WEBB US 83 (0037-09-033)

Items: 133

County: WEBB
Length: N/A
Highway: US 83
District: LAREDO
Control Number: 0037-09-033
DBE Goal: N/A
Project: NH 2019(048)
Guaranty: N/A
Time: 734 WORKING DAYS
Engineer's Estimate: $57,517,759.76
Date: 10/03/2018 (7 years ago)
Contract Number: N/A
Type: REHABILITATION OF EXISTING HIGHWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$57,517,759.76
$48,720,816.80
Over/Under Est: -15.29% -$8,796,942.96
Over/Under Est: -11.79% -$6,783,351.42
Amt Left: 4.13% $2,013,591.54
$58,989,859.35
Over/Under Est: 2.56% $1,472,099.59
Amt Left: 21.08% $10,269,042.55
Delta: -16.27% -$8,255,451.01
$61,111,727.18
Over/Under Est: 6.25% $3,593,967.42
Amt Left: 25.43% $12,390,910.38
Delta: -3.60% -$2,121,867.83
Subcontractor Percentage Amount
BEAVER CONTRACTORS, LLC 10.34% $5,037,732.46
TERRA CONSTRUCTION LLC 4.83% $2,353,215.45
HIGHWAY BARRICADES AND SERVICES, LLC 1.28% $623,626.46
D&S TEXAS ICON CONSTRUCTION 1.27% $618,754.37
DEPENDABLE FENCE & WELDING CO. INC. 1.25% $609,010.21
BLACKTOP INDUSTRIES LLC 0.37% $180,267.02
EGGEMEYER LAND CLEARING, LLC 0.25% $121,802.04
RC CONTRACT SERVICES LLC 0.10% $48,720.82
TRAF-TEX, INC. 0.08% $38,976.65
SURFACE PREPARATION TECHNOLOGIES, LLC 0.07% $34,104.57
K. L. DURHAM CONSTRUCTION, L.L.C. 0.07% $34,104.57
FLASHER EQUIPMENT COMPANY 0.03% $14,616.25
CONCRETE CUTTING & PAVING, LLC 0.02% $9,744.16
FYL ENTERPRISES, LLC 0.01% $4,872.08
ACEE CONSTRUCTION LLC. 0.00% $0.00
J. CARROLL WEAVER, INC. 0.00% $0.00
Total: 19.97% $9,729,547.11

Bid Items & Bid Tabulations

133 Total 0 of 133
WEBB  |  US 83  |  LAREDO  |  0037-09-033  |  10/03/2018  |  $57,517,759.76  |  NH 2019(048)  |  REHAB OF EXIST HWY  |  734 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANDERSON COLUMBIA CO., INC.
ANGEL BROTHERS HOLDINGS CORP.
FNF CONSTRUCTION, INC.
HUNTER INDUSTRIES, LTD.
PREPARING ROW
STA 870.700 $414.350 $1,100.000 $3,600.000 $1,300.000 $1,646.550
PREPARING ROW (TREE)(10" TO 48" DIA)
EA 4.000 $500.000 $1,000.000 $1,000.000 $4,000.000 $5,375.400
REMOVING CONC (DRIVEWAYS)
SY 736.000 $23.350 $10.000 $10.000 $22.000 $19.020
RMV STAB BS & ASPH PAV(11.5"-22")
SY 449,073.000 $4.500 $5.500 $8.000 $9.250 $7.450
EXCAVATION (ROADWAY)
CY 34,528.000 $8.530 $8.000 $6.500 $4.500 $11.220
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 111,904.000 $7.830 $18.000 $12.000 $12.000 $11.220
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 144.900 $627.810 $625.000 $625.000 $620.000 $640.000
DRILL SEEDING (TEMP) (WARM)
AC 144.900 $493.890 $375.000 $375.000 $500.000 $500.000
PROOF ROLLING
HR 2,610.000 $95.000 $75.000 $40.000 $95.000 $62.700
LIME (HYD, COM, OR QK(SLURRY))
TON 7,804.000 $168.160 $170.000 $180.000 $181.000 $149.100
LIME TRT (SUBGRADE)(6")
SY 536,218.000 $2.000 $2.700 $1.300 $1.500 $0.910
CEM TRT(PLNT MX) (CL N)(TYE)(GR 4)(10")
SY 526,611.000 $12.240 $11.000 $11.000 $15.000 $14.380
PRIME COAT (MC-30)
GAL 101,961.000 $4.390 $3.300 $3.600 $5.000 $5.110
D-GR HMA TY-B PG64-22
TON 123.000 $84.000 $150.000 $115.000 $80.000 $143.100
SUPERPAVE MIXTURES SP- B SAC-B PG70-22
TON 115,021.000 $90.000 $70.000 $68.000 $71.000 $96.120
CONC PVMT (CONT REINF)(FAST TRK)(12")
SY 9,321.000 $75.000 $125.000 $130.000 $125.000 $131.250
CONC PVMT (JC) (TRANSITION SLAB)
SY 221.000 $125.000 $130.000 $135.000 $130.000 $136.500
STRUCT EXCAV
CY 597.000 $10.130 $8.000 $8.000 $10.400 $8.400
CEM STABIL BKFL
CY 991.000 $69.400 $80.000 $90.000 $100.000 $84.000
TEMPORARY SPL SHORING
SF 4,948.000 $35.000 $14.000 $15.000 $17.500 $14.700
