WHARTON SH 71 (0266-05-048)

Items: 123

County: WHARTON
Length: N/A
Highway: SH 71
District: YOAKUM
Control Number: 0266-05-048
DBE Goal: N/A
Project: STP 2019(730)
Guaranty: N/A
Time: 316 WORKING DAYS
Engineer's Estimate: $10,961,080.10
Date: 05/08/2019 (7 years ago)
Contract Number: N/A
Type: ADD 2 LANES FOR 4-LANE UNDIVIDED
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$10,961,080.10
$9,682,167.49
Over/Under Est: -11.67% -$1,278,912.61
Over/Under Est: -9.83% -$1,077,199.83
Amt Left: 2.08% $201,712.78
Over/Under Est: -7.55% -$827,484.53
Amt Left: 4.66% $451,428.08
Delta: -2.53% -$249,715.30
Over/Under Est: -0.82% -$89,765.70
Amt Left: 12.28% $1,189,146.91
Delta: -7.28% -$737,718.83
Subcontractor Percentage Amount
SER CONSTRUCTION PARTNERS, LLC 38.54% $3,735,731.30
LONE STAR EROSION CONTROL 1.80% $174,476.29
CURB PLANET INC. 0.70% $67,851.89
A K FUQUAY CONSTRUCTION 0.69% $66,882.58
HIGHWAY BARRICADES AND SERVICES, LLC 0.63% $61,066.70
LONESTAR TRAFFIC SAFETY, LLC 0.23% $22,294.19
MURRAY CONSTRUCTION 0.16% $15,509.00
BEAVER BOYS SERVICES 0.04% $3,877.25
Total: 42.79% $4,147,689.20

Bid Items & Bid Tabulations

123 Total 0 of 123
WHARTON  |  SH 71  |  YOAKUM  |  0266-05-048  |  05/08/2019  |  $10,961,080.10  |  STP 2019(730)  |  ADD 2 LANES FOR 4-LANE UNDIVIDED  |  316 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
SER CONSTRUCTION PARTNERS, LLC
JAMES CONSTRUCTION GROUP, L.L.C.
ANGEL BROTHERS HOLDINGS CORP.
PREPARING ROW
STA 10.000 $3,500.000 $7,275.000 $16,000.000 $3,500.000 $2,500.000
REMOVING CONC (PAV)
SY 14,094.000 $12.000 $7.800 $7.800 $15.000 $7.000
REMOVING CONC (SIDEWALKS)
SY 20.000 $20.000 $73.260 $7.800 $20.000 $11.000
REMOVING CONC (DRIVEWAYS)
SY 728.000 $20.000 $25.770 $7.800 $13.500 $12.900
REMOVING CONC (CURB AND GUTTER)
LF 707.000 $6.000 $7.800 $1.100 $10.000 $6.500
EXCAVATION (ROADWAY)
CY 38,459.000 $15.000 $7.280 $9.900 $9.000 $12.000
EXCAVATION (CHANNEL)
CY 134.000 $25.000 $39.450 $11.700 $20.000 $34.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 12,708.000 $17.000 $9.120 $4.600 $11.000 $7.000
FURNISHING AND PLACING TOPSOIL (4")
SY 26,722.000 $1.200 $1.870 $2.700 $1.860 $2.800
BLOCK SODDING
SY 7,074.000 $3.000 $5.100 $4.300 $3.250 $4.050
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
SY 19,648.000 $0.500 $0.540 $0.400 $0.360 $0.450
CELL FBR MLCH SEED(TEMP)(WARM)
SY 4,914.000 $0.250 $0.490 $0.400 $0.360 $0.450
CELL FBR MLCH SEED(TEMP)(COOL)
SY 4,914.000 $0.250 $0.490 $0.400 $0.360 $0.450
VEGETATIVE WATERING
MG 225.300 $20.000 $26.630 $23.900 $50.000 $43.000
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 12,512.000 $75.000 $80.700 $73.800 $88.000 $88.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 670.000 $175.000 $162.750 $201.700 $149.000 $232.000
LIME TRT (SUBGRADE)(6")
SY 56,370.000 $3.300 $2.280 $2.700 $3.000 $3.750
PRIME COAT (MC-30)
GAL 11,256.000 $4.000 $4.880 $5.700 $4.060 $4.600
AGGR(TY-PE GR-3 SAC-B)
CY 500.000 $100.000 $102.340 $133.200 $160.000 $142.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 22,004.000 $3.250 $3.420 $4.000 $3.400 $3.900
D-GR HMA TY-B PG64-22
