WICHITA FM 1177 (0514-04-014)

Items: 74

County: WICHITA
Length: N/A
Highway: FM 1177
District: WICHITA FALLS
Control Number: 0514-04-014
DBE Goal: N/A
Project: STP 2B20(077)HES
Guaranty: N/A
Time: 102 WORKING DAYS
Engineer's Estimate: $1,887,194.06
Date: 08/06/2020 (5 years ago)
Contract Number: N/A
Type: PROVIDE ADDITIONAL PAVED SURFACE WIDTH
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$1,887,194.06
$2,189,864.65
Over/Under Est: 16.04% $302,670.59
Over/Under Est: 26.66% $503,143.49
Amt Left: 9.15% $200,472.90
Over/Under Est: 39.31% $741,911.12
Amt Left: 20.06% $439,240.53
Delta: -9.99% -$238,767.63

Bid Items & Bid Tabulations

74 Total 0 of 74
WICHITA  |  FM 1177  |  WICHITA FALLS  |  0514-04-014  |  08/06/2020  |  $1,887,194.06  |  STP 2B20(077)HES  |  PROVIDE ADDITIONAL PAVED SURF WIDTH  |  102 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
BLACKSMITH VENTURES LLC
PEACHTREE CONSTRUCTION, LTD.
REMOVING CONC (RIPRAP)
SY 3.500 $50.000 $400.000 $250.000 $110.000
REMOVING CONC (DRIVEWAYS)
SY 33.000 $100.000 $60.000 $30.000 $34.000
EXCAVATION (ROADWAY)
CY 1,875.000 $20.000 $14.000 $20.000 $31.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 2,166.000 $25.000 $48.000 $30.000 $48.000
BLOCK SODDING
SY 81.000 $5.000 $12.000 $35.000 $16.000
BROADCAST SEED (TEMP) (WARM)
SY 33,645.000 $0.100 $0.080 $0.650 $0.080
BROADCAST SEED (TEMP) (COOL)
SY 33,645.000 $0.100 $0.090 $0.650 $0.060
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 67,286.000 $0.850 $0.090 $1.000 $0.100
VEGETATIVE WATERING
MG 564.000 $35.000 $18.000 $40.000 $40.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 1,320.000 $1.050 $2.000 $6.000 $2.700
EMULS ASPH (PRIME)(MS-2 OR SS-1)
GAL 20,942.000 $3.250 $1.000 $5.000 $3.500
ASPH (AC-20-5TR)
GAL 14,832.000 $3.200 $3.400 $6.000 $4.600
AGGR(TY-PB GR-4 SAC-B)
CY 385.000 $200.000 $150.000 $192.500 $220.000
PLANE ASPH CONC PAV(0" TO 2")
SY 534.000 $3.200 $8.000 $40.000 $16.000
CEM STABIL BKFL
CY 48.000 $150.000 $275.000 $200.000 $220.000
CUT & RESTORE ASPH PAVING
SY 55.000 $75.000 $98.000 $100.000 $210.000
RIPRAP (CONC)(5 IN)
CY 12.800 $400.000 $600.000 $500.000 $800.000
RIPRAP (STONE TY R)(DRY)(12 IN)
CY 28.000 $150.000 $330.000 $200.000 $275.000
RIPRAP (MOW STRIP)(4 IN)
CY 5.000 $660.000 $650.000 $600.000 $825.000
CMP (GAL STL 30 IN)
LF 100.000 $110.000 $130.000 $60.000 $55.000
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 39.000 $750.000 $550.000 $700.000 $850.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 31.000 $850.000 $630.000 $750.000 $950.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 26.000 $900.000 $700.000 $800.000 $1,050.000
RC PIPE (CL III)(24 IN)
LF 68.500 $75.000 $146.000 $100.000 $100.000
RC PIPE (CL III)(30 IN)
LF 193.000 $90.000 $210.000 $130.000 $110.000
RC PIPE (CL III)(36 IN)
LF 38.000 $175.000 $290.000 $150.000 $165.000
HEADWALL (CH - PW - S) (DIA= 36 IN)
EA 1.000 $5,500.000 $11,300.000 $8,000.000 $12,000.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
EA 6.000 $7,000.000 $5,500.000 $7,000.000 $3,000.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
EA 4.000 $8,000.000 $6,000.000 $9,000.000 $4,200.000
SET (TY I)(S= 5 FT)(HW= 6 FT)(3:1) (C)
EA 1.000 $10,000.000 $12,000.000 $15,000.000 $12,500.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