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 52.000 $275.000 $246.000 $250.000 $15.000 $353.000
RIPRAP (CONC)(5 IN)
CY 263.000 $310.610 $400.000 $420.000 $500.000 $440.140
RIPRAP (STONE COMMON)(DRY)(8 IN)
CY 834.000 $201.900 $110.000 $115.000 $137.000 $115.500
RIPRAP (MOW STRIP)(4 IN)
CY 1,381.000 $414.030 $415.000 $440.000 $414.000 $456.640
RAIL (TY SSTR)
LF 270.000 $50.010 $128.500 $130.000 $156.000 $134.600
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 193.000 $1,109.740 $700.000 $720.000 $875.000 $733.940
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 138.000 $486.000 $800.000 $820.000 $1,000.000 $838.930
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 10.000 $437.500 $800.000 $820.000 $995.000 $835.780
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 74.000 $527.800 $850.000 $870.000 $1,060.000 $889.330
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 244.000 $1,063.410 $750.000 $750.000 $909.000 $763.330
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 28.000 $454.900 $800.000 $800.000 $975.000 $818.980
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 56.000 $537.600 $900.000 $910.000 $1,108.000 $930.280
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 6.000 $523.100 $1,150.000 $1,200.000 $1,435.000 $1,205.380
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 108.000 $717.000 $900.000 $920.000 $1,113.000 $934.480
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 10.000 $481.600 $800.000 $820.000 $995.000 $835.780
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 93.000 $618.000 $950.000 $1,000.000 $1,200.000 $997.480
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 272.000 $644.100 $850.000 $850.000 $1,040.000 $871.480
CONC BOX CULV (7 FT X 7 FT)(EXTEND)
LF 20.000 $767.400 $1,250.000 $1,250.000 $1,500.000 $1,270.470
CONC BOX CULV(5'X 6.5')
LF 12.000 $413.300 $1,000.000 $1,000.000 $1,200.000 $1,016.380
CONC BOX CULV (4 FT X 2.5 FT) (EXTEND)
LF 30.000 $550.000 $900.000 $900.000 $1,100.000 $923.980
CONC. BOX CULV (6.5 FT X 3 FT) (EXTEND)
LF 308.000 $700.000 $900.000 $880.000 $1,070.000 $896.680
RC PIPE (CL III)(24 IN)
LF 323.000 $60.580 $48.000 $50.000 $60.000 $50.400
WINGWALL (FW - 0) (HW=3 FT)
EA 15.000 $3,477.470 $9,000.000 $9,200.000 $1,200.000 $9,428.810
WINGWALL (FW - 0) (HW=4 FT)
EA 17.000 $6,624.550 $10,000.000 $10,000.000 $1,200.000 $10,090.300
WINGWALL (FW - 0) (HW=5 FT)
EA 6.000 $10,413.620 $10,500.000 $11,000.000 $13,000.000 $11,024.780
WINGWALL (FW - 0) (HW=6 FT)
EA 2.000 $8,731.780 $19,500.000 $21,000.000 $24,000.000 $20,474.590
WINGWALL (FW - 0) (HW=7 FT)
EA 3.000 $9,709.090 $33,500.000 $34,000.000 $42,000.000 $34,775.310
WINGWALL (FW - 0) (HW=8 FT)
EA 1.000 $13,580.000 $32,500.000 $33,000.000 $40,000.000 $33,704.330
WINGWALL (FW - S) (HW=3 FT)
EA 2.000 $3,533.330 $16,000.000 $16,000.000 $19,500.000 $16,337.670
WINGWALL (FW - S) (HW=4 FT)
EA 1.000 $11,184.620 $20,500.000 $21,000.000 $25,000.000 $21,251.580
WINGWALL (PW - 1) (HW=3 FT)
EA 2.000 $5,071.150 $12,000.000 $12,000.000 $14,600.000 $12,284.750
WINGWALL (PW - 1) (HW=4 FT)
EA 10.000 $11,483.690 $13,000.000 $13,500.000 $15,700.000 $13,240.240
WINGWALL (PW - 1) (HW=5 FT)
EA 6.000 $12,141.850 $15,000.000 $15,500.000 $18,300.000 $15,382.190
WINGWALL (PW - 1) (HW=6 FT)
EA 4.000 $12,251.700 $16,500.000 $17,000.000 $20,000.000 $16,799.660
WINGWALL (PW - 1) (HW=7 FT)
EA 3.000 $20,044.320 $21,500.000 $22,000.000 $26,000.000 $22,154.560
WINGWALL (PW - 1) (HW=8 FT)
