Job Info for 0913-09-083

County: WHARTON Highway: CR Date: 10/04/2017 (7 years ago) Engineer's Estimate: $1,675,701 Control Number: 0913-09-083
Project: BR 1602(017) District: YOAKUM Time: 225 WORKING DAYS Type: REPLACE BRIDGE AND APPROACHES

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,675,701.00
SB CONTRACTORS LLC   $1,499,626.26 1
-10.51% | -$176,074.74
A GREATER AUSTIN DEVELOPMENT COMPANY, LTD.   $1,637,829.85 2
-2.26% | -$37,871.15
9.22% | $138,203.59
TREVWAY, INC.   $1,974,055.00 3
17.8% | $298,354.00
31.64% | $474,428.74
20.53% | $336,225.15
3LW CIVIL LLC   $2,013,797.00 4
20.18% | $338,096.00
34.29% | $514,170.74
2.01% | $39,742.00
FUQUA CONSTRUCTION CO., INC.   $2,161,636.00 5
29% | $485,935.00
44.14% | $662,009.74
7.34% | $147,839.00

Bid Items

Items: 51, 0 filtered
WHARTON CR  |  YOAKUM  |  0913-09-083  |  10/04/2017  |  $1,675,701  |  BR 1602(017)  |  REPLACE BRIDGE AND APPROACHES  |  225 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate SB CONTRACTORS LLC A GREATER AUSTIN DEVELOPMENT COMPANY, LTD. TREVWAY, INC. 3LW CIVIL LLC FUQUA CONSTRUCTION CO., INC.
100 6002 PREPARING ROW STA 7.720 $3,000.000 $3,000.000 $2,000.000 $3,400.000 $15,000.000 $3,000.000
100 6003 PREPARING ROW(TREE)(5" TO 12" DIA) EA 1.000 $800.000 $500.000 $650.000 $2,000.000 $1,000.000 $600.000
100 6004 PREPARING ROW(TREE)(12" TO 24" DIA) EA 6.000 $1,200.000 $500.000 $650.000 $4,500.000 $500.000 $1,000.000
100 6005 PREP ROW (TREE)(24"-30"DIA) EA 2.000 $2,000.000 $1,000.000 $910.000 $3,500.000 $700.000 $1,500.000
110 6001 EXCAVATION (ROADWAY) CY 628.000 $25.000 $15.000 $26.000 $9.000 $30.000 $40.000
132 6005 EMBANKMENT (FINAL)(ORD COMP)(TY C) CY 682.000 $30.000 $15.000 $32.000 $33.000 $30.000 $40.000
150 6002 BLADING HR 75.000 $100.000 $100.000 $115.000 $100.000 $150.000 $65.000
164 6023 CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) SY 4,112.000 $2.000 $1.000 $1.600 $2.000 $1.000 $2.000
164 6029 CELL FBR MLCH SEED(TEMP)(WARM) SY 1,028.000 $2.000 $1.000 $2.400 $2.000 $1.000 $2.000
164 6031 CELL FBR MLCH SEED(TEMP)(COOL) SY 1,028.000 $2.000 $1.000 $2.400 $2.000 $1.000 $2.000
168 6001 VEGETATIVE WATERING MG 34.600 $100.000 $65.000 $100.000 $100.000 $80.000 $60.000
247 6366 FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS) CY 929.000 $110.000 $100.000 $160.000 $200.000 $70.000 $100.000
310 6009 PRIME COAT (MC-30) GAL 607.000 $5.000 $23.000 $9.000 $22.000 $6.000 $12.000
316 6246 AGGR(TY-PE GR-3 SAC-B) CY 36.000 $125.000 $550.000 $370.000 $400.000 $300.000 $550.000
316 6249 AGGR(TY-PE GR-4 SAC-B) CY 24.000 $125.000 $550.000 $370.000 $400.000 $300.000 $550.000
316 6400 ASPH (AC-15P OR AC-10-2TR OR CRS-2P) GAL 2,248.000 $5.000 $18.000 $8.000 $12.000 $6.000 $15.000
400 6005 CEM STABIL BKFL CY 233.400 $100.000 $185.000 $230.000 $200.000 $200.000 $125.000
402 6001 TRENCH EXCAVATION PROTECTION LF 73.000 $10.000 $5.000 $1.000 $100.000 $10.000 $25.000
403 6001 TEMPORARY SPL SHORING SF 3,676.000 $20.000 $15.000 $21.000 $55.000 $35.000 $40.000
409 6002 PRESTR CONC PIL (18 IN SQ) LF 370.000 $130.000 $135.000 $100.000 $200.000 $200.000 $140.000
416 6002 DRILL SHAFT (24 IN) LF 330.000 $200.000 $210.000 $170.000 $325.000 $125.000 $294.000
420 6013 CL C CONC (ABUT) CY 43.600 $1,000.000 $850.000 $1,200.000 $600.000 $1,500.000 $1,600.000
