Show Job Controls
Bid Cobra

WEBB FM 3338 (3532-02-011)

Items: 178

County: WEBB
Length: N/A
Highway: FM 3338
District: LAREDO
Control Number: 3532-02-011
DBE Goal: N/A
Project: C 3532-2-11
Guaranty: N/A
Time: 651 WORKING DAYS
Engineer's Estimate: $22,551,599.18
Date: 04/03/2019 (7 years ago)
Contract Number: N/A
Type: BASE,ACP,GRAD,STR,PAV MRK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$22,551,599.18
$23,429,428.64
Over/Under Est: 3.89% $877,829.46
Over/Under Est: 13.53% $3,051,786.57
Amt Left: 9.28% $2,173,957.11

Bid Items & Bid Tabulations

178 Total 0 of 178
WEBB  |  FM 3338  |  LAREDO  |  3532-02-011  |  04/03/2019  |  $22,551,599.18  |  C 3532-2-11  |  BASE,ACP,GRAD,STR,PAV MRK  |  651 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANDERSON COLUMBIA CO., INC.
ANGEL BROTHERS HOLDINGS CORP.
PREPARING ROW
STA 450.000 $1,000.000 $725.000 $2,200.000
REMOVING CONC (RIPRAP)
SY 1,980.000 $12.000 $10.000 $16.000
EXCAVATION (ROADWAY)
CY 163,206.000 $10.000 $7.000 $13.250
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 37,788.000 $12.500 $14.000 $5.000
CELL FBR MLCH SEED(TEMP)(WARM)
SY 151,019.000 $0.300 $0.170 $0.170
CELL FBR MLCH SEED(TEMP)(COOL)
SY 151,019.000 $0.300 $0.170 $0.170
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 301,972.000 $0.250 $0.120 $0.120
DRILL SEEDING (TEMP) (WARM)
SY 301,972.000 $0.150 $0.070 $0.070
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 78,307.000 $44.000 $60.000 $60.000
LIME (HYD, COM, OR QK(SLURRY))
TON 4,545.000 $150.000 $160.000 $145.000
LIME TRT (SUBGRADE)(6")
SY 244,260.000 $3.250 $2.700 $1.250
PRIME COAT (MC-30)
GAL 46,045.000 $4.250 $3.400 $3.750
SUPERPAVE MIXTURES SP- B SAC-B PG70-22
TON 55,764.000 $72.000 $84.000 $89.000
CONC PVMT (CONT REINF - CRCP) (12")
SY 6,320.000 $60.000 $100.000 $116.000
TEMPORARY SPL SHORING
SF 9,665.000 $40.000 $15.000 $15.000
DRILL SHAFT (42 IN)
LF 48.000 $240.000 $420.000 $420.000
DRILL SHAFT (48 IN)
LF 18.000 $350.000 $430.000 $430.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 106.400 $350.000 $175.000 $175.000
CONC STR REPAIR (STANDARD)
SF 7.000 $175.000 $150.000 $1,250.000
RIPRAP (CONC)(5 IN)
CY 27.000 $400.000 $415.000 $450.000
RIPRAP (MOW STRIP)(4 IN)
CY 153.000 $550.000 $411.000 $450.000
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 42.000 $750.000 $724.000 $740.000
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 164.000 $510.000 $620.000 $635.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 58.000 $575.000 $922.000 $940.000
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 56.000 $575.000 $880.000 $900.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 98.000 $620.000 $665.000 $675.000
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 116.000 $550.000 $734.000 $750.000
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
LF 86.000 $600.000 $870.000 $885.000
CONC BOX CULV (7 FT X 5 FT)(EXTEND)
LF 44.000 $765.000 $985.000 $1,000.000
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
LF 30.000 $950.000 $988.000 $1,000.000
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
LF 66.000 $965.000 $1,100.000 $1,050.000
CONC BOX CULV (9 FT X 9 FT)(EXTEND)
LF 28.000 $1,000.000 $1,400.000 $1,400.000
CONC BOX CULV (10 FT X 5 FT)(EXTEND)
LF 8.000 $650.000 $2,050.000 $2,050.000
RC PIPE (CL III)(18 IN)
LF 28.000 $50.000 $44.000 $45.000
RC PIPE (CL III)(24 IN)
LF 1,322.000 $67.500 $52.000 $53.000
RC PIPE (CL III)(30 IN)
LF 228.000 $82.500 $64.000 $65.000
WINGWALL (FW - S) (HW=5 FT)
