300 $700.000 $450.000 $295.000 $450.000
VEGETATIVE WATERING
MG 911.800 $15.000 $18.000 $32.000 $15.000
CEMENT
TON 696.000 $140.000 $167.000 $170.000 $165.000
CEMENT TREAT(EXIST MATL)(8")
SY 65,173.000 $3.100 $3.500 $3.900 $6.000
D-GR HMA TY-B PG64-22
TON 11,955.000 $63.000 $90.000 $100.000 $100.000
SUPERPAVE MIXTURES SP-D PG70-22
TON 16,730.000 $73.000 $105.500 $107.500 $115.000
CEM STABIL BKFL
CY 84.000 $200.000 $130.000 $135.000 $125.000
CUT & RESTORE ASPH PAVING
SY 253.000 $100.000 $67.000 $48.000 $45.000
TRENCH EXCAVATION PROTECTION
LF 160.000 $15.000 $23.000 $53.000 $50.000
TEMPORARY SPL SHORING
SF 756.000 $14.000 $55.000 $37.500 $35.000
CL A CONC (COLLAR)
EA 8.000 $725.000 $1,000.000 $1,100.000 $1,000.000
CL C CONC (MISC)
CY 11.200 $550.000 $1,400.000 $1,100.000 $1,000.000
RIPRAP (CONC)(5 IN)
CY 32.000 $500.000 $500.000 $480.000 $450.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 139.700 $200.000 $180.000 $135.000 $200.000
RIPRAP (MOW STRIP)(4 IN)
CY 56.000 $485.000 $500.000 $500.000 $470.000
STR STEEL (MISC NON - BRIDGE)
LB 15,180.000 $5.000 $1.000 $5.300 $15.000
CMP (GAL STL 18 IN)
LF 88.000 $50.000 $75.000 $48.000 $45.000
CMP (GAL STL 24 IN)
LF 74.000 $60.000 $80.000 $58.500 $55.000
CONC BOX CULV (7 FT X 7 FT)
LF 120.000 $500.000 $650.000 $880.000 $825.000
CONC BOX CULV (8 FT X 5 FT)
LF 124.000 $450.000 $600.000 $825.000 $775.000
CONC BOX CULV (12 FT X 8 FT)
LF 54.000 $1,150.000 $1,200.000 $1,500.000 $1,400.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 74.000 $600.000 $1,000.000 $605.000 $570.000
CONC BOX CULV (10 FT X 8 FT)(EXTEND)
LF 24.000 $1,500.000 $1,500.000 $970.000 $910.000
RC PIPE (CL III)(15 IN)
LF 17.000 $50.000 $220.000 $60.500 $57.000
RC PIPE (CL III)(18 IN)
LF 93.000 $60.000 $64.000 $69.000 $65.000
RC PIPE (CL III)(24 IN)
LF 41.000 $75.000 $100.000 $100.000 $95.000
RC PIPE (CL III)(30 IN)
LF 26.000 $90.000 $180.000 $120.000 $115.000
RC PIPE (CL III)(36 IN)
LF 155.000 $105.000 $150.000 $170.000 $160.000
RC PIPE (CL III)(42 IN)
LF 16.000 $120.000 $220.000 $235.000 $220.000
RC PIPE (CL III)(48 IN)
LF 144.000 $140.000 $230.000 $255.000 $240.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 2.000 $7,000.000 $10,000.000 $10,500.000 $9,900.000
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 4.000 $8,500.000 $12,000.000 $11,000.000 $10,500.000
WINGWALL (FW - 0) (HW=6 FT)
EA 1.000 $10,000.000 $8,000.000 $5,900.000 $5,500.000
WINGWALL (FW - 0) (HW=8 FT)
EA 1.000 $16,000.000 $13,000.000 $12,000.000 $11,500.000
WINGWALL (FW - 0) (HW=9 FT)
EA 2.000 $18,000.000 $16,000.000 $14,000.000 $13,000.000
WINGWALL (PW - 1) (HW=10 FT)
EA 2.000 $22,000.000 $32,000.000 $30,000.000 $28,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $12,000.000 $14,000.000 $12,000.000 $11,500.000
WINGWALL (PW - 1) (HW=7 FT)
EA 4.000 $16,000.000 $20,000.000 $17,500.000 $16,500.000
WINGWALL (PW - 1) (HW=9 FT)
EA 2.000 $20,000.000 $26,000.000 $28,000.000 $26,500.000
SET (TY II) (15 IN) (RCP) (3: 1) (C)
EA 6.000 $450.000 $650.000 $850.000 $800.000
SET (TY II) (15 IN) (RCP) (4: 1) (C)
EA 2.000 $500.000 $650.000 $880.000 $825.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 10.000 $800.000 $750.000 $960.000 $900.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 2.000 $600.000 $750.000 $905.000 $850.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $700.000 $750.000 $960.000 $900.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 4.000 $1,100.000 $850.000 $1,200.000 $1,100.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 10.000 $1,000.000 $850.000 $1,100.000 $1,050.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 4.000 $1,400.000 $1,000.000 $1,600.000 $1,500.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 4.000 $1,500.000 $1,000.000 $1,800.000 $1,650.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 12.000 $1,800.000 $2,000.000 $3,700.000 $3,500.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 10.000 $1,950.000 $2,000.000 $4,000.000 $3,750.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 1.000 $2,500.000 $2,400.000 $5,900.000 $5,500.000