EA 4.000 $23,346.750 $19,000.000 $19,500.000 $23,000.000 $19,672.410
WINGWALL (PW - 1) (HW=9 FT)
EA 3.000 $27,579.460 $31,000.000 $32,000.000 $38,000.000 $32,444.350
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $1,106.410 $1,000.000 $1,000.000 $1,250.000 $1,049.980
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 8.000 $1,114.410 $1,200.000 $1,200.000 $1,500.000 $1,259.970
REMOV STR (WINGWALL)
EA 78.000 $1,234.680 $1,100.000 $1,100.000 $1,300.000 $1,102.480
REMOV STR (HEADWALL)
EA 2.000 $1,083.920 $1,060.000 $1,100.000 $1,300.000 $1,102.480
REMOVE STR (RAIL)
LF 270.000 $155.000 $20.000 $20.000 $25.000 $21.540
MOBILIZATION
LS 1.000 $5,678,796.010 $4,655,000.000 $4,000,000.000 $5,808,000.000 $5,824,470.040
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 41.000 $6,000.000 $1,500.000 $8,000.000 $11,000.000 $2,382.580
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 2,426.000 $56.000 $42.000 $42.000 $54.000 $65.000
ROCK FILTER DAMS (REMOVE)
LF 2,426.000 $12.200 $16.000 $16.000 $20.000 $19.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,089.000 $20.930 $27.000 $22.000 $34.000 $12.500
CONSTRUCTION EXITS (REMOVE)
SY 1,089.000 $8.060 $16.000 $8.000 $20.000 $7.500
BACKHOE WORK (EROSION & SEDMT CONT)
HR 2,025.000 $88.260 $64.000 $50.000 $93.000 $68.400
TEMP SEDMT CONT FENCE (INSTALL)
LF 80,991.000 $2.400 $3.000 $3.000 $3.500 $2.350
TEMP SEDMT CONT FENCE (REMOVE)
LF 80,991.000 $0.800 $0.900 $0.850 $1.000 $0.800
CONSTRUCTING DETOURS
SY 151,458.000 $65.000 $26.000 $28.000 $53.000 $40.110
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 840.000 $45.000 $290.000 $65.000 $46.000 $79.800
ONE-WAY TRAF CONT (PILOT CAR)
HR 870.000 $85.000 $140.000 $85.000 $160.000 $91.200
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 26,790.000 $12.000 $10.000 $17.000 $13.000 $11.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 408,840.000 $8.000 $1.000 $2.500 $2.200 $8.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 26,790.000 $5.480 $10.000 $10.000 $10.500 $10.000
DRIVEWAYS (CONC)
SY 821.000 $87.790 $75.000 $82.000 $90.000 $96.830
DRIVEWAYS (ACP)
SY 649.000 $32.500 $44.000 $43.000 $61.000 $35.040
RUMBLE STRIPS (SHOULDER)
LF 173,879.000 $0.140 $0.150 $0.110 $0.110 $0.130
RUMBLE STRIPS (CENTERLINE)
LF 171,454.000 $0.210 $0.150 $0.110 $0.110 $0.130
MTL W-BEAM GD FEN (TIM POST)
LF 3,275.000 $20.930 $21.000 $22.000 $28.000 $24.150
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $1,729.120 $2,150.000 $2,400.000 $2,000.000 $1,909.500
REMOVE METAL BEAM GUARD FENCE
LF 6,172.000 $2.840 $2.000 $1.300 $6.000 $1.170
GUARDRAIL END TREATMENT (INSTALL)
EA 22.000 $2,511.240 $2,220.000 $2,500.000 $3,000.000 $2,734.410
GUARDRAIL END TREATMENT (REMOVE)
EA 16.000 $268.650 $260.000 $200.000 $300.000 $56.010
CRASH CUSH ATTEN (MOVE & RESET)
EA 298.000 $1,750.000 $600.000 $1,000.000 $500.000 $765.840
CRASH CUSH ATTEN (REMOVE)
EA 58.000 $900.000 $6,500.000 $500.000 $600.000 $239.320
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 58.000 $10,000.000 $240.000 $7,000.000 $4,500.000 $6,598.230
ZINC-COAT STL WIRE STRAND (5/16")
LF 200.000 $4.900 $2.000 $1.900 $3.100 $6.750
ALUMINUM SIGNS (TY G)
SF 194.000 $40.580 $60.000 $23.000 $32.000 $22.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 49.000 $571.060 $410.000 $460.000 $650.000 $455.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 38.000 $611.470 $450.000 $530.000 $750.000 $523.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $963.000 $605.000 $820.000 $940.000 $817.000