EA 4.000 $9,000.000 $8,200.000 $9,500.000 $6,600.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 6.000 $1,200.000 $1,100.000 $1,800.000 $1,350.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $1,050.000 $1,100.000 $1,800.000 $1,250.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $1,250.000 $1,200.000 $2,400.000 $1,300.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $1,400.000 $1,300.000 $3,000.000 $1,400.000
SET (TY II) (30 IN) (CMP) (6: 1) (P)
EA 2.000 $2,000.000 $3,300.000 $3,600.000 $2,800.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 6.000 $2,500.000 $2,800.000 $3,300.000 $2,750.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 4.000 $1,600.000 $3,300.000 $3,600.000 $2,650.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $2,000.000 $4,200.000 $4,800.000 $5,000.000
CLEAN EXIST CULVERTS
EA 1.000 $2,000.000 $3,300.000 $2,500.000 $2,200.000
REMOV STR (WINGWALL)
EA 7.000 $1,050.000 $550.000 $1,000.000 $900.000
REMOV STR (PIPE)
LF 260.500 $20.000 $13.000 $10.000 $17.000
MOBILIZATION
LS 1.000 $177,750.000 $200,000.000 $150,000.000 $238,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $10,000.000 $27,500.000 $6,000.000 $15,000.000
TEMP PAVED FLUME (INSTALL)
SY 135.000 $30.000 $25.000 $100.000 $140.000
TEMP PAVED FLUME (REMOVE)
SY 135.000 $10.000 $5.000 $20.000 $32.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 420.000 $2.900 $5.000 $4.000 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 420.000 $0.600 $1.000 $1.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,550.000 $4.500 $4.000 $6.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,550.000 $0.850 $0.800 $1.000 $1.000
INTERSECTIONS (SURF TREAT)
SY 250.000 $20.000 $22.000 $30.000 $6.500
DRIVEWAYS (CONC)
SY 33.000 $100.000 $110.000 $72.000 $120.000
DRIVEWAYS (ACP)
SY 1,758.000 $33.000 $36.000 $80.000 $54.000
TURNOUTS (ACP)
SY 88.000 $45.000 $36.000 $80.000 $54.000
DRIVEWAYS (BASE)
SY 1,341.000 $23.000 $25.000 $30.000 $34.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 41,214.000 $0.150 $0.250 $0.200 $0.300
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 20,607.000 $0.150 $0.380 $0.250 $0.700
MTL W-BEAM GD FEN (TIM POST)
LF 125.000 $22.000 $35.000 $35.000 $42.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,500.000 $3,700.000 $3,200.000 $3,300.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 4.000 $200.000 $330.000 $250.000 $400.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 12.000 $650.000 $570.000 $600.000 $850.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 87.000 $450.000 $500.000 $850.000 $900.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 18.000 $85.000 $98.000 $75.000 $100.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,655.000 $1.000 $0.600 $1.000 $2.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 41,431.000 $0.340 $0.500 $1.000 $0.520
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 6,742.000 $0.360 $0.500 $1.000 $0.580
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 9,125.000 $0.340 $0.500 $1.000 $0.520
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 48.000 $15.000 $22.000 $10.000 $16.000
REFL PAV MRKR TY II-A-A
EA 292.000 $3.750 $4.400 $10.000 $6.000
D-GR HMA TY-B PG64-22
TON 5,568.000 $90.000 $120.000 $115.000 $151.500
D-GR HMA TY-D SAC-B PG70-22
TON 1,954.000 $105.000 $112.000 $110.000 $149.000
TACK COAT
GAL 1,353.000 $3.150 $4.000 $5.000 $2.500
TMA (STATIONARY)
DAY 75.000 $250.000 $250.000 $350.000 $200.000
TMA (MOBILE OPERATION)
DAY 15.000 $250.000 $100.000 $350.000 $775.000
Totals: $1,887,194.060 $2,189,864.650 $2,390,337.550 $2,629,105.180