Show Job Controls
Bid Cobra

WEBB IH 69W (0086-14-084)

Items: 198

County: WEBB
Length: N/A
Highway: IH 69W
District: LAREDO
Control Number: 0086-14-084
DBE Goal: N/A
Project: C 86-14-84
Guaranty: N/A
Time: 433 WORKING DAYS
Engineer's Estimate: $13,361,330.05
Date: 08/06/2020 (5 years ago)
Contract Number: N/A
Type: BASE,GRADE,CONC PAVT,SIGNS,PAV MRKS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$13,361,330.05
$13,993,276.69
Over/Under Est: 4.73% $631,946.64
Over/Under Est: 11.49% $1,535,766.20
Amt Left: 6.46% $903,819.56
$16,396,236.19
Over/Under Est: 22.71% $3,034,906.14
Amt Left: 17.17% $2,402,959.50
Delta: -10.06% -$1,499,139.94
Over/Under Est: 38.65% $5,164,583.37
Amt Left: 32.39% $4,532,636.73
Delta: -12.99% -$2,129,677.23

Bid Items & Bid Tabulations

198 Total 0 of 198
WEBB  |  IH 69W  |  LAREDO  |  0086-14-084  |  08/06/2020  |  $13,361,330.05  |  C 86-14-84  |  BASE,GRADE,CONC PAVT,SIGNS,PAV MRKS  |  433 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SER CONSTRUCTION PARTNERS, LLC
ANDERSON COLUMBIA CO., INC.
WEBBER, LLC
ANGEL BROTHERS HOLDINGS CORP.
PREPARING ROW
STA 93.000 $1,398.330 $3,500.000 $1,500.000 $20,858.150 $7,525.000
REMOVING CONC (PAV)
SY 7,254.000 $23.000 $39.000 $36.000 $35.000 $35.000
REMOVING CONC (RIPRAP)
SY 1,567.000 $9.990 $7.200 $10.000 $12.000 $12.000
REMOVING CONC (CTB)
LF 11,506.000 $8.500 $5.800 $12.000 $12.000 $14.000
REMOVING CONC (PAVERS)
SY 2,339.000 $13.640 $6.000 $8.000 $3.000 $10.000
REMOVING STAB BASE & ASPH PAV (12")
SY 7,254.000 $15.000 $5.200 $10.000 $12.000 $12.000
EXCAVATION (ROADWAY)
CY 13,368.000 $12.120 $11.000 $12.000 $19.000 $19.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 13,348.000 $10.350 $14.300 $6.000 $7.000 $60.000
FURNISHING AND PLACING TOPSOIL (4")
SY 41,580.000 $1.240 $1.100 $1.200 $2.040 $2.000
BROADCAST SEED (PERM) (URBAN) (CLAY)
SY 41,580.000 $0.120 $0.200 $0.140 $0.140 $0.220
STRAW OR HAY MULCHING
SY 41,580.000 $0.430 $0.200 $0.200 $0.220 $0.510
VEGETATIVE WATERING
MG 650.000 $24.160 $1.000 $48.000 $41.190 $46.000
PROOF ROLLING
HR 10.000 $100.060 $114.600 $100.000 $167.450 $183.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 4,433.000 $78.000 $43.500 $88.000 $85.000 $105.000
D-GR HMA(SQ) TY-B PG64-22
TON 6,032.000 $115.000 $86.100 $88.000 $109.000 $87.000
TACK COAT
GAL 1,574.000 $3.300 $3.300 $3.000 $5.000 $4.100
CONC PVMT (CONT REINF - CRCP) (13")
SY 26,227.000 $88.000 $106.000 $99.000 $86.000 $115.000
CEM STABIL BKFL
CY 88.000 $141.680 $99.000 $200.000 $151.400 $240.000
TRENCH EXCAVATION PROTECTION
LF 2,557.000 $7.760 $0.200 $6.000 $6.150 $7.000
TEMPORARY SPL SHORING
SF 12,612.000 $30.000 $34.900 $28.000 $27.440 $41.000
DRILL SHAFT (18 IN)
LF 24.000 $110.000 $339.900 $90.000 $62.210 $135.000
DRILL SHAFT (24 IN)
LF 3.000 $160.000 $368.200 $210.000 $352.020 $90.000
DRILL SHAFT (30 IN)
LF 234.000 $147.160 $373.100 $220.000 $187.310 $310.000
DRILL SHAFT (36 IN)
LF 504.000 $210.000 $486.600 $300.000 $276.850 $410.000
DRILL SHAFT (48 IN)
LF 184.000 $450.000 $602.100 $700.000 $626.860 $650.000
DRILL SHAFT (54 IN)
