Job Info for 0043-09-137

County: WICHITA Highway: US 287 Date: 01/08/2019 (5 years ago) Engineer's Estimate: $6,566,972 Control Number: 0043-09-137
Project: NH 2019(331) District: WICHITA FALLS Time: 128 WORKING DAYS Type: MILL AND OVERLAY

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $6,566,972.49
ZACK BURKETT CO.   $6,221,093.62 1
-5.27% | -$345,878.87
DUININCK, INC.   $7,358,390.00 2
12.05% | $791,417.51
18.28% | $1,137,296.38

Bid Items

Items: 46, 0 filtered
WICHITA US 287  |  WICHITA FALLS  |  0043-09-137  |  01/08/2019  |  $6,566,972  |  NH 2019(331)  |  MILL AND OVERLAY  |  128 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate ZACK BURKETT CO. DUININCK, INC.
104 6009 REMOVING CONC (RIPRAP) SY 20.000 $35.000 $236.000 $215.000
104 6023 REMOVING CONC (CTB) LF 50.000 $25.000 $118.000 $105.000
132 6019 EMBANKMENT (VEHICLE)(ORD COMP)(TY B) CY 49.000 $75.000 $29.500 $46.500
134 6002 BACKFILL (TY B) STA 282.000 $250.000 $225.000 $130.000
164 6021 CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) SY 1,340.000 $2.000 $1.950 $1.750
168 6001 VEGETATIVE WATERING MG 10.000 $90.000 $35.000 $28.000
341 6045 D-GR HMA TY-D SAC-B PG70-28 TON 28,189.000 $92.000 $87.500 $105.000
342 6002 PFC (ASPHALT) PG76-22 TON 1,389.000 $565.000 $650.000 $640.000
342 6006 PFC-C (AGGREGATE)(PG76 MIX) SAC-A TON 21,767.000 $72.000 $64.000 $80.000
351 6002 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") SY 100.000 $175.000 $54.000 $125.000
351 6019 FLEXIBLE PAVEMENT STRUCTURE REPAIR(3") SY 6,325.000 $25.000 $20.700 $32.000
354 6021 PLANE ASPH CONC PAV(0" TO 2") SY 18,273.000 $2.250 $4.900 $2.650
354 6029 PLANE ASPH CONC PAV(0" TO 6") SY 4,391.000 $5.750 $8.000 $6.000
354 6051 PLANE ASPH CONC PAV (0" TO 1 1/2") SY 10,096.000 $3.900 $4.130 $2.300
354 6090 PLANE ASPH CONC PAV (3/4") SY 56,643.000 $0.750 $1.480 $1.300
432 6004 RIPRAP CONC (8 IN) CY 5.000 $750.000 $885.000 $800.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 51.000 $450.000 $826.000 $640.000
500 6001 MOBILIZATION LS 1.000 $591,979.000 $220,060.000 $470,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 8.000 $6,900.000 $3,900.000 $21,000.000
514 6013 PERM CTB (F-SHAPE) (TY 1) LF 50.000 $175.000 $413.000 $370.000
533 6003 RUMBLE STRIPS (SHOULDER) ASPHALT LF 144,440.000 $0.120 $0.210 $0.110
533 6004 RUMBLE STRIPS (CENTERLINE) ASPHALT LF 24,672.000 $0.120 $0.250 $0.190
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 575.000 $25.000 $28.320 $22.500
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 5.000 $1,850.000 $2,478.000 $1,900.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 675.000 $3.000 $4.720 $4.250
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 5.000 $2,400.000 $3,658.000 $3,000.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 5.000 $250.000 $472.000 $425.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 41.000 $650.000 $1,386.500 $885.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 136.000 $625.000 $1,062.000 $595.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 18.000 $27.500 $41.300 $25.500
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 1,695.000 $1.500 $1.000 $1.050
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 1,529.000 $1.500 $1.000 $1.050
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 11,674.000 $1.050 $1.040 $0.940
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 36.000 $15.000 $7.900 $7.150
666 6102 REF PAV MRK TY I(W)36"(YLD TRI)(100MIL) EA 122.000 $65.000 $70.000 $64.000
666 6300 RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) LF 22,803.000 $0.470 $0.530 $0.480
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 131,854.000 $0.330 $0.510 $0.460
666 6312 RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF 6,100.000 $0.400 $0.530 $0.480
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 102,548.000 $0.290 $0.510 $0.460
672 6007 REFL PAV MRKR TY I-C EA 128.000 $4.900 $11.800 $10.500
672 6009 REFL PAV MRKR TY II-A-A EA 430.000 $3.500 $4.720 $4.250
672 6010 REFL PAV MRKR TY II-C-R EA 1,034.000 $3.900 $4.720 $4.250
3002 6001 MEMBRANE UNDERSEAL GAL 83,245.000 $2.300 $2.360 $2.650
3066 6001 BONDING COURSE GAL 1,265.000 $4.750 $3.790 $4.250
6185 6002 TMA (STATIONARY) DAY 76.000 $225.000 $177.000 $255.000
6185 6005 TMA (MOBILE OPERATION) DAY 66.000 $475.000 $29.500 $905.000
Totals: $6,566,972.49 $6,221,093.62 $7,358,390.00