TON 12,003.000 $80.000 $87.630 $99.900 $86.000 $101.000
D-GR HMA TY-D PG64-22
TON 6,151.000 $85.000 $87.630 $99.900 $89.000 $99.000
D-GR HMA TY-D SAC-B PG70-22
TON 6,430.000 $85.000 $94.020 $107.200 $89.000 $108.500
PLANE ASPH CONC PAV (2")
SY 7,636.000 $2.000 $2.100 $3.300 $1.770 $2.000
CEM STABIL BKFL
CY 6,550.000 $100.000 $90.000 $62.400 $55.000 $68.000
CUT & RESTORING PAV
SY 100.000 $150.000 $150.000 $143.400 $190.690 $104.000
TRENCH EXCAVATION PROTECTION
LF 5,176.000 $5.000 $8.000 $0.200 $1.090 $2.500
RIPRAP (CONC)(4 IN)
CY 12.000 $500.000 $400.000 $534.300 $764.800 $830.000
RIPRAP (CONC)(5 IN)
CY 5.000 $500.000 $390.000 $524.600 $874.060 $930.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 137.000 $200.000 $152.110 $196.300 $207.590 $180.000
CONC BOX CULV (3 FT X 2 FT)
LF 494.000 $250.000 $150.000 $171.600 $218.510 $235.500
CONC BOX CULV (3 FT X 3 FT)
LF 556.000 $300.000 $195.000 $194.700 $218.510 $254.000
CONC BOX CULV (4 FT X 2 FT)
LF 205.000 $325.000 $160.000 $185.200 $218.510 $250.000
CONC BOX CULV (4 FT X 3 FT)
LF 1,191.000 $360.000 $205.000 $207.900 $240.370 $275.000
CONC BOX CULV (5 FT X 2 FT)
LF 444.000 $375.000 $220.000 $252.500 $273.140 $330.000
CONC BOX CULV (5 FT X 3 FT)
LF 1,508.000 $400.000 $255.000 $260.900 $294.990 $340.000
CONC BOX CULV (6 FT X 3 FT)
LF 1,446.000 $450.000 $310.000 $316.700 $382.400 $410.000
CONC BOX CULV (6 FT X 4 FT)
LF 21.000 $550.000 $595.000 $360.600 $464.340 $495.000
CONC BOX CULV (7 FT X 3 FT)
LF 351.000 $600.000 $380.000 $375.800 $458.880 $502.000
CONC BOX CULV (7 FT X 4 FT)
LF 90.000 $650.000 $495.000 $451.000 $546.280 $655.000
CONC BOX CULV (8 FT X 4 FT)
LF 20.000 $850.000 $595.000 $484.400 $589.990 $420.000
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 38.000 $700.000 $460.000 $354.400 $437.030 $280.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 10.000 $725.000 $520.000 $418.600 $437.030 $290.000
CONC BOX CULV (8 FT X 3 FT)(EXTEND)
LF 29.000 $800.000 $700.000 $545.400 $628.230 $795.000
RC PIPE (CL III)(18 IN)
LF 820.000 $55.000 $120.000 $60.000 $136.570 $82.000
RC PIPE (CL III)(24 IN)
LF 3,593.000 $75.000 $46.000 $69.600 $76.480 $79.000
RC PIPE (CL III)(30 IN)
LF 1,559.000 $85.000 $70.000 $80.800 $109.260 $92.000
RC PIPE (CL III)(36 IN)
LF 200.000 $115.000 $136.000 $100.500 $147.500 $155.000
INLET (COMPL)(TY H)
EA 18.000 $4,000.000 $6,400.000 $2,862.200 $2,731.420 $2,600.000
INLET (COMPL)(TY H)(MOD)
EA 61.000 $4,500.000 $6,300.000 $2,912.500 $3,823.990 $3,100.000
INLET (COMPL)(CURB)(TY C)
EA 15.000 $5,000.000 $7,900.000 $4,332.700 $4,370.280 $4,300.000
INLET (COMPL)(EXT TY C)
EA 2.000 $2,500.000 $2,600.000 $1,516.400 $874.060 $1,350.000
MANH (COMPL)(TY M)
EA 4.000 $5,000.000 $6,900.000 $4,270.100 $3,823.990 $3,750.000
MANH (COMPL)(RISER ONLY)
EA 9.000 $2,000.000 $2,800.000 $2,443.500 $1,966.630 $2,550.000
INLET(COMPL)(CURB)(TY C)(MOD)
EA 9.000 $5,200.000 $3,300.000 $2,777.600 $3,277.710 $3,200.000
WINGWALL (FW - 0) (HW=4 FT)
EA 1.000 $7,000.000 $2,900.000 $7,447.300 $10,925.690 $11,000.000
WINGWALL (FW - 0) (HW=5 FT)
EA 1.000 $8,000.000 $4,200.000 $8,979.900 $10,925.690 $11,000.000