LF 160.000 $517.000 $696.900 $600.000 $544.990 $850.000
DRILL SHAFT (NON - REINFORCED) (12 IN)
LF 14.000 $100.000 $56.300 $80.000 $74.750 $220.000
CL C CONC (ABUT)(EXTEND)
CY 61.500 $2,000.000 $1,024.800 $2,300.000 $1,181.860 $2,300.000
CL C CONC (CAP)(EXTEND)
CY 52.100 $1,100.000 $1,756.700 $2,500.000 $1,953.010 $3,100.000
CL C CONC (COLUMN)
CY 35.500 $849.060 $1,215.600 $1,100.000 $2,209.880 $2,500.000
CL C CONC (RAIL FOUNDATION)
CY 19.000 $312.380 $510.100 $600.000 $1,015.710 $1,300.000
CL C CONC (VEH DEFL WALL)
CY 230.700 $1,100.000 $931.200 $1,200.000 $1,376.060 $1,400.000
REINF CONC SLAB (EXTEND SLAB)
SF 12,777.000 $23.270 $29.900 $35.000 $38.170 $36.000
RETAINING WALL (MSE)
SF 10,962.000 $70.000 $57.800 $77.000 $78.740 $78.000
PRESTR CONC GIRDER (TX40)
LF 423.300 $128.600 $185.400 $162.000 $167.070 $200.000
PRESTR CONC GIRDER (TX54)
LF 611.640 $109.720 $206.100 $160.000 $186.680 $200.000
PRESTR CONC GIRDER (TX62)
LF 568.800 $144.480 $195.600 $192.000 $244.680 $200.000
CONCRETE PAINT FINISH
SF 113,773.000 $0.800 $0.400 $0.900 $0.340 $1.530
RIPRAP (CONC)(4 IN)
CY 60.000 $747.810 $412.800 $475.000 $515.800 $550.000
RIPRAP (CONC)(5 IN)
CY 98.000 $440.500 $423.100 $475.000 $514.630 $500.000
RIPRAP (CONC) (CL B) (4")
CY 34.000 $450.000 $472.600 $475.000 $538.790 $600.000
RIPRAP (CONC)(FLUME)
CY 16.000 $525.840 $407.600 $475.000 $510.470 $630.000
RIPRAP (MOW STRIP)(4 IN)
CY 848.000 $460.000 $416.500 $475.000 $496.760 $610.000
RAIL (TY T221)
LF 134.000 $128.090 $78.700 $150.000 $101.620 $135.000
RAIL (TY SSTR)
LF 4,826.400 $50.000 $53.800 $100.000 $53.970 $100.000
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 5,880.000 $51.500 $60.800 $94.000 $53.440 $95.000
RAIL (TY T80TT)
LF 624.000 $180.000 $245.900 $400.000 $203.780 $570.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 97.000 $84.310 $67.600 $200.000 $140.370 $131.000
RC PIPE (CL III)(18 IN)
LF 1,516.000 $60.000 $51.700 $43.000 $52.120 $58.000
RC PIPE (CL III)(24 IN)
LF 1,304.000 $69.170 $71.400 $52.000 $58.650 $75.000
RC PIPE (CL III)(30 IN)
LF 226.000 $84.440 $81.400 $73.000 $95.000 $106.000
RC PIPE (CL IV)(30 IN)
LF 471.000 $132.000 $102.500 $76.000 $118.000 $108.000
MANH (COMPL)(PRM)(48IN)
EA 4.000 $3,332.770 $2,598.200 $3,800.000 $5,250.000 $5,600.000
INLET (COMPL)(PCO)(3FT)(LEFT)
EA 1.000 $5,223.400 $4,370.000 $5,100.000 $4,500.000 $6,800.000
INLET (COMPL)(PCO)(3FT)(BOTH)
EA 4.000 $5,650.880 $3,936.200 $4,700.000 $5,865.000 $6,700.000
INLET (COMPL)(PMBD)(4FT)
EA 6.000 $3,612.690 $4,365.300 $5,000.000 $4,500.000 $7,000.000
INLET (COMPL)(PMBD)(5FT)
EA 6.000 $6,441.220 $5,159.200 $6,400.000 $4,850.000 $7,500.000
INLET (COMPL)(PSL)(RC)(4FTX4FT)
EA 2.000 $4,465.710 $4,036.300 $5,300.000 $4,250.000 $5,700.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 7.000 $10,669.990 $3,649.100 $4,400.000 $4,865.000 $5,400.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 2.000 $6,153.470 $4,230.700 $5,100.000 $5,250.000 $6,800.000
INLET (COMPL)(TY AAD)
EA 1.000 $4,864.360 $10,635.400 $13,500.000 $7,250.000 $3,600.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 1.000 $2,671.810 $2,866.500 $3,600.000 $3,500.000 $2,200.000
