County: WHARTON Highway: CR Date: 06/05/2020 (4 years ago) Engineer's Estimate: $1,358,189 Control Number: 0913-09-070
Project: BR 2014(680) District: YOAKUM Time: 210 WORKING DAYS Type: REPLACE BRIDGE AND APPROACHES
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,358,189.20
TREVWAY, INC.   $1,496,610.96 1
10.19% | $138,421.76
REXCO CONSTRUCTION SERVICES, INC.   $1,550,106.97 2
14.13% | $191,917.77
3.57% | $53,496.01
FUQUA CONSTRUCTION CO., INC.   $1,647,540.76 3
21.3% | $289,351.56
10.08% | $150,929.80
6.29% | $97,433.79
FNH CONSTRUCTION, LLC   $1,672,529.80 4
23.14% | $314,340.60
11.75% | $175,918.84
1.52% | $24,989.04
Subcontractor Percentage Amount
HEMPHILL WBE PILE DRIVING CO. 7.68% $114,939.72
LONE STAR PAVING COMPANY 3.53% $52,830.37
LONESTAR TRAFFIC SAFETY, LLC 0.56% $8,381.02
Total: 11.77% $176,151.11

Bid Items

Items: 44, 0 filtered
WHARTON CR  |  YOAKUM  |  0913-09-070  |  06/05/2020  |  $1,358,189  |  BR 2014(680)  |  REPLACE BRIDGE AND APPROACHES  |  210 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate TREVWAY, INC. REXCO CONSTRUCTION SERVICES, INC. FUQUA CONSTRUCTION CO., INC. FNH CONSTRUCTION, LLC
100 6002 PREPARING ROW STA 8.400 $3,000.000 $2,500.000 $4,300.000 $1,851.000 $10,000.000
110 6001 EXCAVATION (ROADWAY) CY 316.000 $20.000 $18.000 $35.000 $14.000 $20.000
110 6002 EXCAVATION (CHANNEL) CY 1,500.000 $20.000 $9.000 $30.000 $12.000 $20.000
132 6005 EMBANKMENT (FINAL)(ORD COMP)(TY C) CY 919.000 $25.000 $12.000 $30.010 $17.000 $30.000
150 6002 BLADING HR 35.000 $100.000 $50.000 $125.000 $151.000 $150.000
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 2,937.000 $2.000 $1.000 $1.220 $1.000 $1.000
164 6009 BROADCAST SEED (TEMP) (WARM) SY 735.000 $2.000 $1.000 $4.590 $1.000 $1.000
164 6011 BROADCAST SEED (TEMP) (COOL) SY 735.000 $2.000 $1.000 $4.590 $1.000 $1.000
168 6001 VEGETATIVE WATERING MG 25.000 $30.000 $50.000 $204.000 $10.000 $50.000
247 6366 FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS) CY 608.000 $110.000 $128.090 $152.320 $68.000 $60.000
316 6029 ASPH (RC-250) GAL 196.000 $25.000 $186.320 $16.020 $16.000 $10.000
316 6202 AGGR(TY-E GR-5 SAC-B) CY 10.000 $400.000 $1,136.840 $1,101.000 $744.000 $300.000
316 6249 AGGR(TY-PE GR-4 SAC-B) CY 10.000 $400.000 $1,263.160 $1,125.000 $744.000 $300.000
316 6400 ASPH (AC-15P OR AC-10-2TR OR CRS-2P) GAL 334.000 $20.000 $18.950 $14.440 $14.000 $10.000
400 6005 CEM STABIL BKFL CY 111.000 $100.000 $100.000 $101.300 $125.000 $350.000
409 6002 PRESTR CONC PIL (18 IN SQ) LF 1,450.000 $100.000 $156.860 $129.130 $213.000 $145.000
420 6013 CL C CONC (ABUT) CY 76.000 $1,100.000 $1,113.720 $1,453.280 $1,040.000 $1,000.000
420 6029 CL C CONC (CAP) CY 24.800 $1,300.000 $965.840 $3,288.150 $1,229.000 $1,000.000
422 6007 REINF CONC SLAB (SLAB BEAM) SF 7,615.000 $20.000 $19.000 $24.630 $27.000 $16.000
425 6010 PRESTR CONC SLAB BEAM (5SB12) LF 443.540 $160.000 $176.580 $147.790 $202.000 $185.000
425 6011 PRESTR CONC SLAB BEAM (4SB15) LF 348.000 $165.000 $185.180 $152.890 $202.000 $185.000
425 6012 PRESTR CONC SLAB BEAM (5SB15) LF 296.540 $170.000 $192.110 $157.230 $202.000 $185.000
432 6031 RIPRAP (STONE PROTECTION)(12 IN) CY 623.000 $140.000 $201.210 $124.150 $136.000 $185.000
450 6006 RAIL (TY T223) LF 570.000 $100.000 $91.820 $174.000 $115.000 $150.000
454 6004 ARMOR JOINT (SEALED) LF 176.000 $75.000 $70.160 $85.560 $107.000 $100.000
464 6003 RC PIPE (CL III)(18 IN) LF 24.000 $75.000 $115.010 $65.630 $77.000 $85.000
464 6005 RC PIPE (CL III)(24 IN) LF 545.000 $100.000 $84.980 $45.240 $114.000 $105.000
464 6009 RC PIPE (CL III)(42 IN) LF 160.000 $185.000 $162.090 $123.870 $193.000 $450.000
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 2.000 $1,600.000 $1,893.690 $2,034.760 $944.000 $1,850.000
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 4.000 $2,200.000 $1,893.680 $2,561.900 $1,097.000 $2,850.000
467 6466 SET (TY II) (42 IN) (RCP) (6: 1) (P) EA 1.000 $7,000.000 $14,763.160 $7,717.800 $2,614.000 $5,000.000
496 6009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) EA 3.000 $25,000.000 $25,000.000 $18,000.000 $20,779.000 $35,000.000
496 6042 REMOV STR (SMALL) EA 3.000 $500.000 $1,500.000 $900.000 $1,931.000 $2,500.000
500 6001 MOBILIZATION LS 1.000 $120,000.000 $150,000.000 $144,498.000 $212,990.000 $160,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 15.000 $3,000.000 $1,010.530 $907.800 $1,252.000 $5,000.000
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 90.000 $30.000 $45.600 $45.290 $78.000 $30.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 90.000 $10.000 $42.070 $16.630 $26.000 $15.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 1,908.000 $3.000 $3.000 $3.620 $4.000 $4.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 1,908.000 $1.000 $1.000 $0.990 $1.000 $2.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 12.000 $1,800.000 $1,551.650 $1,657.500 $2,113.000 $1,850.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 12.000 $2,800.000 $2,613.970 $2,830.500 $3,608.000 $2,850.000
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 14.000 $20.000 $6.320 $28.560 $36.000 $100.000
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 8.000 $25.000 $11.370 $45.900 $59.000 $100.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 16.000 $25.000 $11.370 $51.000 $65.000 $100.000
Totals: $1,358,189.20 $1,496,610.96 $1,550,106.97 $1,647,540.76 $1,672,529.80