WEBB SH 359 (0086-01-091)

Items: 94

County: WEBB
Length: N/A
Highway: SH 359
District: LAREDO
Control Number: 0086-01-091
DBE Goal: N/A
Project: STP 1802(248)HES
Guaranty: N/A
Time: 371 WORKING DAYS
Engineer's Estimate: $28,072,486.90
Date: 06/06/2018 (7 years ago)
Contract Number: N/A
Type: PLANING,PAV REPAIR,ACP,PAV MRK,MBGF,PROFILE MRK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$28,072,486.90
$28,248,453.66
Over/Under Est: 0.63% $175,966.76
Over/Under Est: 7.33% $2,058,968.43
Amt Left: 6.67% $1,883,001.67

Bid Items & Bid Tabulations

94 Total 0 of 94
WEBB  |  SH 359  |  LAREDO  |  0086-01-091  |  06/06/2018  |  $28,072,486.90  |  STP 1802(248)HES  |  PLANING,PAV REPAIR,ACP,PAV MRK,MBGF,...  |  371 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANDERSON COLUMBIA CO., INC.
ANGEL BROTHERS HOLDINGS CORP.
REMOVING CONC (CURB)
LF 85.000 $10.000 $10.000 $16.500
REMOVING CONCRETE(MOW STRIP)
LF 2,675.000 $6.000 $5.000 $2.500
EXCAVATION (ROADWAY)
CY 312.000 $7.000 $11.000 $8.500
SUBGRADE WIDENING (DENS CONT)
STA 17.650 $200.000 $180.000 $550.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 390.000 $35.000 $22.000 $18.000
BACKFILL (TY A)
STA 1,977.000 $120.000 $90.000 $75.000
BLADING
HR 10.000 $118.000 $180.000 $100.000
PROOF ROLLING
HR 10.000 $78.000 $70.000 $62.000
PRIME COAT (MC-30)
GAL 790.000 $4.000 $3.700 $4.600
D-GR HMA(SQ) TY-B PG64-22
TON 650.000 $90.000 $76.000 $73.000
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
TON 6,917.000 $72.000 $60.000 $75.000
SUPERPAVE MIXTURES SP-C SAC-A PG76-22
TON 138,294.000 $72.000 $85.000 $89.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 289,666.000 $45.000 $36.000 $45.000
PLANE ASPH CONC PAV(0" TO 2")
SY 21,360.000 $1.400 $2.000 $1.800
PLANE ASPH CONC PAV (3")
SY 157,990.000 $1.200 $1.500 $2.000
PLAN & TEXT CONC PAV (2" TO 6")
SY 14,808.000 $3.000 $3.000 $2.250
CL C CONC (RAC-R)
CY 40.000 $650.000 $1,200.000 $900.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 30.000 $115.000 $250.000 $155.000
CONC STR REPAIR (STANDARD)
SF 20.000 $195.000 $175.000 $155.000
RIPRAP (CONC)(4 IN)
CY 16.200 $400.000 $430.000 $475.000
RIPRAP (MOW STRIP)(4 IN)
CY 1,018.000 $395.000 $390.000 $430.000
CLEANING AND SEALING EXISTING JOINTS
LF 582.000 $20.000 $46.000 $18.000
RETROFIT RAIL (TY T631)
LF 1,068.000 $80.000 $77.000 $72.500
CLEAN EXIST CULVERTS
EA 22.000 $700.000 $1,400.000 $1,100.000
MOBILIZATION
LS 1.000 $1,335,995.000 $1,890,000.000 $685,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 19.000 $6,000.000 $2,000.000 $1,600.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 132.000 $40.000 $90.000 $28.000
ROCK FILTER DAMS (REMOVE)
LF 132.000 $11.000 $33.000 $8.400
TEMP SEDMT CONT FENCE (INSTALL)
LF 160.000 $2.500 $7.000 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 160.000 $1.000 $3.000 $1.000
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 3,320.000 $42.000 $70.000 $85.000
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
LF 1,950.000 $18.500 $23.000 $18.000
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
LF 23,400.000 $8.000 $12.000 $10.500
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
LF 1,950.000 $11.000 $12.000 $18.000
RUMBLE STRIPS (SHOULDER)
LF 445,883.000 $0.150 $0.160 $0.070
RUMBLE STRIPS (CENTERLINE)
LF 197,502.000 $0.150 $0.240 $0.070
MTL W-BEAM GD FEN (TIM POST)
LF 11,400.000 $21.000 $21.000 $19.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 6.000 $1,500.000 $2,500.000 $2,100.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,050.000 $1,000.000 $950.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 296.000 $75.000 $70.000 $65.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 16.000 $1,200.000 $1,120.000 $1,050.000
REMOVE METAL BEAM GUARD FENCE
LF 10,525.000 $3.000 $1.400 $1.250
REMOVE TERMINAL ANCHOR SECTION
EA 12.000 $210.000 $210.000 $200.000
