County: WHARTON Highway: VA Date: 09/07/2022 (2 years ago) Engineer's Estimate: $650,044 Control Number: 0913-09-116
Project: STP 2022(392)TAPS District: YOAKUM Time: 120 WORKING DAYS Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $650,044.00
ENCINO LANDSCAPE, INC.   $664,041.50 1
2.15% | $13,997.50
LUCANIA CONSTRUCTION LLC   $744,937.00 2
14.6% | $94,893.00
12.18% | $80,895.50
FNH CONSTRUCTION, LLC   $758,192.00 3
16.64% | $108,148.00
14.18% | $94,150.50
1.78% | $13,255.00
PROJECT ALLIED RESOURCES, LLC   $839,919.90 4
29.21% | $189,875.90
26.49% | $175,878.40
10.78% | $81,727.90

Bid Items

Items: 31, 0 filtered
WHARTON VA  |  YOAKUM  |  0913-09-116  |  09/07/2022  |  $650,044  |  STP 2022(392)TAPS  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  120 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate ENCINO LANDSCAPE, INC. LUCANIA CONSTRUCTION LLC FNH CONSTRUCTION, LLC PROJECT ALLIED RESOURCES, LLC
104 6001 REMOVING CONC (PAV) SY 101.000 $35.000 $20.000 $25.000 $55.000 $18.700
104 6017 REMOVING CONC (DRIVEWAYS) SY 495.000 $30.000 $20.000 $25.000 $55.000 $18.700
104 6022 REMOVING CONC (CURB AND GUTTER) LF 307.000 $15.000 $10.000 $16.000 $20.000 $8.000
105 6011 REMOVING STAB BASE AND ASPH PAV (2"-6") SY 190.000 $35.000 $20.000 $24.000 $20.000 $10.300
160 6005 FURNISHING AND PLACING TOPSOIL CY 30.000 $40.000 $50.000 $150.000 $80.000 $52.000
162 6002 BLOCK SODDING SY 3,800.000 $7.500 $6.000 $7.500 $10.000 $3.660
168 6001 VEGETATIVE WATERING MG 60.000 $50.000 $20.000 $150.000 $50.000 $67.000
351 6002 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") SY 219.900 $60.000 $75.000 $160.000 $200.000 $80.000
360 6016 CONC PVMT (JOINTED - CPCD) (6") SY 33.000 $100.000 $190.000 $275.000 $300.000 $185.000
464 6001 RC PIPE (CL III)(12 IN) LF 12.000 $120.000 $100.000 $220.000 $85.000 $340.000
500 6001 MOBILIZATION LS 1.000 $60,000.000 $50,000.000 $45,000.000 $70,000.000 $84,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 8.000 $3,000.000 $5,000.000 $3,700.000 $8,500.000 $5,800.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 65.000 $7.000 $5.000 $7.000 $4.000 $9.600
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 65.000 $3.000 $1.000 $4.000 $2.000 $2.460
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 430.000 $5.000 $1.000 $15.000 $9.000 $5.600
506 6045 BIODEG EROSN CONT LOGS (INSTL) (6") LF 430.000 $10.000 $8.000 $5.000 $18.000 $12.000
529 6007 CONC CURB & GUTTER (TY I) LF 11.000 $55.000 $35.000 $40.000 $55.000 $54.000
529 6008 CONC CURB & GUTTER (TY II) LF 104.000 $55.000 $40.000 $40.000 $55.000 $55.000
530 6004 DRIVEWAYS (CONC) SY 793.000 $95.000 $100.000 $115.000 $105.000 $126.000
531 6002 CONC SIDEWALKS (5") SY 3,616.000 $90.000 $100.000 $107.000 $75.000 $127.000
531 6018 CURB RAMPS (TY 1) SY 54.700 $200.000 $140.000 $200.000 $320.000 $195.000
531 6019 CURB RAMPS (TY 2) SY 45.000 $300.000 $140.000 $200.000 $320.000 $195.000
531 6022 CURB RAMPS (TY 5) SY 69.400 $200.000 $140.000 $200.000 $320.000 $195.000
531 6024 CURB RAMPS (TY 7) SY 30.000 $275.000 $140.000 $200.000 $320.000 $195.000
531 6027 CURB RAMPS (TY 10) SY 29.000 $300.000 $140.000 $200.000 $320.000 $195.000
560 6007 MAILBOX INSTALL-S (WC-POST) TY 3 EA 7.000 $200.000 $250.000 $800.000 $850.000 $498.000
644 6071 RELOCATE SM RD SN SUP&AM TY TWT EA 11.000 $450.000 $500.000 $300.000 $850.000 $646.000
668 6074 PREFAB PAV MRK TY C (W) (12") (SLD) LF 673.000 $10.000 $20.000 $10.000 $20.000 $19.700
677 6005 ELIM EXT PAV MRK & MRKS (12") LF 70.000 $5.000 $10.000 $5.000 $20.000 $12.200
677 6006 ELIM EXT PAV MRK & MRKS (18") LF 74.000 $5.000 $10.000 $6.000 $20.000 $15.300
6185 6002 TMA (STATIONARY) DAY 5.000 $500.000 $400.000 $600.000 $350.000 $513.000
Totals: $650,044.00 $664,041.50 $744,937.00 $758,192.00 $839,919.90