CLEAN EXIST CULVERTS
EA 4.000 $2,532.560 $1,000.000 $30,000.000 $3,500.000 $6,500.000
REMOV STR (INLET)
EA 7.000 $809.010 $221.700 $500.000 $850.000 $850.000
REMOV STR (SET)
EA 1.000 $1,074.240 $221.700 $550.000 $850.000 $750.000
REMOV STR (PIPE)
LF 36.000 $11.090 $26.000 $10.000 $10.250 $76.000
REMOV STR (BOX CULVERT)
LF 240.000 $40.660 $40.900 $50.000 $88.360 $102.000
REMOVE STR (JUNCTION BOX)
EA 1.000 $950.000 $1,028.500 $2,300.000 $1,250.000 $3,400.000
REMOV STR (RET WALL)
LF 913.000 $40.370 $55.000 $150.000 $65.000 $115.000
MOBILIZATION
LS 1.000 $992,064.810 $1,420,000.000 $1,100,000.000 $1,639,000.000 $1,850,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $3,436.920 $9,487.500 $3,000.000 $16,000.000 $4,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 170.000 $26.000 $39.600 $36.000 $81.110 $41.000
ROCK FILTER DAMS (REMOVE)
LF 170.000 $17.060 $23.100 $21.000 $21.650 $28.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 11,534.000 $2.020 $2.500 $2.300 $3.670 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 11,534.000 $0.710 $1.000 $0.700 $0.930 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,280.000 $7.500 $5.500 $5.500 $8.540 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,280.000 $1.200 $1.100 $1.000 $0.930 $1.000
CONSTRUCTING DETOURS
SY 1,032.000 $36.070 $38.500 $62.000 $70.000 $60.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 10,480.000 $37.000 $41.000 $34.000 $30.000 $28.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 2,720.000 $42.000 $41.800 $28.000 $28.000 $27.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 240.000 $23.130 $47.300 $28.000 $28.000 $44.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 12,980.000 $12.000 $8.000 $10.000 $9.000 $12.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 10,480.000 $12.000 $8.000 $12.000 $9.000 $19.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 2,720.000 $8.460 $9.000 $12.000 $9.000 $15.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 240.000 $9.850 $8.900 $12.000 $9.000 $13.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 3,280.000 $70.000 $61.300 $98.000 $62.620 $69.000
LANDSCAPE PAVERS
SY 2,339.000 $60.000 $11.000 $87.000 $57.860 $41.000
CONC CURB (MONO) (TY II)
LF 379.000 $4.750 $7.400 $15.000 $26.330 $33.000
MTL W-BEAM GD FEN (TIM POST)
LF 4,380.000 $20.030 $21.500 $20.000 $19.500 $23.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $2,035.490 $1,595.000 $2,050.000 $1,450.000 $2,110.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 9.000 $1,363.920 $1,045.000 $1,000.000 $950.000 $1,100.000
REMOVE METAL BEAM GUARD FENCE
LF 4,376.000 $1.330 $1.900 $2.000 $1.750 $2.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 10.000 $137.500 $440.000 $420.000 $400.000 $460.000
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000 $191.190 $330.000 $310.000 $300.000 $341.000
GDRAIL END TRT(INSTALL)(HBA POST)
EA 9.000 $2,613.400 $2,667.500 $2,500.000 $2,425.000 $2,800.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 5.000 $2,000.000 $1,375.000 $3,500.000 $1,250.000 $1,450.000