RM MTL BM GD FEN TRANS (T101)
EA 38.000 $225.000 $210.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 137.000 $2,200.000 $2,350.000 $2,200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 116.000 $250.000 $215.000 $200.000
CRASH CUSH ATTEN (INSTL)
EA 6.000 $10,500.000 $9,125.000 $5,500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 72.000 $1,000.000 $1,300.000 $750.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $900.000 $1,170.000 $350.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $490.000 $530.000 $498.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $900.000 $800.000 $750.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 13.000 $300.000 $370.000 $350.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 22.000 $21.000 $13.000 $25.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 653.000 $21.000 $13.000 $25.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 22.000 $21.000 $13.000 $25.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 8.000 $75.000 $80.000 $75.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 34.000 $21.000 $16.000 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 653.000 $21.000 $16.000 $30.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 34.000 $21.000 $16.000 $30.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 25,845.000 $0.550 $1.500 $1.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 550.000 $1.350 $1.000 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 9,679.000 $0.800 $0.650 $0.610
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 181.000 $5.500 $5.500 $5.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 47.000 $100.000 $93.000 $87.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 4.000 $150.000 $215.000 $200.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 32.000 $150.000 $120.000 $111.000
REFL PAV MRK TY II (W) 4" (BRK)
LF 16,380.000 $0.200 $0.110 $0.100
REFL PAV MRK TY II (Y) 4" (BRK)
LF 43,778.000 $0.200 $0.110 $0.100
REFL PAV MRK TY II (Y) 4" (SLD)
LF 140,337.000 $0.200 $0.110 $0.100
PAVEMENT SEALER 4"
LF 480.000 $0.200 $1.000 $1.000
PAVEMENT SEALER 24"
LF 50.000 $2.000 $5.000 $5.000
PAVEMENT SEALER (ARROW)
EA 2.000 $30.000 $80.000 $75.000
PAVEMENT SEALER (WORD)
EA 1.000 $30.000 $80.000 $75.000
REF PROF PAV MRK TY I(W)4"(SLD)(060MIL)
LF 1,402.000 $0.300 $3.000 $3.000
REF PROF PAV MRK TY I(Y)4"(SLD)(060MIL)
LF 96.000 $0.300 $5.500 $5.000
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
LF 653.000 $0.300 $4.400 $4.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 16,380.000 $0.300 $0.300 $0.300
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 483,456.000 $0.300 $0.300 $0.290
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 47,722.000 $0.300 $0.300 $0.300
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 224,795.000 $0.300 $0.300 $0.290
REFL PAV MRKR TY I-C
EA 452.000 $3.000 $3.000 $3.000
REFL PAV MRKR TY II-A-A
EA 5,114.000 $3.000 $3.000 $3.000
REFL PAV MRKR TY II-C-R
EA 831.000 $3.000 $3.000 $3.000
ELIM EXT PAV MRK & MRKS (4")
LF 480.000 $0.300 $1.000 $1.000
ELIM EXT PAV MRK & MRKS (24")
LF 50.000 $2.500 $5.400 $5.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 2.000 $50.000 $67.000 $63.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 1.000 $50.000 $67.000 $63.000
BONDING COURSESE
GAL 112,355.000 $2.000 $3.000 $4.250
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,000.000 $13,400.000 $7,500.000
LONG CHANNEL MOUNT CURB SYS (INSTALL)
LF 218.000 $99.000 $75.000 $60.000
LONG CHANNEL MOUNT CURB SYS (REMOVE)
LF 218.000 $11.000 $21.000 $15.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 80.000 $19.000 $12.000 $11.500
TMA (STATIONARY)
EA 4.000 $525.000 $46,900.000 $10,000.000
TMA (MOBILE OPERATION)
HR 1,200.000 $25.000 $23.000 $45.000
Totals: $28,072,486.900 $28,248,453.660 $30,131,455.330