Job Info for 0913-09-106

County: WHARTON Highway: CR Date: 06/01/2022 (2 years ago) Engineer's Estimate: $835,411 Control Number: 0913-09-106
Project: BR 2020(911) District: YOAKUM Time: 120 WORKING DAYS Type: BRIDGE REPLACEMENT
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $835,410.70
TEXAS STEEL INDUSTRIAL PLACING, LLC   $958,659.00 1
14.75% | $123,248.30
CONSTAR CONSTRUCTION   $961,527.80 2
15.1% | $126,117.10
0.3% | $2,868.80
MB WESTERN INDUSTRIAL CONTRACTING COMPANY   $1,780,538.33 3
113.13% | $945,127.63
85.73% | $821,879.33
85.18% | $819,010.53
Subcontractor Percentage Amount
WEBER-BALKE FOUNDATION COMPANY, INC 6.23% $59,724.46
A K FUQUAY CONSTRUCTION 1.16% $11,120.44
HOUSTON SAWING & DRILLING 0.38% $3,642.90
Total: 7.77% $74,487.80

Bid Items

Items: 45, 0 filtered
WHARTON CR  |  YOAKUM  |  0913-09-106  |  06/01/2022  |  $835,411  |  BR 2020(911)  |  BRIDGE REPL  |  120 WORKING DAYS
Alt Item code Description Unit Quantity Engineer's Estimate TEXAS STEEL INDUSTRIAL PLACING, LLC CONSTAR CONSTRUCTION MB WESTERN INDUSTRIAL CONTRACTING COMPANY
100 6002 PREPARING ROW STA 5.350 $3,000.000 $1,150.000 $2,500.000 $7,282.000
110 6001 EXCAVATION (ROADWAY) CY 263.000 $22.000 $20.000 $30.000 $111.330
110 6002 EXCAVATION (CHANNEL) CY 117.000 $20.000 $25.000 $35.000 $125.000
132 6005 EMBANKMENT (FINAL)(ORD COMP)(TY C) CY 218.000 $25.000 $25.000 $30.000 $148.000
150 6002 BLADING HR 30.000 $150.000 $125.000 $110.000 $189.000
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 4,975.000 $2.000 $1.500 $1.000 $1.250
164 6009 BROADCAST SEED (TEMP) (WARM) SY 1,245.000 $1.000 $4.000 $1.000 $3.650
164 6011 BROADCAST SEED (TEMP) (COOL) SY 1,245.000 $1.000 $4.000 $1.000 $3.650
168 6001 VEGETATIVE WATERING MG 53.600 $50.000 $75.000 $100.000 $25.000
247 6366 FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS) CY 371.000 $90.000 $100.000 $130.000 $122.500
400 6005 CEM STABIL BKFL CY 90.000 $140.000 $150.000 $120.000 $125.000
403 6001 TEMPORARY SPL SHORING SF 540.000 $25.000 $45.000 $25.000 $90.000
409 6002 PRESTR CONC PIL (18 IN SQ) LF 615.000 $160.000 $200.000 $170.000 $146.650
420 6013 CL C CONC (ABUT) CY 27.000 $1,200.000 $1,050.000 $1,100.000 $1,300.000
420 6029 CL C CONC (CAP) CY 9.300 $1,350.000 $1,150.000 $1,300.000 $1,357.000
422 6007 REINF CONC SLAB (SLAB BEAM) SF 2,248.000 $25.000 $20.000 $25.000 $190.000
425 6009 PRESTR CONC SLAB BEAM (4SB12) LF 551.380 $165.000 $200.000 $210.000 $182.000
432 6033 RIPRAP (STONE PROTECTION)(18 IN) CY 332.000 $175.000 $195.000 $210.000 $235.750
450 6006 RAIL (TY T223) LF 168.000 $120.000 $125.000 $145.000 $112.120
450 6019 RAIL (TY T631LS) LF 125.000 $100.000 $75.000 $90.000 $85.000
454 6004 ARMOR JOINT (SEALED) LF 66.000 $80.000 $150.000 $80.000 $180.000
462 6020 CONC BOX CULV (8 FT X 5 FT) LF 93.000 $635.000 $875.000 $1,500.000 $1,177.250
466 6181 WINGWALL (PW - 1) (HW=6 FT) EA 2.000 $16,000.000 $22,500.000 $20,000.000 $6,860.000
496 6009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) EA 2.000 $20,000.000 $20,000.000 $20,000.000 $11,601.500
496 6016 REMOV STR (PIPE) EA 1.000 $400.000 $850.000 $1,300.000 $2,950.000
500 6001 MOBILIZATION LS 1.000 $75,000.000 $73,000.000 $80,000.000 $168,090.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 8.000 $3,000.000 $1,150.000 $2,000.000 $1,100.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 768.000 $3.000 $3.500 $5.000 $10.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 768.000 $1.000 $1.250 $1.000 $2.430
508 6001 CONSTRUCTING DETOURS SY 871.000 $60.000 $110.000 $25.000 $183.100
512 6009 PORT CTB (FUR & INST)(LOW PROF)(TY 1) LF 160.000 $35.000 $80.000 $50.000 $723.330
512 6010 PORT CTB (FUR & INST)(LOW PROF)(TY 2) LF 80.000 $40.000 $80.000 $50.000 $723.330
512 6057 PORT CTB (REMOVE)(LOW PROF)(TY 1) LF 160.000 $20.000 $15.000 $10.000 $54.230
512 6058 PORT CTB (REMOVE)(LOW PROF)(TY 2) LF 80.000 $17.000 $15.000 $10.000 $54.230
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 50.000 $27.000 $39.000 $60.000 $39.500
540 6007 MTL BEAM GD FEN TRANS (TL2) EA 4.000 $1,700.000 $1,250.000 $2,000.000 $1,527.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 1.000 $1,500.000 $1,700.000 $1,300.000 $1,861.200
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 7.000 $3,000.000 $3,250.000 $3,500.000 $3,961.890
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 4.000 $22.000 $47.500 $30.000 $30.500
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 16.000 $27.000 $47.500 $30.000 $30.500
760 6001 DITCH CLEANING AND RESHAPING (FOOT) LF 75.000 $15.000 $40.000 $50.000 $115.680
1 464 6003 RC PIPE (CL III)(18 IN) LF 108.000 $70.000 $0.000 $100.000 $185.000
1 467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 1.000 $1,100.000 $0.000 $2,500.000 $3,973.500
1A 467 6351 SET (TY II) (18 IN) (HDPE) (6: 1) (P) EA 1.000 $1,100.000 $1,350.000 $0.000 $0.000
1A 4122 6023 THERMO PIPE(18")(PP)(TY S)(TY II) LF 108.000 $70.000 $75.000 $0.000 $0.000
Totals: $844,070.70 $958,659.00 $961,527.80 $1,780,538.33