WEBB US 59 (0542-01-100)

Items: 64

County: WEBB
Length: 4.7630 MILES
Highway: US 59
District: LAREDO
Control Number: 0542-01-100
DBE Goal: 0.0%
Project: F 2026(262)
Guaranty: $100,000.00
Time: 220 WORKING DAYS
Engineer's Estimate: $20,635,133.75
Date: 01/06/2026 (4 months ago)
Contract Number: 1263004
Type: RESURFACE ROADWAY
Project ID: A00189688
Contract Type: Federal
Project Description: RESURFACE OF EXISTING ROADWAY OVERLAY, SPOTBASE REPAIR, MBGF, AND PAVEMENT MARKING
Mail/Deliver Bids To: N/A
JOSE VARGAS
CYNTHIA GARCIA
ANGEL MARTINEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$20,635,133.75
$16,415,512.14
Over/Under Est: -20.45% -$4,219,621.61
Over/Under Est: -19.07% -$3,935,668.55
Amt Left: 1.73% $283,953.06
$17,421,354.65
Over/Under Est: -15.57% -$3,213,779.10
Amt Left: 6.13% $1,005,842.51
Delta: -4.32% -$721,889.45
$17,859,111.28
Over/Under Est: -13.45% -$2,776,022.47
Amt Left: 8.79% $1,443,599.14
Delta: -2.51% -$437,756.63
Subcontractor Percentage Amount
LINEAR TRAFFIC MARKINGS LLC 2.65% $435,011.07
K. L. DURHAM CONSTRUCTION, L.L.C. 2.51% $412,029.35
HJC FARMS, INC. 0.50% $82,077.56
HIGHWAY BARRICADES AND SERVICES, LLC 0.25% $41,038.78
SURFACE PREPARATION TECHNOLOGIES, LLC 0.24% $39,397.23
Total: 6.15% $1,009,553.99

