WICHITA IH 44 (0043-09-135)

Items: 50

County: WICHITA
Length: N/A
Highway: IH 44
District: WICHITA FALLS
Control Number: 0043-09-135
DBE Goal: N/A
Project: C 43-9-135
Guaranty: N/A
Time: 119 WORKING DAYS
Engineer's Estimate: $8,924,359.34
Date: 06/06/2018 (7 years ago)
Contract Number: N/A
Type: MILL & OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$8,924,359.34
$8,831,585.37
Over/Under Est: -1.04% -$92,773.97
$10,146,535.52
Over/Under Est: 13.69% $1,222,176.18
Amt Left: 14.89% $1,314,950.15
Over/Under Est: 17.04% $1,520,703.01
Amt Left: 18.27% $1,613,476.98
Delta: -2.94% -$298,526.83

Bid Items & Bid Tabulations

50 Total 0 of 50
WICHITA  |  IH 44  |  WICHITA FALLS  |  0043-09-135  |  06/06/2018  |  $8,924,359.34  |  C 43-9-135  |  MILL & OVERLAY  |  119 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ZACK BURKETT CO.
DUININCK, INC.
KIEWIT INFRASTRUCTURE SOUTH CO.
REMOVING STAB BASE & ASPH PAV (0-6")
SY 5,656.000 $9.300 $6.000 $10.500 $3.250
EXCAVATION (ROADWAY)
CY 2,041.000 $7.100 $7.000 $31.000 $6.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 4,163.000 $2.910 $27.000 $32.500 $25.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 60,554.000 $0.350 $0.140 $0.110 $0.130
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 60,554.000 $0.550 $0.140 $0.070 $0.130
VEGETATIVE WATERING
MG 511.000 $31.040 $25.000 $27.500 $28.000
SUPERPAVE MIXTURES SP-D PG64-22
TON 276.000 $74.000 $95.000 $230.000 $280.000
TBPFC (MEMBRANE)
GAL 189,030.000 $1.700 $3.470 $3.700 $3.340
TBPFC (ASPHALT)(PG 76-22)
TON 2,448.000 $101.000 $790.000 $685.000 $748.000
TBPFC (AGGREGATE) (SAC-A)
TON 38,357.000 $101.000 $61.000 $94.000 $81.500
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 426,228.000 $1.190 $1.450 $1.300 $1.640
FULL - DEPTH REPAIR CRCP (8")
SY 375.000 $275.000 $242.000 $370.000 $162.000
RIPRAP (CONC)(4 IN)
CY 859.000 $490.000 $700.000 $640.000 $500.000
RIPRAP (MOW STRIP)(4 IN)
CY 1,560.000 $490.000 $439.000 $400.000 $500.000
ADJUSTING MANHOLES
EA 2.000 $599.000 $250.000 $2,100.000 $3,000.000
MOBILIZATION
LS 1.000 $784,975.250 $200,000.000 $430,000.000 $1,017,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $10,000.000 $5,700.000 $20,000.000 $32,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 420.000 $5.000 $11.700 $3.450 $11.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 420.000 $2.500 $2.340 $1.050 $2.200
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 213,081.000 $0.110 $0.140 $0.090 $0.110
MTL W-BEAM GD FEN (TIM POST)
LF 14,850.000 $17.850 $23.400 $21.500 $22.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 34.000 $1,750.000 $2,223.000 $2,000.000 $2,100.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 9,037.000 $15.000 $8.190 $7.450 $7.800
MTL THRIE-BEAM GD FEN ADJUSTMENT
LF 338.000 $30.000 $23.400 $21.500 $22.000
TRANSITION ADJUSTMENT
EA 8.000 $1,100.000 $585.000 $530.000 $550.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 15.000 $1,007.000 $1,140.750 $1,000.000 $1,075.000
MTL BM GD FEN TRANS (NON - SYM)
EA 15.000 $794.000 $848.250 $770.000 $790.000
DOWNSTREAM ANCHOR TERMINAL ADJUSTMENT
EA 6.000 $300.000 $468.000 $425.000 $440.000
REMOVE METAL BEAM GUARD FENCE
LF 15,225.000 $3.400 $2.340 $2.150 $2.200
REMOVE TERMINAL ANCHOR SECTION
EA 15.000 $274.000 $292.500 $265.000 $275.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 6.000 $200.000 $292.500 $265.000 $275.000
CABLE BARRIER SYSTEM (TL-4)
LF 44,598.000 $17.000 $10.000 $9.150 $9.500
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 16.000 $3,000.000 $2,925.000 $2,700.000 $2,750.000
GUARDRAIL END TREATMENT (INSTALL)
EA 35.000 $2,300.000 $3,100.000 $2,800.000 $2,900.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 16.000 $870.000 $1,755.000 $1,600.000 $1,650.000
GUARDRAIL END TREATMENT (REMOVE)
EA 35.000 $235.000 $292.500 $265.000 $275.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 670.000 $19.000 $11.700 $10.500 $11.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 32,228.000 $0.210 $0.360 $0.330 $0.340
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 9,720.000 $1.090 $1.000 $1.050 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 28,416.000 $0.780 $0.940 $0.850 $0.880
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 32,228.000 $0.380 $0.470 $0.430 $0.440
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 123,999.000 $0.210 $0.340 $0.310 $0.320
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 129,034.000 $0.250 $0.340 $0.310 $0.320
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
LF 1,060.000 $2.720 $2.340 $2.150 $2.200
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 44.000 $13.490 $14.630 $13.500 $13.750
PREFAB PAV MRK TY C (W) (ARROW)
EA 4.000 $200.000 $245.000 $225.000 $230.000
REFL PAV MRKR TY II-C-R
EA 1,632.000 $2.540 $4.080 $3.700 $3.850
JT / CRCK ROUT / SEAL(RUBBER - ASPHALT)
LF 3,171.000 $2.000 $2.500 $21.500 $5.500
TMA (STATIONARY)
DAY 111.000 $175.000 $117.000 $105.000 $320.000
TMA (MOBILE OPERATION)
HR 48.000 $53.020 $40.000 $100.000 $50.000
Totals: $8,924,359.340 $8,831,585.370 $10,146,535.520 $10,445,062.350