WINGWALL (PW - 2) (HW=5 FT)
EA 1.000 $10,000.000 $7,100.000 $9,776.000 $8,194.270 $16,400.000
WINGWALL (SW - 0) (HW=4 FT)
EA 1.000 $10,000.000 $2,700.000 $7,752.500 $9,833.130 $10,500.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
EA 2.000 $4,500.000 $2,700.000 $6,738.300 $8,740.560 $7,000.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (P)
EA 3.000 $6,000.000 $4,800.000 $10,334.300 $8,740.560 $8,550.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(6:1) (P)
EA 1.000 $11,000.000 $12,000.000 $18,906.700 $9,833.130 $17,000.000
SET (TY I)(S= 7 FT)(HW= 5 FT)(6:1) (P)
EA 1.000 $12,000.000 $13,000.000 $21,207.700 $13,110.830 $18,000.000
SET (TY II) (18 IN) (RCP) (2: 1) (C)
EA 1.000 $1,500.000 $1,000.000 $1,517.900 $1,311.080 $1,800.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 8.000 $1,500.000 $1,000.000 $1,673.300 $1,311.080 $1,200.000
REMOV STR (INLET)
EA 4.000 $750.000 $400.000 $471.800 $917.760 $750.000
REMOV STR (SMALL)
EA 104.000 $1,200.000 $200.000 $603.600 $431.560 $750.000
MOBILIZATION
LS 1.000 $850,000.000 $914,315.930 $950,000.000 $950,000.000 $1,006,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 20.000 $4,500.000 $2,112.430 $4,856.300 $3,200.000 $2,900.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 685.000 $3.000 $7.000 $3.900 $4.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 685.000 $1.000 $1.000 $1.100 $1.000 $1.500
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,520.000 $4.000 $5.250 $13.300 $4.000 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,520.000 $1.000 $1.250 $4.400 $1.000 $1.500
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 340.000 $40.000 $20.000 $85.100 $137.000 $74.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 160.000 $50.000 $22.000 $79.500 $137.000 $74.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 1,400.000 $6.000 $18.000 $5.800 $9.170 $10.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 1,120.000 $7.000 $20.000 $5.800 $9.170 $10.150
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 340.000 $15.000 $18.000 $14.700 $76.000 $11.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 160.000 $15.000 $18.000 $14.700 $108.000 $14.000
CONC CURB (MONO) (TY II)
LF 210.000 $15.000 $20.000 $7.700 $7.800 $16.000
CONC CURB & GUTTER (TY II)
LF 15,228.000 $22.000 $18.000 $13.500 $16.000 $21.000
DRIVEWAYS (CONC)
SY 754.000 $70.000 $78.000 $72.900 $64.130 $92.000
DRIVEWAYS (ACP)
SY 3,714.000 $35.000 $39.420 $49.000 $74.120 $34.000
CONC SIDEWALKS (6")
SY 2,492.000 $60.000 $60.000 $65.500 $58.080 $65.000
CURB RAMPS (TY 1)
EA 2.000 $1,650.000 $2,000.000 $1,132.500 $1,294.370 $1,400.000
CURB RAMPS (TY 10)
EA 8.000 $1,900.000 $2,200.000 $1,408.400 $1,616.800 $1,400.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 2.000 $450.000 $320.000 $388.500 $320.000 $403.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 23.000 $260.000 $115.000 $388.500 $115.000 $145.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 3.000 $270.000 $150.000 $388.500 $150.000 $189.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 23.000 $450.000 $415.000 $832.500 $415.000 $525.000
