Show Job Controls
Bid Cobra

WEBB FM 1472 (2150-04-099)

Items: 83

County: WEBB
Length: 3.9140 MILES
Highway: FM 1472
District: LAREDO
Control Number: 2150-04-099
DBE Goal: 0.0%
Project: STP 2026(175)HRR
Guaranty: $172,000.00
Time: 175 WORKING DAYS
Engineer's Estimate: $4,320,911.92
Date: 12/02/2025 (6 months ago)
Contract Number: 12253022
Type: INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT T
Project ID: A00213393
Contract Type: Federal
Project Description: CONSTRUCTION OF NEW RIGHT TURN LANES AT PINTO VALLE, AND LEFT TURN LANES AT EXISTING CROSSOVER
Mail/Deliver Bids To: N/A
JOSE VARGAS
RAFAEL GUZMAN
ANGEL MARTINEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$4,320,911.92
$3,866,337.78
Over/Under Est: -10.52% -$454,574.14
Over/Under Est: -0.64% -$27,761.71
Amt Left: 11.04% $426,812.43
Over/Under Est: 7.35% $317,667.98
Amt Left: 19.97% $772,242.12
Delta: -8.05% -$345,429.69

Bid Items & Bid Tabulations

83 Total 0 of 83
WEBB  |  FM 1472  |  LAREDO  |  2150-04-099  |  12/02/2025  |  $4,320,911.92  |  STP 2026(175)HRR  |  INTERS IMPRVS WITH RIGHT AND/OR LEFT...  |  175 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANDERSON COLUMBIA CO., INC.
TEXAS MATERIALS GROUP, INC.
REIM CONSTRUCTION, INC.
PREPARING ROW
STA 110.000 $400.000 $700.000 $1,465.000 $1,450.000
REMOV CONC (MOWSTRIP)
SY 162.000 $30.000 $22.000 $25.000 $35.000
REMOV CONC (RIPRAP)
SY 220.000 $28.000 $22.000 $27.000 $23.750
RMV (6") TRT/UNTRT BASE & ASPH PAV
CY 4,930.000 $22.000 $20.000 $38.750 $13.250
REMOVE STAB BASE AND ASPH PAV (6"-20")
SY 161.000 $12.000 $55.000 $32.000 $29.500
EXCAV (ROADWAY)
CY 4,598.000 $9.500 $23.000 $18.650 $10.250
EMBANK (FNL)(OC)(TY A)
CY 4,152.000 $23.000 $21.000 $19.250 $16.250
FURN & PLACE TOPSOIL (6")
SY 35,644.000 $10.000 $0.800 $1.850 $12.750
BROADCAST SEED (PERM_RURAL_SAND)
SY 35,644.000 $0.750 $0.300 $0.360 $0.450
BROADCAST SEED (TEMP_WARM)
SY 35,644.000 $0.750 $0.200 $0.300 $0.400
VEGETATIVE WATERING
TGL 555.000 $30.000 $40.000 $35.000 $34.500
PROOF ROLLING
HR 7.000 $250.000 $124.000 $143.000 $66.000
FL BS (CMP IN PLC)(TY A GR 1-2) (12")
SY 14,806.000 $85.000 $44.000 $52.200 $41.750
D-GR HMA TY-B SAC-B PG70-22
TON 3,107.000 $102.000 $120.000 $113.500 $140.000
D-GR HMA TY-C SAC-A PG76-22
TON 1,384.000 $125.000 $160.000 $166.000 $176.000
DRILL SHAFT (18 IN)
LF 298.000 $150.000 $300.000 $240.000 $232.000
RIPRAP (CONC)(CL A)
CY 379.000 $690.000 $628.000 $735.000 $717.000
REMOV STR (SET)
EA 4.000 $2,185.000 $700.000 $480.000 $500.000
REMOV STR (PIPE)
LF 142.000 $30.000 $36.000 $20.000 $20.000
MOBILIZATION
LS 1.000 $296,233.000 $330,000.000 $429,000.000 $495,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $12,500.000 $7,000.000 $11,700.000 $1,840.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $12,000.000 $1,600.000 $9,030.000
TMA (STATIONARY)
DAY 243.000 $300.000 $300.000 $10.000 $181.000
TMA (MOBILE OPERATION)
DAY 15.000 $200.000 $680.000 $20.000 $422.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 1,255.000 $44.000 $39.000 $47.000 $38.750
ROCK FILTER DAMS (REMOVE)
LF 1,255.000 $15.000 $22.000 $14.000 $13.750
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,456.000 $5.000 $3.800 $6.000 $4.900
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,456.000 $2.000 $1.600 $2.000 $2.350
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 761.000 $7.000 $6.200 $8.000 $5.250
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 200.000 $9.000 $6.200 $8.000 $5.650
BIODEG EROSN CONT LOGS (REMOVE)
LF 961.000 $3.000 $1.800 $3.000 $1.250
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 7,295.000 $48.000 $90.000 $92.300 $111.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 3,000.000 $15.000 $26.000 $17.000 $8.650
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 20,810.000 $8.000 $10.000 $13.700 $9.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 3,000.000 $14.000 $16.000 $15.850 $5.200
