Job Info for 0043-17-035

County: WICHITA Highway: BU 287J Date: 05/03/2024 (6 months ago) Engineer's Estimate: $1,230,286 Control Number: 0043-17-035
Project: F 2B24(023) District: WICHITA FALLS Time: 167 WORKING DAYS Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Bidder's List
Email All | Notice | Questions
HCS
Pay Estimates: 1 | 2 | 3 | 4
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,230,286.20
3LW CIVIL LLC   $1,028,500.80 1
-16.4% | -$201,785.40
ENCINO LANDSCAPE, INC.   $1,164,108.00 2
-5.38% | -$66,178.20
13.18% | $135,607.20
TALBERT COMPANIES LLC   $1,182,064.80 3
-3.92% | -$48,221.40
14.93% | $153,564.00
1.54% | $17,956.80
TI-ZACK CONCRETE, LLC   $1,493,765.60 4
21.42% | $263,479.40
45.24% | $465,264.80
26.37% | $311,700.80
Subcontractor Percentage Amount
VACA UNDERGROUND UTILITIES INC 10.42% $107,169.78
AWP SAFETY 2.72% $27,975.22
LONE STAR PRODUCTS (WICHITA FALLS) 2.21% $22,729.87
KING GEORGE TRAFFIC SOLUTIONS LLC 0.81% $8,330.86
Total: 16.16% $166,205.73

Bid Items

Items: 41, 0 filtered
WICHITA BU 287J  |  WICHITA FALLS  |  0043-17-035  |  05/03/2024  |  $1,230,286  |  F 2B24(023)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  167 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate 3LW CIVIL LLC ENCINO LANDSCAPE, INC. TALBERT COMPANIES LLC TI-ZACK CONCRETE, LLC
104 6017 REMOVING CONC (DRIVEWAYS) SY 1,486.000 $30.000 $25.000 $30.000 $19.800 $36.820
104 6029 REMOVING CONC (CURB OR CURB & GUTTER) LF 684.000 $24.000 $25.000 $30.000 $13.200 $16.000
104 6036 REMOVING CONC (SIDEWALK OR RAMP) SY 183.000 $30.000 $25.000 $30.000 $17.600 $29.900
105 6011 REMOVING STAB BASE AND ASPH PAV (2"-6") SY 826.000 $10.000 $14.000 $30.000 $9.900 $26.500
420 6007 CL A CONC (FLUME) CY 5.000 $1,100.000 $688.000 $1,000.000 $1,320.000 $1,209.930
420 6066 CL C CONC (RAIL FOUNDATION) CY 13.000 $1,000.000 $725.000 $1,000.000 $825.000 $1,209.930
432 6006 RIPRAP (CONC)(CL B) CY 0.400 $1,000.000 $750.000 $1,000.000 $660.000 $1,209.930
450 6029 RAIL (TY C1W) LF 66.000 $400.000 $485.000 $350.000 $352.000 $550.000
451 6030 RETROFIT RAIL (TY C1W) LF 32.000 $400.000 $485.000 $230.000 $770.000 $500.340
464 6003 RC PIPE (CL III)(18 IN) LF 8.000 $120.000 $125.000 $200.000 $165.000 $275.000
479 6001 ADJUSTING MANHOLES EA 11.000 $1,200.000 $900.000 $800.000 $1,870.000 $994.910
479 6005 ADJUSTING MANHOLES (WATER VALVE BOX) EA 7.000 $1,200.000 $700.000 $800.000 $1,320.000 $156.340
479 6008 ADJUSTING MANHOLES (WATER METER) EA 4.000 $1,000.000 $700.000 $800.000 $1,672.000 $2,736.000
496 6099 REMOVE STR (RAIL) LF 135.000 $22.000 $30.000 $10.000 $44.000 $81.070
500 6001 MOBILIZATION LS 1.000 $111,844.200 $125,000.000 $117,000.000 $125,000.000 $190,782.830
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 10.000 $8,000.000 $8,380.000 $3,000.000 $8,800.000 $2,750.000
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 40.000 $15.000 $6.500 $10.000 $11.000 $5.500
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 40.000 $1.000 $1.000 $1.000 $4.400 $5.500
529 6008 CONC CURB & GUTTER (TY II) LF 567.000 $55.000 $39.820 $35.000 $33.000 $69.440
530 6004 DRIVEWAYS (CONC) SY 2,256.000 $120.000 $95.000 $111.000 $114.400 $133.590
531 6002 CONC SIDEWALKS (5") SY 2,999.000 $110.000 $78.000 $111.000 $86.900 $142.960
531 6006 CURB RAMPS (TY 3) EA 6.000 $3,200.000 $1,900.000 $2,400.000 $4,070.000 $2,487.300
531 6010 CURB RAMPS (TY 7) EA 20.000 $2,600.000 $1,900.000 $2,400.000 $2,860.000 $2,487.300
531 6032 CONC SIDEWALKS (SPECIAL) (TYPE A) SY 20.000 $500.000 $196.560 $200.000 $385.000 $757.420
545 6018 CRASH CUSH ATTEN (INSTL)(S)(N)(TL2) EA 1.000 $10,000.000 $8,500.000 $14,000.000 $13,200.000 $22,000.000
618 6029 CONDT (PVC) (SCH 40) (3") LF 130.000 $25.000 $27.500 $40.000 $33.000 $137.500
618 6059 CONDT (PVC) (SCH 80) (4") (BORE) LF 220.000 $44.000 $82.500 $60.000 $71.500 $165.000
620 6007 ELEC CONDR (NO.8) BARE LF 350.000 $2.000 $3.300 $4.000 $5.500 $11.000
624 6010 GROUND BOX TY D (162922)W/APRON EA 8.000 $2,300.000 $1,650.000 $1,000.000 $1,980.000 $1,650.000
644 6068 RELOCATE SM RD SN SUP&AM TY 10BWG EA 5.000 $700.000 $550.000 $500.000 $715.000 $495.000
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 492.000 $8.000 $6.000 $8.000 $13.200 $11.000
666 6182 REFL PAV MRK TY II (W) 24" (SLD) LF 492.000 $4.000 $3.690 $8.000 $6.600 $3.840
678 6008 PAV SURF PREP FOR MRK (24") LF 492.000 $3.000 $0.540 $8.000 $1.100 $0.540
682 6018 PED SIG SEC (LED)(COUNTDOWN) EA 6.000 $1,000.000 $1,100.000 $1,000.000 $1,100.000 $1,650.000
684 6031 TRF SIG CBL (TY A)(14 AWG)(5 CONDR) LF 1,885.000 $5.000 $2.750 $4.000 $4.620 $6.600
684 6079 TRF SIG CBL (TY C)(12 AWG)(2 CONDR) LF 1,885.000 $3.000 $2.750 $4.000 $4.400 $6.600
687 6001 PED POLE ASSEMBLY EA 5.000 $3,500.000 $3,850.000 $3,000.000 $3,520.000 $6,600.000
688 6001 PED DETECT PUSH BUTTON (APS) EA 6.000 $1,600.000 $1,100.000 $1,000.000 $1,320.000 $3,850.000
688 6003 PED DETECTOR CONTROLLER UNIT EA 2.000 $3,700.000 $6,050.000 $4,500.000 $4,950.000 $13,750.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 167.000 $63.000 $120.000 $150.000 $121.000 $1.100
6185 6002 TMA (STATIONARY) DAY 167.000 $260.000 $85.000 $300.000 $231.000 $1.100
Totals: $1,230,286.20 $1,028,500.80 $1,164,108.00 $1,182,064.80 $1,493,765.60