Show Job Controls
Bid Cobra

WHARTON CR (0913-09-066)

Items: 46

County: WHARTON
Length: N/A
Highway: CR
District: YOAKUM
Control Number: 0913-09-066
DBE Goal: N/A
Project: BR 2019(301)
Guaranty: N/A
Time: 190 WORKING DAYS
Engineer's Estimate: $1,179,777.00
Date: 10/03/2018 (7 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$1,179,777.00
1
$1,094,298.00
Over/Under Est: -7.25% -$85,479.00
Over/Under Est: 14.24% $167,993.23
Amt Left: 23.16% $253,472.23
$1,523,849.55
Over/Under Est: 29.16% $344,072.55
Amt Left: 39.25% $429,551.55
Delta: -13.06% -$176,079.32
$2,000,828.50
Over/Under Est: 69.59% $821,051.50
Amt Left: 82.84% $906,530.50
Delta: -31.30% -$476,978.95

Bid Items & Bid Tabulations

46 Total 0 of 46
WHARTON  |  CR  |  YOAKUM  |  0913-09-066  |  10/03/2018  |  $1,179,777.00  |  BR 2019(301)  |  REPLACE BRIDGE AND APPROACHES  |  190 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TREVWAY, INC.
REXCO CONSTRUCTION SERVICES, INC.
ISI CONTRACTING, INC.
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 10.400 $2,500.000 $800.000 $3,270.000 $5,000.000 $10,000.000
EXCAVATION (ROADWAY)
CY 123.000 $20.000 $7.000 $50.000 $62.000 $30.000
EXCAVATION (CHANNEL)
CY 45.000 $30.000 $15.000 $55.000 $17.000 $60.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 2,041.000 $20.000 $8.000 $32.080 $31.000 $30.000
BLADING
HR 30.000 $80.000 $25.000 $100.000 $60.000 $150.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 3,313.000 $1.000 $0.500 $0.520 $0.600 $1.000
BROADCAST SEED (TEMP) (WARM)
SY 829.000 $1.000 $0.500 $1.560 $1.750 $1.000
BROADCAST SEED (TEMP) (COOL)
SY 829.000 $1.000 $0.500 $1.560 $1.750 $1.000
VEGETATIVE WATERING
MG 27.900 $60.000 $25.000 $57.200 $15.000 $85.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 539.000 $120.000 $90.000 $113.920 $95.000 $100.000
PRIME COAT (MC-30)
GAL 175.000 $20.000 $19.000 $13.150 $5.250 $8.000
AGGR(TY-PE GR-3 SAC-B)
CY 10.000 $300.000 $500.000 $575.000 $100.000 $500.000
AGGR(TY-PE GR-4 SAC-B)
CY 7.000 $300.000 $378.000 $575.000 $100.000 $500.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 648.000 $10.000 $18.000 $7.110 $4.000 $8.000
CEM STABIL BKFL
CY 96.000 $90.000 $90.000 $101.100 $55.000 $200.000
TRENCH EXCAVATION PROTECTION
LF 374.000 $15.000 $3.000 $20.800 $2.000 $3.500
PRESTR CONC PIL (18 IN SQ)
LF 1,305.000 $110.000 $109.000 $102.660 $126.000 $150.000
CL C CONC (ABUT)
CY 75.000 $850.000 $450.000 $1,036.240 $1,000.000 $1,000.000
CL C CONC (CAP)
CY 16.000 $1,000.000 $700.000 $2,989.600 $1,200.000 $1,000.000
REINF CONC SLAB (BOX BEAM)
SF 1,940.000 $16.000 $17.000 $21.690 $22.000 $28.500
REINF CONC SLAB (SLAB BEAM)
SF 4,672.000 $15.000 $17.000 $17.220 $20.000 $35.000
SHEAR KEY
CY 9.500 $500.000 $200.000 $248.800 $325.000 $1,000.000
PRESTR CONC BOX BEAM (4B20)
LF 178.500 $180.000 $208.000 $195.540 $261.000 $185.000
PRESTR CONC BOX BEAM (5B20)
LF 238.000 $160.000 $204.000 $195.540 $236.000 $185.000
PRESTR CONC SLAB BEAM (4SB12)
LF 828.000 $140.000 $148.000 $156.440 $178.000 $185.000
PRESTR CONC SLAB BEAM (5SB15)
LF 247.500 $160.000 $176.000 $156.440 $180.000 $185.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 831.000 $125.000 $123.000 $134.980 $200.000 $100.000
RAIL (TY T631)
LF 510.000 $65.000 $65.000 $112.320 $130.000 $185.000
ARMOR JOINT (SEALED)
LF 156.000 $65.000 $77.000 $78.060 $66.000 $150.000
RC PIPE (CL III)(24 IN)
LF 225.000 $65.000 $47.000 $78.170 $94.000 $105.000
RC PIPE (CL III)(36 IN)
LF 114.000 $100.000 $96.000 $126.720 $153.000 $125.000
RC PIPE (CL III)(60 IN)
LF 100.000 $225.000 $223.000 $255.850 $370.000 $650.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 3.000 $1,600.000 $2,200.000 $1,287.560 $2,500.000 $2,250.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 1.000 $2,500.000 $7,000.000 $3,798.280 $7,200.000 $3,000.000
SET (TY II) (60 IN) (RCP) (6: 1) (P)
EA 1.000 $12,000.000 $12,000.000 $13,365.680 $18,600.000 $20,000.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 3.000 $15,000.000 $20,000.000 $17,750.000 $21,000.000 $75,000.000
REMOV STR (SMALL)
EA 3.000 $500.000 $500.000 $1,000.000 $1,000.000 $5,000.000
MOBILIZATION
LS 1.000 $105,000.000 $100,000.000 $117,500.000 $150,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $3,000.000 $859.000 $984.880 $1,000.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 38.000 $50.000 $50.000 $90.480 $30.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 38.000 $10.000 $10.000 $30.470 $9.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,268.000 $3.000 $2.000 $4.370 $4.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,268.000 $1.000 $0.500 $0.780 $2.000 $2.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $2,200.000 $2,500.000 $2,652.000 $3,050.000 $2,850.000
WIRE FENCE (TY A)
LF 300.000 $25.000 $8.000 $17.680 $17.000 $5.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 18.000 $25.000 $10.000 $46.800 $35.000 $100.000
Totals: $1,179,777.000 $1,094,298.000 $1,347,770.230 $1,523,849.550 $2,000,828.500