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 120.000 $14.000 $17.000 $27.000 $5.200
PORT CTB (PINNING)
EA 969.000 $45.000 $50.000 $36.000 $112.000
PERM CTB (TRAN SSCB TO SSTR) (MOD)
LF 90.000 $325.000 $340.000 $550.000 $1,220.000
REMOVE METAL BEAM GUARD FENCE
LF 101.000 $4.000 $5.000 $8.000 $4.200
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $260.000 $300.000 $365.000 $852.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 3.000 $300.000 $300.000 $365.000 $439.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $350.000 $300.000 $550.000 $381.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 14.000 $2,500.000 $1,000.000 $1,125.000 $1,830.000
CRASH CUSH ATTEN (REMOVE)
EA 5.000 $1,050.000 $970.000 $790.000 $1,260.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $10,000.000 $9,200.000 $8,500.000 $12,100.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 1.000 $4,500.000 $3,000.000 $0.010 $7,830.000
ALUMINUM SIGNS (TY A)
SF 6.250 $35.000 $44.000 $40.000 $102.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 15.000 $800.000 $840.000 $775.000 $958.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $930.000 $1,000.000 $950.000 $1,140.000
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 5.000 $1,610.000 $2,100.000 $1,950.000 $2,350.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 16.000 $1,000.000 $725.000 $675.000 $814.000
REMOVE SM RD SN SUP&AM
EA 30.000 $106.000 $70.000 $65.000 $78.500
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 72.000 $45.000 $70.000 $65.000 $78.500
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 16,200.000 $1.020 $0.460 $0.420 $0.500
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 8,100.000 $1.020 $0.460 $0.420 $0.500
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 1,490.000 $1.200 $1.200 $1.100 $1.300
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,747.000 $1.030 $0.900 $0.880 $1.050
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 201.000 $3.000 $2.700 $2.500 $3.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 12.000 $7.000 $26.000 $24.000 $29.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 3.000 $146.000 $210.000 $200.000 $241.000
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 6.000 $340.000 $425.000 $400.000 $482.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 9.000 $180.000 $325.000 $300.000 $361.000
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 141.000 $2.000 $2.100 $2.000 $2.400
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 83.000 $10.000 $28.000 $26.000 $31.250
PAVEMENT SLER 6"
LF 20,308.000 $1.000 $0.400 $0.380 $0.500
PAVEMENT SLER 8"
LF 7,378.000 $1.000 $0.500 $0.480 $0.600
PAVEMENT SLER 12"
LF 201.000 $2.000 $1.600 $1.500 $1.800
PAVEMENT SLER 24"
LF 95.000 $3.500 $3.200 $3.000 $3.600
PAVEMENT SLER (ARROW)
EA 3.000 $15.000 $16.000 $15.000 $18.000
PAVEMENT SLER (WORD)
EA 9.000 $30.000 $27.000 $25.000 $30.000
PAVEMENT SLER (UTURN ARROW)
EA 6.000 $100.000 $27.000 $25.000 $30.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 1,310.000 $1.750 $1.400 $1.300 $1.550
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 7,590.000 $1.750 $1.000 $0.980 $1.200
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 11,408.000 $1.750 $0.900 $0.840 $1.000
REFL PAV MRKR TY II-A-A
EA 12.000 $10.000 $8.000 $7.500 $9.050
REFL PAV MRKR TY II-C-C
EA 71.000 $8.000 $8.000 $7.500 $9.050
REFL PAV MRKR TY II-C-R
EA 342.000 $7.000 $8.000 $7.500 $9.050
ELIM EXT PM & MRKS (6")
LF 14,075.000 $0.450 $0.640 $0.600 $0.700
ELIM EXT PM & MRKS (8")
LF 2,317.000 $0.730 $0.740 $0.700 $0.850
ELIM EXT PM & MRKS (24")
LF 201.000 $2.100 $5.500 $5.000 $6.000
ELIM EXT PM & MRKS (ARROW)
EA 20.000 $44.000 $80.000 $75.000 $90.500
ELIM EXT PM & MRKS (WORD)
EA 10.000 $44.000 $80.000 $75.000 $90.500
BONDING COURSE
GAL 1,479.000 $9.000 $4.000 $3.800 $5.500
Totals: $4,320,911.920 $3,866,337.780 $4,293,150.210 $4,638,579.900