WEBB SH 359 (0086-01-099)

Items: 79

County: WEBB
Length: N/A
Highway: SH 359
District: LAREDO
Control Number: 0086-01-099
DBE Goal: N/A
Project: F 2022(924)
Guaranty: N/A
Time: 162 WORKING DAYS
Engineer's Estimate: $1,191,956.98
Date: 08/03/2022 (3 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
ANTONIO REYNA1
ALBERTO CHAVEZ
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$1,191,956.98
$1,341,138.27
Over/Under Est: 12.52% $149,181.29
$1,509,551.65
Over/Under Est: 26.64% $317,594.67
Amt Left: 12.56% $168,413.38
Subcontractor Percentage Amount
LDJ ENGINEERING, LLC 38.92% $536,286.44
ERASMO A GONZALEZ, LLC 15.24% $209,995.00
HIGHWAY 1 LLC 3.12% $42,991.10
TRIPLE H FIELD SERVICES, LLC 3.05% $42,026.56
Total: 60.33% $831,299.10

Bid Items & Bid Tabulations

79 Total 0 of 79
WEBB  |  SH 359  |  LAREDO  |  0086-01-099  |  08/03/2022  |  $1,191,956.98  |  F 2022(924)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  162 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
B & MS CONSTRUCTION, INC.
TRAF-TEX, INC.
REMOVING CONC (SIDEWALKS)
SY 9.000 $18.500 $28.750 $278.000
REMOVING CONC (DRIVEWAYS)
SY 671.000 $18.500 $40.250 $39.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 40.000 $13.350 $63.250 $61.170
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 86.000 $11.500 $17.250 $25.000
DRILL SEEDING (PERM) (URBAN) (CLAY)
SY 493.000 $2.000 $2.000 $7.750
VEGETATIVE WATERING
MG 42.000 $17.500 $20.000 $639.000
CEMENT STAB BACKFILL (INLET OR MH)
CY 5.000 $60.000 $149.500 $389.250
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 160.000 $279.420 $442.750 $131.000
RIPRAP (CONC)(4 IN)
CY 1.000 $500.000 $546.250 $1,344.000
RIPRAP (CONC)(CL B)
CY 6.300 $580.000 $396.750 $1,344.000
RAIL (TY PR11)
LF 68.000 $200.000 $218.500 $384.000
RC PIPE (CL III)(24 IN)
LF 5.000 $150.000 $230.000 $289.000
INLET (COMPL)(TY C)(MOD)
EA 1.000 $5,500.000 $6,325.000 $4,743.000
ADJUSTING INLET (CAP)
EA 3.000 $3,200.000 $5,175.000 $5,735.000
ADJUSTING MANHOLES(CAP)
EA 1.000 $1,500.000 $1,500.000 $4,009.000
REMOVE STR (JUNCTION BOX)
EA 1.000 $1,000.000 $1,150.000 $3,670.000
MOBILIZATION
LS 1.000 $108,359.730 $90,000.000 $84,213.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $6,000.000 $5,175.000 $6,664.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 40.000 $63.000 $74.750 $173.000
ROCK FILTER DAMS (REMOVE)
LF 40.000 $14.000 $9.200 $104.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 300.000 $4.500 $3.450 $9.440
TEMP SEDMT CONT FENCE (REMOVE)
LF 300.000 $1.100 $1.730 $2.720
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 140.000 $7.200 $5.750 $20.770
BIODEG EROSN CONT LOGS (REMOVE)
LF 140.000 $1.850 $2.300 $7.340
CONC CURB (MONO) (TY II)
LF 5.000 $14.500 $74.750 $37.280
CONC CURB & GUTTER (TY II)
LF 40.000 $29.000 $51.750 $38.420
DRIVEWAYS (CONC) (FAST TRACK)
SY 671.000 $115.000 $115.000 $98.200
CONC SIDEWALKS (4")
SY 3,126.000 $63.000 $100.000 $76.000
CURB RAMPS (TY 1)
EA 1.000 $2,300.000 $6,325.000 $4,282.000
CURB RAMPS (TY 10)
EA 1.000 $2,300.000 $3,500.000 $4,287.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 10.000 $4,000.000 $4,600.000 $4,776.000
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 8.000 $5,000.000 $4,887.500 $5,687.000