CRASH CUSH ATTEN (REMOVE)
EA 5.000 $800.000 $990.000 $1,200.000 $900.000 $1,050.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000 $22,975.140 $28,980.600 $28,000.000 $24,500.000 $28,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $9,000.000 $7,480.000 $9,876.000 $6,800.000 $1,950.000
REMOVE RD IL ASM (U/P)
EA 25.000 $175.000 $275.000 $365.000 $350.000 $290.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 25.000 $800.000 $1,760.000 $1,000.000 $950.000 $1,850.000
CONDT (PVC) (SCH 40) (2")
LF 2,131.000 $7.990 $11.000 $13.000 $12.400 $14.100
CONDT (PVC) (SCH 80) (2") (BORE)
LF 438.000 $26.600 $49.500 $15.000 $14.200 $16.150
CONDT (PVC) (SCH 80) (3") (BORE)
LF 1,103.000 $29.470 $55.000 $21.000 $20.500 $23.350
CONDT (PVC) (SCH 80) (3") (CONC ENCSE)
LF 2,529.000 $38.670 $19.800 $17.000 $15.800 $18.000
ELEC CONDR (NO.14) INSULATED
LF 10,327.000 $0.840 $1.000 $0.750 $0.720 $1.000
ELEC CONDR (NO.8) BARE
LF 351.000 $1.120 $1.200 $1.100 $1.050 $1.200
ELEC CONDR (NO.8) INSULATED
LF 702.000 $1.220 $1.200 $1.200 $1.150 $1.300
ELEC CONDR (NO.6) BARE
LF 2,574.000 $1.490 $1.300 $1.200 $1.200 $1.400
ELEC CONDR (NO.6) INSULATED
LF 4,650.000 $1.620 $1.300 $1.400 $1.350 $1.600
GROUND BOX TY A (122311)W/APRON
EA 4.000 $857.880 $1,100.000 $700.000 $563.000 $760.000
GROUND BOX TY D (162922)W/APRON
EA 7.000 $1,450.000 $1,237.500 $890.000 $852.000 $970.000
ELC SRV TY D 120/240 060(NS)GS(N)SP(O)
EA 2.000 $7,268.550 $6,050.000 $2,650.000 $2,525.000 $2,900.000
ALUMINUM SIGNS (TY A)
SF 308.250 $27.860 $27.500 $29.000 $25.000 $25.000
ALUMINUM SIGNS (TY G)
SF 204.000 $25.040 $27.500 $26.000 $25.150 $29.000
ALUMINUM SIGNS (TY O)
SF 3,136.250 $22.210 $27.500 $23.000 $22.000 $25.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $622.870 $775.500 $780.000 $705.000 $850.000
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 1.000 $1,345.220 $1,237.500 $1,360.000 $1,215.000 $1,550.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 5.000 $2,000.000 $2,640.000 $3,140.000 $2,400.000 $1,900.000
REMOVE SM RD SN SUP&AM
EA 7.000 $63.600 $49.500 $115.000 $45.000 $69.000
REMOVE BRDG MNT CLEARANCE SIGN ASSM
EA 5.000 $754.830 $440.000 $760.000 $400.000 $460.000
INSTALL LRSS (STRUCT STEEL)
LB 903.800 $3.750 $7.700 $10.000 $9.750 $11.100
RELOCATE LRSA
EA 1.000 $1,384.000 $2,750.000 $6,200.000 $5,918.000 $6,750.000
REMOVE LRSA
EA 5.000 $694.510 $550.000 $2,300.000 $2,234.000 $2,550.000
INS OH SN SUP(30 FT BAL TEE)
EA 2.000 $20,956.390 $26,400.000 $23,000.000 $22,395.000 $25,500.000
INS OH SN SUP(55 FT BRDG)
EA 1.000 $27,000.000 $31,350.000 $43,000.000 $39,400.000 $44,800.000
INS OH SN SUP(150 FT BRDG)
EA 1.000 $83,400.000 $93,360.000 $102,000.000 $95,142.000 $108,200.000
INS OH SN SUP(155 FT BRDG)
EA 3.000 $87,710.000 $101,200.000 $104,000.000 $97,847.000 $111,200.000
REMOVE OVERHD SIGN SUP
EA 7.000 $12,158.660 $5,500.000 $13,700.000 $13,065.000 $14,900.000
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 3.000 $2.600 $22.000 $21.000 $20.000 $23.000