REMOVE SM RD SN SUP&AM
EA 67.000 $79.750 $76.000 $80.000 $100.000 $85.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 90.000 $71.580 $76.000 $75.000 $100.000 $72.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 10,210.000 $0.250 $0.250 $0.260 $0.300 $0.250
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 808,144.000 $0.200 $0.220 $0.230 $0.250 $0.220
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 2,327.000 $0.600 $0.500 $0.520 $0.520 $0.500
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 140.000 $10.000 $2.500 $2.500 $3.000 $2.500
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 808,144.000 $0.200 $0.220 $0.230 $0.250 $0.220
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 3,555.000 $0.620 $0.250 $0.260 $0.250 $0.250
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,160.000 $0.790 $0.600 $0.600 $0.610 $0.600
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 102.000 $8.660 $4.000 $3.000 $3.200 $3.000
REFL PAV MRK TY II (W) (LNDP ARW)
EA 16.000 $1.840 $130.000 $130.000 $127.000 $125.000
PAVEMENT SEALER 4"
LF 361,780.000 $0.130 $0.120 $0.120 $0.130 $0.120
PAVEMENT SEALER 8"
LF 2,160.000 $0.280 $0.300 $0.270 $0.270 $0.260
PAVEMENT SEALER 24"
LF 102.000 $1.170 $1.000 $0.900 $1.000 $0.900
PAVEMENT SEALER (ARROW)
EA 12.000 $35.810 $11.000 $10.000 $11.000 $10.000
PAVEMENT SEALER (WORD)
EA 12.000 $37.930 $11.000 $10.000 $11.000 $10.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 10,810.000 $0.370 $0.300 $0.310 $0.310 $0.300
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 173,879.000 $0.320 $0.300 $0.280 $0.280 $0.270
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 173,879.000 $0.320 $0.300 $0.280 $0.280 $0.270
PREFAB PAV MRK TY C (W) (ARROW)
EA 12.000 $233.930 $225.000 $230.000 $230.000 $225.000
PREFAB PAV MRK TY C (W) (WORD)
EA 12.000 $262.860 $330.000 $330.000 $330.000 $325.000
REFL PAV MRKR TY I-C
EA 1,144.000 $2.540 $3.600 $3.500 $3.600 $3.500
ELIM EXT PAV MRK & MRKS (4")
LF 87,018.000 $0.500 $0.400 $0.400 $0.410 $0.400
PAV SURF PREP FOR MRK (4")
LF 361,780.000 $0.100 $0.010 $0.010 $0.010 $0.010
PAV SURF PREP FOR MRK (8")
LF 2,160.000 $0.150 $0.020 $0.020 $0.020 $0.020
PAV SURF PREP FOR MRK (24")
LF 102.000 $1.920 $0.600 $0.600 $0.610 $0.600
PAV SURF PREP FOR MRK (RPM)
EA 1,144.000 $0.380 $0.010 $0.010 $0.010 $0.010
INSTALL HWY TRF SIG (FLASH BEACON)
EA 2.000 $6,000.000 $6,700.000 $6,900.000 $3,100.000 $2,400.000
VEH SIG SEC (12")LED(YEL)
EA 8.000 $225.000 $255.000 $270.000 $260.000 $395.000
VEH SIG SEC (12")LED(RED)
EA 4.000 $225.000 $255.000 $270.000 $260.000 $395.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 100.000 $1.350 $1.900 $1.900 $1.300 $4.600
TRF SIG CBL (TY A)(12 AWG)(3 CONDR)
LF 350.000 $2.000 $2.000 $2.100 $1.300 $4.800
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 2.000 $25,000.000 $4,400.000 $4,500.000 $6,100.000 $5,300.000
INS TRF SIG PL AM (S)STR(TY B)
EA 4.000 $3,500.000 $650.000 $660.000 $6,100.000 $4,200.000
FULL - WIDTH MOWING
AC 139.000 $172.600 $200.000 $100.000 $150.000 $55.000
BONDING COURSESE
GAL 50,009.000 $3.000 $3.800 $3.200 $5.000 $5.110
SUPERPAVE MIX BMD SP-C SAC-A PG76-22
TON 86,266.000 $83.630 $96.000 $95.000 $98.000 $116.070
PORTABLE CHANGEABLE MESSAGE SIGN
EA 5.000 $10,500.000 $15,000.000 $10,000.000 $25,000.000 $7,577.550
TMA (STATIONARY)
EA 3.000 $6,414.830 $77,000.000 $15,000.000 $230,000.000 $10,103.400
Totals: $57,517,759.765 $48,720,816.800 $50,734,408.340 $58,989,859.350 $61,111,727.185