CONDT (PVC) (SCH 40) (2")
LF 3,660.000 $14.000 $20.130 $14.100
CONDT (PVC) (SCH 80) (2") (BORE)
LF 234.000 $27.000 $18.110 $28.000
ELEC CONDR (NO.8) BARE
LF 3,899.000 $2.000 $1.730 $1.800
ELEC CONDR (NO.8) INSULATED
LF 7,798.000 $2.100 $2.300 $2.200
GROUND BOX TY C (162911)W/APRON
EA 2.000 $1,100.000 $1,725.000 $879.000
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
EA 2.000 $5,200.000 $6,325.000 $6,943.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 24.000 $45.000 $40.250 $23.320
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 13.000 $830.000 $517.500 $238.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $720.000 $1,725.000 $238.000
REMOVE SM RD SN SUP&AM
EA 1.000 $135.000 $143.750 $121.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,830.000 $1.200 $1.150 $3.600
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 885.000 $9.650 $5.750 $9.540
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 19.000 $155.000 $155.250 $238.600
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 2.000 $230.000 $287.500 $298.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 15.000 $160.000 $189.750 $250.500
PAVEMENT SEALER 8"
LF 750.000 $0.350 $0.230 $0.660
PAVEMENT SEALER 24"
LF 125.000 $4.500 $1.380 $0.440
PAVEMENT SEALER (ARROW)
EA 1.000 $50.000 $40.250 $151.000
PAVEMENT SEALER (WORD)
EA 1.000 $50.000 $40.250 $120.000
PAVEMENT SEALER (DBL ARROW)
EA 1.000 $75.000 $57.500 $143.000
PAV SURF PREP FOR MRK (8")
LF 750.000 $0.150 $0.120 $0.140
PAV SURF PREP FOR MRK (24")
LF 125.000 $1.400 $0.580 $0.950
PAV SURF PREP FOR MRK (ARROW)
EA 2.000 $30.000 $17.250 $19.100
PAV SURF PREP FOR MRK (DBL ARROW)
EA 1.000 $50.000 $17.250 $23.000
PAV SURF PREP FOR MRK (WORD)
EA 1.000 $50.000 $20.130 $25.000
VEH SIG SEC (12")LED(YEL)
EA 2.000 $260.000 $460.000 $313.000
REMOVAL OF CONTROL CABINET(GRND MNT)
EA 8.000 $1,500.000 $690.000 $1,496.000
INSTALL OF CONTROL CABINET(GRND MNT)
EA 8.000 $4,000.000 $1,610.000 $1,496.000
INSTALL CIRCUIT BREAKER
EA 1.000 $850.000 $172.500 $303.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $3,277.500 $432.000
CONDUIT (PREPARE)
LF 56.000 $1.200 $0.860 $3.780
GROUND BOX (PREPARE)
EA 2.000 $550.000 $402.500 $374.000
ITS RADIO (SNGL)(5 GHZ)-I-O
EA 20.000 $3,900.000 $3,220.000 $4,477.000
ITS RADIO (DUAL)(5 GHZ/5 GHZ)-C-U
EA 1.000 $4,800.000 $5,175.000 $5,160.000
TMA (STATIONARY)
DAY 158.000 $190.000 $299.000 $421.000
TMA (MOBILE OPERATION)
HR 32.000 $88.000 $74.750 $651.000
RVDS(PRESENCE DETECTION ONLY)
EA 32.000 $4,800.000 $805.000 $8,509.000
REMOVE RVDS
EA 4.000 $220.000 $402.500 $1,027.000
VIVDS PROSR SYS
EA 6.000 $7,700.000 $5,750.000 $20,595.000
VIVDS CAM ASSY 360
EA 6.000 $4,100.000 $6,210.000 $2,530.000
VIVDS CNTRL SOFTWARE
EA 2.000 $1,100.000 $1,725.000 $562.000
VIVDS CABLING
LF 1,200.000 $3.060 $8.000 $2.370
VIVDS PROS CABINET EQUIP (REMOVE)
EA 13.000 $240.000 $2,500.000 $295.000
VIVDS CAM ASSY (REMOVE)
EA 49.000 $120.000 $1,495.000 $170.000
VIVDS CABLING (REMOVE)
LF 9,820.000 $0.590 $3.450 $1.000
FIELD HARDENED ETHERNET SWITCHES
EA 19.000 $500.000 $485.000 $198.260
ETHERNET SURGE PROTECTORS
EA 21.000 $135.000 $586.500 $70.000
Totals: $1,191,956.980 $1,341,138.275 $1,509,551.650