EA 2.000 $10,750.000 $15,200.000 $15,000.000
WINGWALL (PW - 1) (HW=15 FT)
EA 2.000 $19,500.000 $52,800.000 $53,000.000
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $22,000.000 $17,500.000 $17,500.000
WINGWALL (PW - 1) (HW=8 FT)
EA 1.000 $21,100.000 $22,600.000 $23,000.000
WINGWALL (PW - 2) (HW=11 FT)
EA 2.000 $27,750.000 $42,570.000 $42,500.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
EA 8.000 $8,750.000 $7,400.000 $7,500.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (C)
EA 4.000 $9,000.000 $11,300.000 $11,500.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
EA 2.000 $5,750.000 $12,000.000 $12,000.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $5,000.000 $10,800.000 $11,000.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (C)
EA 6.000 $8,250.000 $12,320.000 $12,000.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
EA 8.000 $7,900.000 $11,860.000 $11,500.000
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $5,750.000 $12,470.000 $12,000.000
SET (TY I)(S= 7 FT)(HW= 4 FT)(6:1) (C)
EA 4.000 $9,000.000 $12,350.000 $12,000.000
SET (TY I)(S= 7 FT)(HW= 6 FT)(4:1) (C)
EA 4.000 $7,000.000 $13,670.000 $13,250.000
SET (TY I)(S= 8 FT)(HW= 5 FT)(4:1) (C)
EA 2.000 $7,500.000 $18,000.000 $18,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $725.000 $1,100.000 $1,050.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 2.000 $1,400.000 $1,580.000 $1,575.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 79.000 $1,300.000 $1,580.000 $1,575.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 10.000 $1,550.000 $1,820.000 $1,825.000
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 2.000 $1,800.000 $1,845.000 $1,825.000
REMOV STR (SET)
EA 39.000 $375.000 $875.000 $875.000
REMOV STR (PIPE)
EA 19.000 $350.000 $12.000 $800.000
REMOVE STR (RAIL)
LF 250.000 $40.000 $42.000 $80.000
MOBILIZATION
LS 1.000 $2,017,107.000 $2,000,000.000 $2,500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 35.000 $7,500.000 $1,000.000 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 735.000 $45.000 $40.000 $45.000
ROCK FILTER DAMS (REMOVE)
LF 735.000 $12.000 $16.000 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 3,432.000 $20.000 $25.000 $20.000
CONSTRUCTION EXITS (REMOVE)
SY 3,432.000 $8.000 $13.500 $5.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 100.000 $70.000 $95.000 $85.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,790.000 $2.500 $2.200 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,790.000 $1.000 $1.000 $0.250
CONSTRUCTING DETOURS
SY 18,372.000 $55.000 $28.000 $30.000
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 504.000 $65.000 $150.000 $93.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 6.000 $6,000.000 $5,000.000 $2,200.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 2,580.000 $26.000 $25.000 $25.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 7,290.000 $8.500 $10.000 $25.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 64,440.000 $8.500 $4.000 $4.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 7,290.000 $7.500 $10.000 $9.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 2,580.000 $11.000 $10.000 $9.000
DRIVEWAYS (ACP)
SY 5,165.000 $32.000 $42.000 $24.250
RUMBLE STRIPS (SHOULDER)
LF 80,919.000 $0.160 $0.200 $0.270
RUMBLE STRIPS (CENTERLINE)
LF 35,405.000 $0.180 $0.300 $0.380
MTL W-BEAM GD FEN (TIM POST)
LF 1,628.000 $21.000 $19.000 $25.570
MTL W-BEAM GD FEN (STEEL POST)
LF 100.000 $23.000 $62.000 $90.950