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 593.000 $2.860 $5.200 $5.000 $4.750 $5.500
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 11,868.000 $0.590 $0.600 $0.600 $0.580 $0.700
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 37,837.000 $1.210 $0.600 $0.600 $0.570 $0.700
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 70.000 $1.230 $2.200 $2.100 $2.000 $2.300
WK ZN PAV MRK REMOV (W)(ARROW)
EA 1.000 $150.000 $220.000 $210.000 $200.000 $230.000
WK ZN PAV MRK REMOV (W)(ENTR GORE)
EA 12.000 $550.000 $313.500 $300.000 $285.000 $330.000
WK ZN PAV MRK REMOV (W)(EXIT GORE)
EA 8.000 $550.000 $313.500 $300.000 $285.000 $330.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 1.000 $150.000 $247.500 $235.000 $225.000 $260.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 34,770.000 $1.260 $0.600 $0.600 $0.570 $0.700
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 8,557.000 $0.830 $1.400 $1.300 $1.250 $1.500
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 434.000 $3.400 $2.500 $2.300 $2.250 $2.600
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 3,446.000 $3.000 $2.500 $2.300 $2.250 $2.600
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 4.000 $121.190 $93.500 $90.000 $85.000 $97.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 4.000 $150.440 $93.500 $90.000 $85.000 $97.000
RE PV MRK TY I(BLACK)4"(SHADOW)(100MIL)
LF 8,737.000 $1.860 $1.000 $1.000 $0.900 $1.000
PAVEMENT SEALER 4"
LF 20,597.000 $0.150 $0.300 $0.300 $0.300 $0.400
PAVEMENT SEALER 8"
LF 8,557.000 $0.300 $0.700 $0.600 $0.600 $0.700
PAVEMENT SEALER 12"
LF 3,958.000 $0.450 $1.000 $1.000 $0.900 $1.050
PAVEMENT SEALER (ARROW)
EA 4.000 $12.000 $38.500 $37.000 $35.000 $40.000
PAVEMENT SEALER (WORD)
EA 4.000 $15.000 $38.500 $37.000 $35.000 $40.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 8,737.000 $0.390 $0.600 $0.600 $0.560 $0.650
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 21,706.000 $0.320 $0.600 $0.600 $0.550 $0.650
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 20,589.000 $0.320 $0.600 $0.600 $0.550 $0.650
REFL PAV MRKR TY II-C-R
EA 1,026.000 $3.570 $4.100 $4.000 $3.750 $4.300
PAV SURF PREP FOR MRK (4")
LF 20,597.000 $0.100 $0.030 $0.020 $0.020 $0.020
PAV SURF PREP FOR MRK (8")
LF 8,557.000 $0.140 $0.050 $0.040 $0.040 $0.050
PAV SURF PREP FOR MRK (12")
LF 3,958.000 $0.730 $0.100 $0.060 $0.060 $0.070
PAV SURF PREP FOR MRK (ARROW)
EA 4.000 $22.520 $0.600 $0.500 $0.500 $0.600
PAV SURF PREP FOR MRK (WORD)
EA 4.000 $23.780 $0.600 $0.500 $0.500 $0.600
REMOVING TRAFFIC SIGNALS
EA 2.000 $3,310.000 $2,750.000 $5,500.000 $5,235.000 $2,850.000
REMOVAL OF CONDUIT
LF 810.000 $6.740 $6.600 $18.000 $16.750 $19.100
REMOVAL OF GROUND BOXES
EA 6.000 $105.000 $203.500 $305.000 $290.000 $330.000
REMOVAL OF SIGNAL POLE ASSM
EA 1.000 $784.000 $203.500 $730.000 $695.000 $790.000
FULL - WIDTH MOWING
AC 9.000 $180.000 $166.700 $290.000 $200.980 $285.000
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
SF 71,403.000 $0.810 $0.900 $0.800 $0.790 $2.250
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
