Show Job Controls
Bid Cobra

WEBB IH 35 (0018-06-212)

Items: 52

County: WEBB
Length: N/A
Highway: IH 35
District: LAREDO
Control Number: 0018-06-212
DBE Goal: N/A
Project: C 18-6-212
Guaranty: N/A
Time: 315 WORKING DAYS
Engineer's Estimate: $31,488,480.95
Date: 02/01/2023 (3 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
ANTONIO REYNA1
ALBERTO CHAVEZ
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$31,488,480.95
$29,750,032.69
Over/Under Est: -5.52% -$1,738,448.26
Over/Under Est: 0.31% $96,986.69
Amt Left: 6.17% $1,835,434.95
$40,022,446.45
Over/Under Est: 27.1% $8,533,965.50
Amt Left: 34.53% $10,272,413.76
Delta: -26.71% -$8,436,978.81
Subcontractor Percentage Amount
K. L. DURHAM CONSTRUCTION, L.L.C. 2.46% $755,482.62
RPV CONSTRUCTION, LLC 1.72% $528,223.62
HIGHWAY BARRICADES AND SERVICES, LLC 1.26% $386,954.51
TEXAS ICON CONSTRUCTION, LLC 1.26% $386,954.51
CHEROKEE SERVICES 0.37% $113,629.50
SURFACE PREPARATION TECHNOLOGIES, LLC 0.13% $39,923.88
TRP CONSTRUCTION GROUP, LLC 0.01% $3,071.07
Total: 7.21% $2,214,239.71

Bid Items & Bid Tabulations

52 Total 0 of 52
WEBB  |  IH 35  |  LAREDO  |  0018-06-212  |  02/01/2023  |  $31,488,480.95  |  C 18-6-212  |  RESURF ROADWAY  |  315 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANDERSON COLUMBIA CO., INC.
TEXAS MATERIALS GROUP, INC.
HUNTER INDUSTRIES, LTD.
BACKFILL (TY B)
STA 1,761.370 $124.000 $100.000 $135.000 $157.500
BLADING
HR 120.000 $160.000 $180.000 $150.000 $140.400
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 42,058.000 $35.320 $28.000 $35.000 $55.930
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 17,086.000 $55.000 $47.000 $58.000 $88.340
PLANE ASPH CONC PAV(4" TO 6")
SY 32,955.000 $4.000 $3.600 $4.550 $6.710
PLANE ASPH CONC PAV (3")
SY 916,212.000 $1.300 $1.700 $1.650 $2.390
PLANE ASPH CONC PAV (0" TO 5.5")
SY 3,697.000 $7.000 $4.000 $4.000 $7.790
PLANE ASPH CONC PAV(MICRO)(0"-3")
SY 8,447.000 $8.000 $8.000 $3.750 $4.550
RIPRAP (MOW STRIP)(4 IN)
CY 727.000 $650.000 $535.000 $625.000 $700.000
CLEANING AND SEALING EXISTING JOINTS
LF 4,098.000 $35.000 $31.000 $32.000 $36.000
RETROFIT RAIL (ADD HSS)
LF 2,729.740 $110.000 $110.000 $105.000 $120.000
MOBILIZATION
LS 1.000 $2,334,076.810 $1,597,000.000 $1,892,829.000 $3,386,174.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $4,000.000 $1,500.000 $2,500.000 $1,919.460
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 280.000 $150.000 $75.000 $75.000 $128.700
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 414,924.000 $0.150 $0.100 $0.150 $0.120
MTL W-BEAM GD FEN (TIM POST)
LF 2,175.000 $28.050 $28.000 $23.750 $26.240
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 17.000 $2,000.000 $2,100.000 $2,350.000 $3,259.660
MTL W-BEAM GD FEN ADJUSTMENT
LF 450.000 $28.050 $15.000 $13.000 $14.360
MTL THRIE-BEAM GD FEN ADJUSTMENT
LF 4.000 $130.000 $900.000 $500.000 $552.480
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 6.000 $1,280.000 $1,400.000 $1,150.000 $1,270.710
DOWNSTREAM ANCHOR TERMINAL ADJUSTMENT
EA 2.000 $125.000 $400.000 $400.000 $441.990
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 2.000 $950.000 $800.000 $550.000 $607.730
REMOVE METAL BEAM GUARD FENCE
LF 2,150.000 $2.400 $2.000 $1.500 $1.660
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $250.000 $180.000 $150.000 $165.750
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $450.000 $180.000 $100.000 $110.500
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 14.000 $260.000 $210.000 $100.000 $110.500
GUARDRAIL END TREATMENT (INSTALL)
EA 32.000 $2,900.000 $3,100.000 $2,795.000 $3,088.390
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 2.000 $1,250.000 $825.000 $500.000 $552.480
GUARDRAIL END TREATMENT (REMOVE)
EA 32.000 $300.000 $270.000 $200.000 $220.990
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 23.000 $40.000 $48.000 $35.000 $35.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 2.000 $50.000 $48.000 $35.000 $35.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 33,671.000 $1.500 $1.500 $1.200 $1.600
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 507.000 $2.000 $0.850 $0.850 $0.850
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 10,550.000 $1.100 $1.250 $1.250 $1.250
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 3,616.000 $4.000 $2.850 $2.850 $2.850
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 3.000 $155.000 $175.000 $175.000 $175.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 18.000 $172.000 $225.000 $225.000 $225.000
PAVEMENT SEALER 6"
LF 15,704.000 $0.200 $0.350 $0.350 $0.350
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 67,265.000 $0.700 $0.570 $0.570 $0.570
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 214,253.000 $0.400 $0.550 $0.550 $0.550
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 222,010.000 $0.400 $0.550 $0.550 $0.550
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
LF 1,163.000 $4.550 $2.850 $2.850 $2.850
REFL PAV MRKR TY II-C-R
EA 3,582.000 $4.250 $3.850 $3.850 $3.850
ELIM EXT PAV MRK & MRKS (4")
LF 14,320.000 $0.450 $0.500 $0.500 $0.500
PAV SURF PREP FOR MRK (6")
LF 14,871.000 $0.200 $0.040 $0.040 $0.040
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
TON 167,569.000 $129.000 $124.000 $128.500 $155.340
BONDING COURSE
GAL 194,283.000 $2.500 $2.250 $3.300 $2.280
POLYESTER POLYMER CONC OVERLAY (1")
SY 9,058.000 $120.000 $138.000 $142.000 $175.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $9,900.000 $20,200.000 $8,000.000 $7,500.000
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $12,000.000 $8,640.000 $14,500.000 $8,500.000
TMA (STATIONARY)
DAY 287.000 $250.000 $168.000 $175.000 $200.000
TMA (MOBILE OPERATION)
HR 1,380.000 $70.000 $56.000 $80.000 $75.000
Totals: $31,488,480.950 $29,750,032.690 $31,585,467.640 $40,022,446.455