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 3.000 $1,100.000 $1,000.000 $1,146.000
REMOVE METAL BEAM GUARD FENCE
LF 3,100.000 $2.500 $1.500 $1.500
GUARDRAIL END TREATMENT (INSTALL)
EA 18.000 $2,400.000 $2,450.000 $2,941.000
GUARDRAIL END TREATMENT (REMOVE)
EA 16.000 $260.000 $153.000 $135.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 96.000 $1,600.000 $460.000 $895.000
CRASH CUSH ATTEN (REMOVE)
EA 18.000 $800.000 $155.000 $250.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 18.000 $15,000.000 $9,180.000 $7,500.000
REMOVE RD IL ASM (TRANS-BASE)
EA 2.000 $775.000 $395.000 $385.000
CONDT (PVC) (SCH 40) (2")
LF 2,388.000 $9.000 $14.000 $13.700
CONDT (PVC) (SCH 40) (2") (BORE)
LF 620.000 $22.000 $15.000 $15.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 72.000 $22.000 $16.000 $16.000
ELEC CONDR (NO.8) INSULATED
LF 869.000 $1.500 $1.300 $1.300
ELEC CONDR (NO.6) BARE
LF 1,023.000 $1.500 $1.400 $1.400
ELEC CONDR (NO.6) INSULATED
LF 2,046.000 $2.000 $1.600 $1.550
TRAY CABLE (3 CONDR) (12 AWG)
LF 3,880.000 $2.000 $2.000 $2.050
GROUND BOX TY A (122311)W/APRON
EA 9.000 $1,000.000 $740.000 $722.000
GROUND BOX TY C (162911)W/APRON
EA 4.000 $1,100.000 $1,090.000 $1,067.000
REMOVE GROUND BOX
EA 4.000 $325.000 $330.000 $325.000
ZINC-COAT STL WIRE STRAND (3/8")
LF 655.000 $5.000 $2.000 $1.900
REMOVE ELECTRICAL SERVICES
EA 2.000 $2,500.000 $1,340.000 $1,312.000
ELC SRV TY D 120/240 060(NS)GS(N)SP(O)
EA 4.000 $5,800.000 $2,920.000 $2,865.000
ELC SRV TY T 120/240 000(NS)GS(L)SP(O)
EA 3.000 $4,000.000 $2,920.000 $2,865.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $600.000 $485.000 $485.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $600.000 $595.000 $595.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 52.000 $350.000 $350.000 $350.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 2.000 $425.000 $415.000 $415.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $300.000 $375.000 $375.000
REMOVE SM RD SN SUP&AM
EA 48.000 $75.000 $92.000 $92.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 4.000 $100.000 $60.000 $60.000
RELOCATE LRSA
EA 1.000 $2,000.000 $7,450.000 $7,305.000
INS OH SN SUP(30 FT BAL TEE)
EA 1.000 $30,500.000 $31,000.000 $28,025.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 31.000 $25.000 $24.000 $24.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 172.000 $75.000 $72.000 $72.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 172.000 $8.000 $20.000 $10.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 164,138.000 $0.300 $0.260 $0.260
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 232.000 $6.000 $6.000 $6.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 21,345.000 $0.300 $0.300 $0.300
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 52,780.000 $0.350 $0.300 $0.300
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 91,790.000 $0.550 $0.470 $0.500
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 17,889.000 $0.550 $0.470 $0.500
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 232.000 $6.250 $6.000 $6.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 2,780.000 $0.750 $0.720 $0.720
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 155.000 $5.000 $6.330 $6.330
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 7.000 $30.000 $47.000 $47.000
REFL PAV MRK TY I (Y)24"(SLD)(090MIL)
LF 46.000 $5.000 $8.000 $8.000
PAVEMENT SEALER 4"
LF 147,523.000 $0.200 $0.150 $0.150
PAVEMENT SEALER 8"
LF 2,780.000 $0.350 $0.440 $0.440
