|
|
PREPARING ROW
|
STA
|
5.000
|
$8,500.000
|
$25,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
381.000
|
$47.500
|
$20.000
|
|
|
REMOVING STAB BASE & ASPH PAV(14")
|
SY
|
3,292.000
|
$16.500
|
$25.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
5,120.000
|
$35.000
|
$25.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
6,652.000
|
$25.000
|
$40.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
5,892.000
|
$0.400
|
$1.000
|
|
|
FL BS (CMP IN PLC)(TY B GR 3)(FNAL POS)
|
CY
|
1,118.000
|
$125.000
|
$125.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,208.000
|
$9.000
|
$14.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
2,011.000
|
$8.000
|
$14.000
|
|
|
AGGR(TY-L GR-4S SAC-A)
|
CY
|
36.000
|
$200.000
|
$300.000
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
83.000
|
$20.000
|
$25.000
|
|
|
CEM STABIL BKFL
|
CY
|
321.900
|
$320.000
|
$380.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
190.000
|
$150.000
|
$140.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
4,980.000
|
$320.000
|
$380.000
|
|
|
CL C CONC (ABUT)
|
CY
|
104.200
|
$1,400.000
|
$2,500.000
|
|
|
CL C CONC (CAP)
|
CY
|
271.500
|
$1,300.000
|
$2,500.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
173.800
|
$1,600.000
|
$2,500.000
|
|
|
REINF CONC SLAB
|
SF
|
57,520.000
|
$28.000
|
$45.000
|
|
|
APPROACH SLAB
|
CY
|
159.300
|
$850.000
|
$1,800.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
6,749.500
|
$280.000
|
$325.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
1,995.600
|
$170.000
|
$250.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
68.000
|
$670.000
|
$750.000
|
|
|
RAIL (TY SSTR)
|
LF
|
3,320.000
|
$180.000
|
$140.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
330.000
|
$210.000
|
$300.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
50.000
|
$200.000
|
$150.000
|
|
|
SET (TY I) (24 IN) (4: 1) (C)
|
EA
|
4.000
|
$11,340.000
|
$2,000.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$650.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
25.000
|
$30.000
|
$30.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$160,000.000
|
$375,000.000
|
|
|
REMOV STR (BRIDGE 1000 FT OR GREATER)
|
EA
|
1.000
|
$950,000.000
|
$750,000.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
834.000
|
$22.000
|
$2.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,094,962.740
|
$1,500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
17.000
|
$6,000.000
|
$4,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
561.000
|
$38.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
561.000
|
$11.000
|
$15.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
4,338.000
|
$150.000
|
$100.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
1.000
|
$11,000.000
|
$12,000.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
163.000
|
$65.000
|
$50.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,550.000
|
$40.000
|
$35.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$3,000.000
|
$2,600.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
880.000
|
$3.100
|
$3.500
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$300.000
|
$250.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$3,800.000
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$320.000
|
$250.000
|
|
|
GATE (INSTALL) (DOUBLE) (6' X 14')
|
EA
|
1.000
|
$1,500.000
|
$1,800.000
|
|
|
WIRE FENCE (TY A)
|
LF
|
4,529.000
|
$20.000
|
$30.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$890.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
6.000
|
$1,000.000
|
$1,100.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
7.000
|
$135.000
|
$300.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
7,860.000
|
$1.500
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
8,255.000
|
$1.500
|
$3.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
20.000
|
$0.550
|
$4.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
8,240.000
|
$0.550
|
$4.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
8,240.000
|
$0.550
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
105.000
|
$3.500
|
$24.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,695.000
|
$0.400
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
24.000
|
$3.750
|
$25.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
6,808.000
|
$0.400
|
$3.000
|
|
|
D-GR HMA TY-D SAC-A PG70-28 (EXEMPT)
|
TON
|
444.000
|
$240.000
|
$280.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
1,208.000
|
$3.750
|
$20.000
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
4.000
|
$315.000
|
$2,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$12,200.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
49.000
|
$260.000
|
$150.000
|
|
Totals: |
$11,343,321.240
|
$14,263,414.500
|