REMOVE SM RD SN SUP&AM
EA 25.000 $85.000 $75.000 $77.700 $75.000 $95.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 28,700.000 $0.200 $0.220 $0.200 $0.220 $0.340
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 28,880.000 $0.200 $0.220 $0.200 $0.220 $0.340
WK ZN PAV MRK REMOV (REFL) TY I-C
LF 826.000 $3.000 $0.500 $0.600 $0.500 $1.400
WK ZN PAV MRK REMOV (REFL) TY II-A-A
LF 34,012.000 $3.500 $0.400 $0.400 $0.400 $1.250
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 130.000 $0.750 $0.650 $0.700 $0.650 $1.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 6,088.000 $0.600 $0.550 $0.600 $0.550 $1.000
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 637.000 $1.100 $1.500 $1.700 $1.500 $2.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 65.000 $8.000 $4.000 $4.400 $4.000 $12.700
WK ZN PAV MRK REMOV (W)(ARROW)
EA 5.000 $160.000 $185.000 $205.400 $185.000 $315.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 5.000 $204.000 $275.000 $305.300 $275.000 $380.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 5,432.000 $0.600 $0.550 $0.600 $0.550 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,172.000 $1.000 $1.500 $5.600 $0.500 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 1,792.000 $1.500 $1.500 $5.600 $0.500 $1.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 550.000 $0.700 $1.500 $1.700 $1.500 $2.500
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 145.000 $2.500 $4.500 $5.000 $4.500 $3.800
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 3,758.000 $0.300 $0.450 $0.500 $0.450 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 1,550.000 $0.300 $0.450 $0.500 $0.450 $1.000
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 3,382.000 $0.300 $0.450 $0.500 $0.450 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 16,910.000 $0.300 $0.420 $0.500 $0.420 $1.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 85.000 $12.500 $14.000 $15.500 $14.000 $15.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 8.000 $225.000 $185.000 $205.400 $185.000 $441.000
PREFAB PAV MRK TY C (W) (WORD)
EA 4.000 $275.000 $275.000 $305.300 $275.000 $565.000
REFL PAV MRKR TY I-C
EA 208.000 $3.500 $4.000 $4.400 $4.000 $5.000
REFL PAV MRKR TY II-A-A
EA 864.000 $3.500 $4.000 $4.400 $4.000 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 5,805.000 $0.500 $0.600 $0.700 $0.600 $0.500
ELIM EXT PAV MRK & MRKS (8")
LF 144.000 $0.750 $1.200 $1.300 $1.200 $1.500
ELIM EXT PAV MRK & MRKS (24")
LF 14.000 $3.000 $3.000 $3.300 $3.000 $3.750
ELIM EXT PAV MRK & MRKS (ARROW)
EA 1.000 $47.000 $30.000 $33.300 $30.000 $65.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 1.000 $55.000 $30.000 $33.300 $30.000 $65.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,000.000 $8,693.920 $19,980.000 $5,000.000 $6,500.000
TMA (STATIONARY)
EA 2.000 $8,000.000 $8,693.920 $5,550.000 $5,000.000 $15,000.000
TMA (MOBILE OPERATION)
DAY 30.000 $500.000 $289.800 $1,110.000 $700.000 $425.000
Totals: $10,961,080.100 $9,682,167.499 $9,883,880.270 $10,133,595.570 $10,871,314.400