Bid Items & Bid Tabulations

64 Total 0 of 64
WEBB  |  US 59  |  LAREDO  |  0542-01-100  |  01/06/2026  |  $20,635,133.75  |  F 2026(262)  |  RESURF ROADWAY  |  220 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANDERSON COLUMBIA CO., INC.
TEXAS MATERIALS GROUP, INC.
HUNTER INDUSTRIES, LTD.
CK NEWBERRY, LLC
BACKFILL (TY A)
STA 634.000 $200.000 $194.000 $175.000 $129.800 $100.000
D-GR HMA TY-C SAC-A PG76-22
TON 43,630.000 $133.000 $111.000 $123.500 $111.870 $115.000
D-GR HMA TY-D PG70-22 (LEVEL-UP)
TON 16,647.000 $130.000 $100.000 $107.000 $107.810 $120.000
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
TON 19,335.000 $155.000 $144.000 $142.000 $154.890 $140.000
TOM-C PG76-22 SAC-A
TON 5,391.000 $157.000 $111.000 $161.000 $125.660 $120.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 51,865.000 $35.000 $28.000 $28.000 $28.450 $35.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 66,681.000 $37.000 $36.000 $34.400 $36.260 $38.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR 2.5"
SY 5,490.000 $30.000 $24.000 $20.300 $15.570 $30.000
PLANE ASPH CONC PAV(0" TO 1")
SY 11,540.000 $2.500 $2.000 $1.900 $1.760 $1.000
PLANE ASPH CONC PAV(0" TO 2")
SY 4,718.000 $3.500 $8.000 $2.000 $1.760 $1.000
PLANE ASPH CONC PAV(1")
SY 2,590.000 $0.860 $4.300 $1.900 $1.980 $1.000
PLANE ASPH CONC PAV(2")
SY 151,379.000 $2.400 $2.000 $2.000 $1.870 $1.000
MOBILIZATION
LS 1.000 $1,869,519.000 $842,000.000 $643,000.000 $1,096,580.630 $1,500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $6,500.000 $3,000.000 $3,400.000 $4,515.290 $5,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $12,500.000 $18,000.000 $6,000.000 $8,118.750 $5,000.000
TMA (STATIONARY)
DAY 217.000 $350.000 $300.000 $100.000 $108.250 $25.000
TMA (MOBILE OPERATION)
HR 475.000 $500.000 $75.000 $50.000 $162.380 $25.000
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 4,340.000 $76.000 $25.000 $60.000 $99.000 $50.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 158,720.000 $0.180 $0.140 $0.140 $0.140 $0.080
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 135,820.000 $0.220 $0.120 $0.160 $0.160 $0.110
MTL W-BEAM GD FEN (TIM POST)
LF 1,249.000 $25.500 $27.000 $25.000 $25.000 $25.000
MTL W-BEAM GD FEN (STEEL POST)
LF 100.000 $80.000 $50.000 $45.000 $45.000 $45.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,500.000 $4,000.000 $3,270.000 $2,500.000 $2,500.000
REMOVE METAL BEAM GUARD FENCE
LF 1,349.000 $3.000 $1.000 $1.000 $1.000 $1.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $275.000 $100.000 $100.000 $100.000 $100.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,000.000 $3,400.000 $3,125.000 $3,125.000 $3,125.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $275.000 $100.000 $100.000 $100.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 16.000 $45.000 $54.000 $50.000 $50.000 $50.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 9,104.000 $1.850 $2.000 $1.600 $1.600 $0.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 13,443.000 $1.850 $2.000 $1.600 $1.600 $0.500
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 105.000 $1.050 $1.100 $1.000 $1.500 $2.800
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 8,397.000 $0.900 $0.920 $0.840 $0.880 $1.300
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 372.000 $3.000 $3.200 $2.900 $2.000 $5.400
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 4,864.000 $13.000 $7.000 $6.500 $7.000 $7.800
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 88.000 $170.000 $160.000 $145.000 $95.000 $120.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 46.000 $245.000 $160.000 $150.000 $140.000 $140.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 360.000 $3.000 $2.700 $2.480 $2.000 $5.800
PAVEMENT SLER 6"
LF 1,478.000 $0.500 $0.160 $0.150 $0.420 $0.450
PAVEMENT SLER 8"
LF 444.000 $1.000 $0.220 $0.200 $0.480 $1.000
PAVEMENT SLER 24"
LF 781.000 $3.000 $0.760 $0.700 $2.000 $2.000
PAVEMENT SLER (ARROW)
EA 6.000 $50.000 $11.000 $10.000 $20.000 $40.000
PAVEMENT SLER (WORD)
EA 4.000 $60.000 $11.000 $10.000 $20.000 $40.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 21,253.000 $0.700 $0.580 $0.530 $0.780 $0.750
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 235,684.000 $0.700 $0.560 $0.520 $0.540 $0.620
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 22,990.000 $0.850 $0.570 $0.530 $0.780 $0.720
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 152,894.000 $0.650 $0.570 $0.530 $0.580 $0.650
PREFAB PM TY B (W)(6")(SLD)
LF 5,380.000 $10.000 $4.000 $3.700 $8.250 $3.800
PREFAB PM TY B (W)(6")(BRK)CONTRAST
LF 488.000 $14.000 $14.000 $13.000 $18.000 $3.800
PREFAB PM TY B (W)(8")(SLD)
LF 2,545.000 $12.000 $13.000 $12.000 $9.000 $4.800
PREFAB PM TY B (Y)(6")(SLD)
LF 5,500.000 $10.000 $11.000 $10.000 $8.250 $2.400
REFL PAV MRKR TY I-C
EA 1,542.000 $5.750 $4.000 $3.550 $5.000 $4.900
REFL PAV MRKR TY II-A-A
EA 2,700.000 $6.250 $4.000 $3.550 $5.000 $3.800
REFL PAV MRKR TY II-C-R
EA 142.000 $6.250 $4.000 $3.550 $7.500 $4.900
ELIM EXT PM & MRKS (4")
LF 17,753.000 $0.600 $0.800 $0.700 $0.400 $0.450
ELIM EXT PM & MRKS (8")
LF 1,688.000 $1.750 $0.900 $0.800 $0.600 $1.200
ELIM EXT PM & MRKS (24")
LF 781.000 $2.500 $2.200 $2.000 $3.000 $5.000
ELIM EXT PM & MRKS (ARROW)
EA 6.000 $50.000 $44.000 $40.000 $55.000 $120.000
ELIM EXT PM & MRKS (WORD)
EA 4.000 $50.000 $44.000 $40.000 $55.000 $120.000
PAV SURF PREP FOR MRK (6")
LF 17,753.000 $0.100 $0.180 $0.170 $0.100 $1.000
PAV SURF PREP FOR MRK (8")
LF 1,688.000 $0.550 $0.210 $0.190 $0.150 $0.200
PAV SURF PREP FOR MRK (24")
LF 781.000 $0.750 $0.600 $0.550 $0.250 $2.000
PAV SURF PREP FOR MRK (ARROW)
EA 6.000 $10.000 $11.000 $10.000 $30.000 $20.000
PAV SURF PREP FOR MRK (WORD)
EA 4.000 $10.000 $11.000 $10.000 $30.000 $20.000
BONDING COURSE
GAL 122,641.000 $3.500 $2.000 $0.050 $2.970 $3.000
Totals: $20,635,133.750 $16,415,512.140 $16,699,465.200 $17,421,354.650 $17,859,111.280