LF 68.000 $4.130 $27.500 $30.000 $75.000 $370.000
WIDE FLANGE PAVEMENT TERMINALS
LF 390.000 $288.640 $25.000 $520.000 $504.600 $720.000
REMOVE UNDERGROUND CONDUIT
LF 185.000 $11.500 $13.200 $22.000 $20.950 $24.000
REMOVE GROUND BOX
EA 4.000 $238.500 $203.500 $300.000 $290.000 $330.000
REMOVE HIGH MAST ILLUM FIXTURE
EA 15.000 $6,000.000 $2,200.000 $152.000 $146.000 $170.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $16,000.000 $11,935.000 $21,100.000 $19,755.630 $12,200.000
FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)
LF 2,707.000 $1.220 $5.000 $3.300 $3.200 $3.700
FIBER OPTIC CBL (SNGLE-MODE)(72 FIBER)
LF 3,279.000 $3.430 $6.100 $3.600 $3.450 $4.000
FIBER OPTIC SPLICE ENCLOSURE
EA 5.000 $1,376.330 $1,815.000 $1,260.000 $1,207.000 $1,400.000
FIBER OPTIC PATCH PANEL (6 POSITION)
EA 6.000 $1,200.000 $2,420.000 $420.000 $400.000 $500.000
FIBER OPTIC PATCH PANEL (72 POSITION)
EA 2.000 $1,800.000 $4,950.000 $1,580.000 $1,503.000 $1,710.000
FIBER OPTIC CABLE ROAD MARKER
EA 11.000 $141.180 $264.000 $200.000 $192.000 $220.000
FIBER OPTIC FUSION SPLICE
EA 82.000 $38.060 $11.000 $33.000 $32.000 $37.000
ITS GRND MNT CAB (TY 6) (CONF 2)
EA 2.000 $11,548.630 $11,000.000 $14,200.000 $13,508.000 $15,400.000
CCTV FIELD EQUIPMENT (DIGITAL)
EA 2.000 $7,814.220 $10,450.000 $9,850.000 $9,382.000 $10,800.000
CCTV FIELD CONTROLLER
EA 2.000 $4,654.830 $10,450.000 $5,860.000 $5,585.000 $6,400.000
CCTV MOUNT (POLE)
EA 2.000 $414.490 $1,650.000 $3,050.000 $2,928.000 $3,330.000
REMOVE CCTV FIELD EQUIPMENT
EA 2.000 $2,050.000 $880.000 $1,770.000 $1,695.000 $1,920.000
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
LF 1,658.000 $10.710 $35.200 $14.000 $13.900 $16.000
ITS MULTI-DUCT CND (PVC-80)(BORE)
LF 1,034.000 $28.630 $71.500 $55.000 $52.950 $61.000
CONDUIT (PREPARE)
LF 8,360.000 $2.030 $2.800 $0.900 $0.850 $1.000
INSTALL DMS (FOUNDATION MTD CABINET)
EA 2.000 $7,200.000 $11,000.000 $11,200.000 $10,706.000 $12,200.000
ITS POLE (50 FT)(110 MPH)
EA 2.000 $13,875.800 $11,000.000 $11,600.000 $11,063.000 $12,600.000
ITS POLE MNT CAB (TY 2)(CONF 1)
EA 2.000 $4,408.350 $13,200.000 $7,700.000 $7,327.000 $8,400.000
LED HI MST IL ASM (6 FIXT)(ASYM)(TY A)
EA 15.000 $26,465.460 $9,460.000 $8,900.000 $8,474.000 $9,700.000
TMA (STATIONARY)
DAY 866.000 $180.000 $136.400 $158.000 $294.290 $142.000
TMA (MOBILE OPERATION)
HR 1,088.000 $65.930 $42.600 $68.000 $75.430 $57.000
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 7.000 $3,959.380 $4,400.000 $3,300.000 $3,150.000 $3,600.000
REMOVE DYNAMIC MESSAGE SIGN SYSTEM
EA 1.000 $5,138.730 $5,500.000 $9,250.000 $8,812.000 $10,100.000
INSTALL OF DIG VID ENCODER(ETHERNET)SYS
EA 3.000 $1,275.000 $4,950.000 $370.000 $357.000 $410.000
INSTALL OF HARDENED ETHERNET SWITCHES
EA 1.000 $1,667.000 $2,640.000 $370.000 $357.000 $410.000
INSTALL OF ETHERNET SURGE PROTECTORS
EA 5.000 $967.000 $715.000 $680.000 $648.000 $740.000
INSTALL ETHER MEDIA CONVERT(TRANSCEIVE)
EA 10.000 $1,275.000 $797.500 $205.000 $198.000 $230.000
Totals: $13,361,330.052 $13,993,276.704 $14,897,096.250 $16,396,236.211 $18,525,913.420