PAVEMENT SEALER 24"
LF 201.000 $2.250 $3.330 $3.330
PAVEMENT SEALER (ARROW)
EA 22.000 $45.000 $63.000 $63.000
PAVEMENT SEALER (WORD)
EA 10.000 $55.000 $67.000 $67.000
PAVEMENT SEALER (YLD TRI)
EA 7.000 $22.500 $22.000 $22.000
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 87,091.000 $0.200 $0.400 $0.400
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 20,596.000 $0.270 $0.440 $0.440
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 39,836.000 $0.220 $0.420 $0.420
PREFAB PAV MRK TY C (W) (ARROW)
EA 22.000 $255.000 $211.000 $211.000
PREFAB PAV MRK TY C (W) (WORD)
EA 10.000 $260.000 $222.000 $222.000
REFL PAV MRKR TY I-C
EA 40.000 $4.000 $8.000 $8.000
REFL PAV MRKR TY II-A-A
EA 1,682.000 $4.000 $4.000 $4.000
REFL PAV MRKR TY II-C-R
EA 113.000 $2.750 $6.000 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 39,860.000 $0.500 $0.470 $0.470
ELIM EXT PAV MRK & MRKS (24")
LF 110.000 $3.000 $4.000 $4.000
INSTALL HWY TRF SIG (FLASH BEACON)
EA 4.000 $3,000.000 $12,550.000 $12,300.000
VEH SIG SEC (12")LED(YEL)
EA 10.000 $250.000 $210.000 $207.000
VEH SIG SEC (12")LED(RED)
EA 14.000 $250.000 $210.000 $207.000
TRF SIG CBL (TY A)(12 AWG)(3 CONDR)
LF 1,490.000 $3.000 $1.500 $1.500
REMOVE RDSD FLASH BEACON ASSEMBLY
EA 4.000 $2,200.000 $650.000 $636.000
INS TRF SIG PL AM (S)STR(TY D)LUM
EA 7.000 $3,600.000 $7,330.000 $7,190.000
REMOVAL OF SPAN CABLE ASSM
LF 175.000 $0.420 $2.000 $1.700
REMOVAL OF SIGNAL HEAD ASSM
EA 6.000 $90.000 $160.000 $155.000
REMOVAL OF TRAFFIC SIGNAL POLE FND
LF 15.200 $250.000 $130.000 $125.000
REMOVAL OF FLASHER CABINET
EA 1.000 $500.000 $760.000 $745.000
REMOVAL OF SIGNAL POLE ASSM
EA 1.000 $1,000.000 $795.000 $780.000
REPLACE OF LUMINAIRE HEAD
EA 3.000 $400.000 $790.000 $775.000
REMOVAL OF LUMINAIRE MAST ARMS
EA 1.000 $150.000 $320.000 $315.000
REPLACE OF LUMINAIRE MAST ARMS
EA 3.000 $750.000 $1,360.000 $1,330.000
BONDING COURSE
GAL 22,554.000 $3.250 $4.000 $3.500
SUPERPAVE MIX BMD SP-C SAC-A PG76-22
TON 27,065.000 $90.000 $105.000 $110.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 84.000 $75.000 $52.000 $175.000
ITS COM CBL (ETHERNET)
LF 43.000 $3.800 $4.500 $4.350
FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)
LF 869.000 $3.100 $8.000 $7.800
FIBER OPTIC PATCH PANEL (6 POSITION)
EA 2.000 $2,300.000 $850.000 $835.000
ITS GRND MNT CAB (TY 4) (CONF 1)
EA 1.000 $13,200.000 $13,570.000 $13,310.000
CCTV FIELD EQUIPMENT (ANALOG)
EA 3.000 $9,300.000 $4,850.000 $4,760.000
REMOVE CCTV FIELD EQUIPMENT
EA 1.000 $1,500.000 $1,830.000 $1,790.000
CONDUIT (PREPARE)
LF 40.000 $2.750 $4.000 $3.900
INSTALL DMS (FOUNDATION MTD CABINET)
EA 1.000 $15,100.000 $12,330.000 $12,085.000
ITS RADIO (INSTALL ONLY)
EA 6.000 $2,300.000 $1,400.000 $1,370.000
ITS POLE (50 FT)(90 MPH)
EA 3.000 $9,500.000 $9,400.000 $9,195.000
ITS POLE MNT CAB (TY 1)(CONF 2)
EA 3.000 $6,500.000 $8,450.000 $8,285.000
TMA (STATIONARY)
DAY 1,063.000 $175.000 $114.000 $175.000
TMA (MOBILE OPERATION)
HR 448.000 $40.000 $23.000 $25.000
ITS GND BOX(PCAST) TY 1 (243648)W/APRN
EA 4.000 $5,500.000 $3,440.000 $3,375.000
INSTALATION OF ETHERNET SURGE PROTECTOR
EA 5.000 $250.000 $850.000 $835.000
INSTALLATION OF DIGITAL VIDEO ENCODER
EA 3.000 $650.000 $430.000 $425.000
INSTALLATION OF TRANSCEIVER
EA 2.000 $650.000 $660.000 $650.000
INSTALATION OF HARDENED ETHERNET SWITCH
EA 4.000 $500.000 $400.000 $390.000
DRIVEWAY ASSISTANCE DEVICE SYSTEM
MO 44.000 $1,000.000 $2,800.000 $2,350.000
Totals: $22,551,599.180 $23,429,428.640 $25,603,385.750