Items: 50

County: WEBB
Length: N/A
Highway: IH 35
District: LAREDO
Control Number: 0018-05-104
DBE Goal: N/A
Project: C 18-5-104
Guaranty: N/A
Time: 245 WORKING DAYS
Engineer's Estimate: $13,692,540.88
Date: 02/04/2022 (4 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (2)
E
Engineer's Estimate
$13,692,540.88
$14,045,933.92
Over/Under Est: 2.58% $353,393.04
Over/Under Est: 8.34% $1,141,985.43
Amt Left: 5.61% $788,592.39
Subcontractor Percentage Amount
K. L. DURHAM CONSTRUCTION, L.L.C. 3.72% $522,508.74
PINNACLE GRINDING AND GROOVING LLC 1.30% $182,597.14
JP INFRASTRUCTURE, LLC 1.05% $147,482.31
LONGHORN SERVICES, INC 0.67% $94,107.76
RC CONTRACT SERVICES LLC 0.59% $82,871.01
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 0.59% $82,871.01
TRP CONSTRUCTION GROUP, LLC 0.33% $46,351.58
TEXAS ICON CONSTRUCTION, LLC 0.26% $36,519.43
CHEROKEE SERVICES 0.24% $33,710.24
HIGHWAY BARRICADES AND SERVICES, LLC 0.17% $23,878.09
SURFACE PREPARATION TECHNOLOGIES, LLC 0.03% $4,213.78
Total: 8.95% $1,257,111.09

Bid Items & Bid Tabulations

50 Total 0 of 50
WEBB  |  IH 35  |  LAREDO  |  0018-05-104  |  02/04/2022  |  $13,692,540.88  |  C 18-5-104  |  RESURF ROADWAY  |  245 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANDERSON COLUMBIA CO., INC.
TEXAS MATERIALS GROUP, INC.
BACKFILL (TY A)
STA 1,022.000 $150.000 $90.000 $125.000
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
TON 48,570.000 $105.000 $118.000 $123.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 21,819.000 $115.000 $119.000 $123.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 29,395.000 $25.000 $35.000 $33.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 16,309.000 $33.000 $40.000 $40.000
PLANE ASPH CONC PAV (2")
SY 293,943.000 $1.750 $1.200 $1.950
PLANE ASPH CONC PAV (3")
SY 281,557.000 $2.300 $1.800 $2.150
RIPRAP (MOW STRIP)(4 IN)
CY 62.000 $450.000 $470.000 $825.000
CLEANING AND SEALING EXISTING JOINTS
LF 1,438.000 $25.000 $25.000 $25.000
MOBILIZATION
LS 1.000 $1,205,339.510 $857,000.000 $815,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $5,000.000 $2,200.000 $8,500.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,280.000 $4.300 $6.500 $9.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,280.000 $1.030 $1.300 $1.000
RUMBLE STRIPS (SHOULDER)
LF 100,002.000 $0.200 $0.060 $0.260
MTL W-BEAM GD FEN (TIM POST)
LF 1,025.000 $25.000 $30.000 $27.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $2,000.000 $3,000.000 $1,950.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 7.000 $1,300.000 $1,500.000 $1,650.000
MTL BM GD FEN TRANS (NON - SYM)
EA 3.000 $800.000 $960.000 $950.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 2.000 $750.000 $440.000 $1,550.000
REMOVE METAL BEAM GUARD FENCE
LF 775.000 $2.600 $1.000 $1.500
REMOVE TERMINAL ANCHOR SECTION
EA 53.000 $200.000 $180.000 $195.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 1.000 $270.000 $290.000 $195.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,700.000 $3,650.000 $3,350.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $300.000 $290.000 $195.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 2.000 $21.000 $42.000 $10.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 2.000 $10.000 $42.000 $10.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 4.000 $15.000 $16.000 $10.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 31.000 $190.000 $115.000 $93.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 26,919.000 $0.500 $2.000 $0.850
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 812.000 $1.000 $0.800 $0.750
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,017.000 $0.850 $1.000 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,172.000 $5.000 $4.400 $4.150
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 134.000 $125.000 $105.000 $100.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 69.000 $144.000 $120.000 $115.000
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
EA 31.000 $302.000 $120.000 $115.000
REFL PAV MRK TY I (W)(BIKE ARW)(100MIL)
EA 18.000 $120.000 $84.000 $80.000
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
EA 36.000 $170.000 $100.000 $95.000
PAVEMENT SEALER 4"
LF 11,699.000 $0.120 $0.200 $0.200
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
LF 52,187.000 $0.520 $0.500 $0.490
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
LF 52,187.000 $0.520 $0.500 $0.490
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 79,101.000 $0.400 $0.400 $0.340
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 44,855.000 $0.450 $0.400 $0.340
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 79,101.000 $0.350 $0.400 $0.340
REFL PAV MRKR TY I-C
EA 2,474.000 $3.600 $4.000 $3.500
SP MIXES SP-C SAC-A PG76-22
TON 11,985.000 $111.000 $112.000 $111.000
BONDING COURSE
GAL 115,102.000 $3.000 $1.800 $3.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $7,500.000 $25,700.000 $9,000.000
LONG CHANNEL MOUNT CURB SYS (RELOCATE)
LF 1,089.000 $70.090 $75.000 $80.000
TMA (STATIONARY)
DAY 360.000 $138.000 $210.000 $135.000
TMA (MOBILE OPERATION)
HR 600.000 $50.000 $60.000 $60.000
Totals: $13,692,540.880 $14,045,933.920 $14,834,526.310