SET (TY II) (42 IN) (RCP) (4: 1) (C)
EA 4.000 $3,000.000 $3,500.000 $5,300.000 $5,000.000
CLEAN EXIST CULVERTS
EA 2.000 $1,500.000 $2,000.000 $2,700.000 $2,500.000
REMOV STR (BOX CULVERT)
EA 3.000 $6,000.000 $2,500.000 $8,000.000 $7,500.000
REMOV STR (WINGWALL)
EA 3.000 $1,500.000 $1,500.000 $530.000 $500.000
REMOV STR (PIPE)
LF 480.000 $16.000 $15.000 $10.500 $10.000
MOBILIZATION
LS 1.000 $311,848.530 $500,000.000 $550,000.000 $700,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $6,000.000 $9,000.000 $37,000.000 $10,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 530.000 $28.000 $26.000 $25.500 $36.000
ROCK FILTER DAMS (REMOVE)
LF 530.000 $8.000 $3.000 $10.500 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,990.000 $2.900 $4.000 $2.150 $2.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,990.000 $1.000 $1.000 $0.750 $0.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 5,125.000 $4.000 $4.000 $3.000 $4.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 5,125.000 $1.000 $1.500 $0.530 $0.500
INTRSCT, DRVWAYS, & TURNOUT (CONC)
SY 96.000 $85.000 $110.000 $85.000 $80.000
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 2,699.000 $35.000 $35.000 $45.000 $60.000
DRIVEWAYS (BASE)
SY 5,325.000 $16.000 $17.000 $16.500 $20.000
RUMBLE STRIPS (SHOULDER)
LF 96,000.000 $0.120 $0.140 $0.190 $0.240
RUMBLE STRIPS (CENTERLINE)
LF 48,000.000 $0.120 $0.140 $0.250 $0.260
MTL W-BEAM GD FEN (TIM POST)
LF 687.500 $20.000 $24.000 $21.500 $20.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 112.500 $65.000 $62.000 $89.500 $84.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,000.000 $3,300.000 $2,700.000 $2,575.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 11.000 $200.000 $230.000 $230.000 $250.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 3.000 $300.000 $290.000 $285.000 $350.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 2.000 $500.000 $630.000 $630.000 $550.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 37.000 $325.000 $370.000 $375.000 $300.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 19.000 $450.000 $410.000 $410.000 $300.000
RELOCATE SM RD SN SUP&AM TY TWT
EA 17.000 $500.000 $300.000 $300.000 $200.000
REMOVE SM RD SN SUP&AM
EA 12.000 $100.000 $120.000 $120.000 $70.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 66.000 $70.000 $60.000 $58.500 $70.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 123.000 $10.000 $27.000 $26.500 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 22.000 $30.000 $21.000 $31.000 $35.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 5,189.000 $1.200 $0.500 $1.050 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 97,200.000 $0.280 $0.330 $0.340 $0.350
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 6,000.000 $0.280 $0.330 $0.340 $0.350
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 67,650.000 $0.280 $0.330 $0.340 $0.350
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 22.000 $18.000 $13.000 $13.500 $25.000
REFL PAV MRKR TY II-A-A
EA 1,149.000 $3.000 $3.500 $3.200 $3.250
TMA (STATIONARY)
DAY 196.000 $100.000 $210.000 $300.000 $950.000
TMA (MOBILE OPERATION)
HR 432.000 $20.000 $35.000 $96.000 $95.000
Totals: $4,269,955.130 $5,646,361.900 $6,768,797.300 $7,043,197.250