420 6029 CL C CONC (CAP) CY 6.600 $1,200.000 $1,500.000 $1,800.000 $1,200.000 $800.000 $2,000.000
420 6037 CL C CONC (COLUMN) CY 3.900 $1,500.000 $1,100.000 $2,000.000 $1,500.000 $750.000 $1,600.000
422 6007 REINF CONC SLAB (SLAB BEAM) SF 3,365.000 $22.000 $21.000 $21.000 $27.000 $18.000 $30.000
425 6009 PRESTR CONC SLAB BEAM (4SB12) LF 316.000 $150.000 $165.000 $140.000 $200.000 $146.000 $200.000
425 6012 PRESTR CONC SLAB BEAM (5SB15) LF 395.000 $175.000 $165.000 $140.000 $210.000 $150.000 $200.000
432 6002 RIPRAP (CONC)(5 IN) CY 34.000 $450.000 $750.000 $520.000 $350.000 $650.000 $400.000
432 6024 RIPRAP (STONE COMMON)(DRY)(12 IN) CY 29.000 $175.000 $150.000 $200.000 $155.000 $200.000 $200.000
432 6026 RIPRAP (STONE COMMON)(DRY)(18 IN) CY 203.000 $200.000 $150.000 $170.000 $155.000 $150.000 $200.000
450 6006 RAIL (TY T223) LF 288.000 $125.000 $125.000 $170.000 $77.000 $110.000 $140.000
450 6018 RAIL (TY T631) LF 405.500 $80.000 $65.000 $96.000 $100.000 $100.000 $80.000
454 6004 ARMOR JOINT (SEALED) LF 100.000 $75.000 $75.000 $140.000 $77.000 $70.000 $115.000
462 6031 CONC BOX CULV (10 FT X 7 FT) LF 105.800 $1,200.000 $865.000 $760.000 $800.000 $800.000 $1,200.000
462 6033 CONC BOX CULV (10 FT X 9 FT) LF 226.300 $1,300.000 $850.000 $590.000 $725.000 $900.000 $1,200.000
466 6171 WINGWALL (PW - 1) (HW=10 FT) EA 2.000 $28,000.000 $25,000.000 $48,700.000 $17,000.000 $26,000.000 $39,000.000
466 6184 WINGWALL (PW - 1) (HW=9 FT) EA 2.000 $25,000.000 $21,000.000 $28,300.000 $17,000.000 $30,000.000 $67,000.000
496 6009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) EA 4.000 $20,000.000 $11,000.000 $17,600.000 $45,000.000 $21,750.000 $36,000.000
500 6001 MOBILIZATION LS 1.000 $140,000.000 $144,697.260 $163,500.000 $180,000.000 $200,000.000 $200,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 15.000 $2,500.000 $2,500.000 $3,500.000 $1,200.000 $20,000.000 $2,100.000
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 200.000 $50.000 $35.000 $48.000 $12.000 $35.000 $45.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 200.000 $10.000 $10.000 $12.500 $1.000 $10.000 $15.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 2,095.000 $3.000 $2.500 $3.700 $2.000 $3.500 $7.500
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 2,095.000 $2.000 $1.000 $1.100 $2.000 $1.000 $2.500
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 44.500 $30.000 $30.000 $20.500 $33.000 $25.000 $30.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 8.000 $1,500.000 $1,000.000 $1,700.000 $1,400.000 $1,800.000 $1,600.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 16.000 $2,200.000 $2,200.000 $2,300.000 $3,300.000 $2,450.000 $3,000.000
552 6001 WIRE FENCE (TY A) LF 250.000 $15.000 $16.000 $21.500 $22.000 $12.000 $15.000
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 12.000 $25.000 $20.000 $10.500 $33.000 $20.000 $40.000
658 6016 INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI) EA 20.000 $20.000 $16.000 $10.500 $15.000 $20.000 $34.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 16.000 $30.000 $16.000 $21.500 $15.000 $25.000 $50.000
Totals: $1,675,701.00 $1,499,626.26 $1,637,829.85 $1,974,055.00 $2,013,797.00 $2,161,636.00