Show Job Controls
Bid Cobra

WASHINGTON SH0036 (6469-98-001)

Items: 48

County: WASHINGTON
Length: N/A
Highway: SH0036
District: BRYAN
Control Number: 6469-98-001
DBE Goal: 0.0%
Project: RMC - 646998001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $651,400.00
Date: 08/01/2024 (1 year ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
MICHAEL ESTILLETTE
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$651,400.00
$400,151.00
Over/Under Est: -38.57% -$251,249.00
Over/Under Est: -34.43% -$224,290.00
Amt Left: 6.74% $26,959.00
Over/Under Est: -21.53% -$140,215.00
Amt Left: 27.75% $111,034.00
Delta: -19.68% -$84,075.00
Over/Under Est: -7.92% -$51,610.00
Amt Left: 49.89% $199,639.00
Delta: -17.33% -$88,605.00
Over/Under Est: 5.32% $34,625.00
Amt Left: 71.44% $285,874.00
Delta: -14.38% -$86,235.00
Over/Under Est: 5.78% $37,635.00
Amt Left: 72.19% $288,884.00
Delta: -0.44% -$3,010.00
$1,215,026.00
Over/Under Est: 86.53% $563,626.00
Amt Left: 203.64% $814,875.00
Delta: -76.34% -$525,991.00

Bid Items & Bid Tabulations

48 Total 0 of 48
WASHINGTON  |  SH0036  |  BRYAN  |  6469-98-001  |  08/01/2024  |  $651,400.00  |  RMC - 646998001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
T&L CLEANING SERVICES LLC
BK FIELD OPERATIONS LLC
ROSS SA ENTERPRISE LLC
HAZMAT INTERNATIONAL, INC.
GARRET SHIELDS INFRASTRUCTURE
AAD CONTRACTING INC.
ISI CONTRACTING, INC.
RIPRAP (MOW STRIP)(4 IN)
CY 5.000 $700.000 $200.000 $300.000 $350.000 $500.000 $400.000 $100.000 $571.000
MOBILIZATION (CALLOUT)
EA 30.000 $500.000 $1.000 $3,000.000 $1,000.000 $750.000 $1,000.000 $2,500.000 $714.000
MTL W-BEAM GD FEN (TIM POST)
LF 2,250.000 $35.000 $24.000 $14.000 $20.000 $24.000 $24.000 $28.000 $45.000
MTL W-BEAM GD FEN (STEEL POST)
LF 50.000 $35.000 $30.000 $20.000 $30.000 $30.000 $30.000 $30.000 $51.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $2,300.000 $1,500.000 $1,500.000 $1,200.000 $1,350.000 $1,200.000 $1,000.000 $4,463.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 50.000 $60.000 $1.000 $1.000 $10.000 $10.000 $25.000 $1.000 $28.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,700.000 $1,200.000 $1,100.000 $1,500.000 $1,800.000 $2,000.000 $1,800.000 $2,590.000
REMOVE METAL BEAM GUARD FENCE
LF 1,900.000 $4.000 $0.010 $5.000 $0.100 $0.250 $1.000 $2.000 $9.400
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $240.000 $1.000 $1.000 $100.000 $300.000 $200.000 $100.000 $612.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $175.000 $1.000 $1.000 $125.000 $200.000 $500.000 $50.000 $1,521.000
GUARDRAIL END TREATMENT (INSTALL)
EA 20.000 $3,300.000 $1,000.000 $1,500.000 $2,000.000 $2,900.000 $2,800.000 $3,900.000 $4,461.000
GUARDRAIL END TREATMENT (REMOVE)
EA 15.000 $370.000 $1.000 $100.000 $100.000 $50.000 $100.000 $100.000 $612.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 4,000.000 $30.000 $24.000 $9.000 $24.000 $22.000 $40.000 $17.000 $39.300
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 15.000 $30.000 $20.000 $15.000 $50.000 $30.000 $40.000 $15.000 $31.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 20.000 $85.000 $20.000 $25.000 $50.000 $45.000 $100.000 $25.000 $70.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 50.000 $42.000 $25.000 $12.000 $30.000 $25.000 $30.000 $30.000 $1,303.000
RAISE RAIL ELEMENT
LF 450.000 $5.500 $1.000 $5.000 $5.000 $15.000 $10.000 $2.000 $12.000
REM / REPL TIMBER POST W / O CONC FND
EA 150.000 $80.000 $20.000 $100.000 $100.000 $100.000 $100.000 $55.000 $64.000
REM / REPL STEEL POST W / O CONC FND
EA 25.000 $90.000 $25.000 $5.000 $100.000 $88.000 $60.000 $55.000 $108.000
REM / REPL TIMBER POST W / CONC FND
EA 30.000 $100.000 $20.000 $100.000 $100.000 $100.000 $100.000 $55.000 $164.000
REM / REPL STEEL POST W / CONC FND
EA 5.000 $100.000 $25.000 $5.000 $100.000 $88.000 $100.000 $55.000 $164.000
REPAIR STEEL POST WITH BASE PLATE
EA 5.000 $190.000 $200.000 $5.000 $100.000 $1.000 $300.000 $50.000 $715.000
REALIGN POSTS
EA 300.000 $30.000 $5.000 $1.000 $1.000 $5.000 $5.000 $20.000 $21.100
REMOVE & REPLACE BLOCKOUT
EA 70.000 $140.000 $10.000 $100.000 $100.000 $300.000 $200.000 $25.000 $30.000
REPLACE STL BLOCKOUTS W /WOOD BLOCKOUTS
EA 25.000 $22.000 $10.000 $1.000 $50.000 $1.000 $15.000 $25.000 $30.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 125.000 $60.000 $30.000 $30.000 $50.000 $45.000 $40.000 $39.000 $55.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 40.000 $150.000 $30.000 $20.000 $50.000 $85.000 $30.000 $80.000 $67.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 25.000 $4,250.000 $4,500.000 $4,000.000 $4,250.000 $4,000.000 $4,000.000 $3,900.000 $5,975.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 10.000 $950.000 $1,000.000 $700.000 $825.000 $1,200.000 $1,000.000 $1,400.000 $1,928.000
REM & RESET SGT IMPACT HEAD
EA 10.000 $275.000 $1.000 $1.000 $100.000 $150.000 $100.000 $200.000 $511.000
REPLACE SGT CABLE ASSEMBLY
EA 10.000 $65.000 $1.000 $1.000 $1.000 $100.000 $50.000 $80.000 $243.000
REPLACE SGT CABLE ANCHOR
EA 10.000 $30.000 $1.000 $1.000 $1.000 $100.000 $50.000 $80.000 $156.000
REPLACE SGT STRUT
EA 10.000 $45.000 $1.000 $1.000 $1.000 $100.000 $50.000 $20.000 $149.000
REPLACE SGT OBJECT MARKER
EA 10.000 $45.000 $30.000 $1.000 $1.000 $30.000 $10.000 $20.000 $44.000
REMOVE AND REPLACE DAT
EA 10.000 $1,300.000 $1,200.000 $1,000.000 $1,000.000 $1,400.000 $1,000.000 $1,400.000 $2,590.000
REPLACE POSTS (TL-4)
EA 250.000 $180.000 $150.000 $80.000 $250.000 $250.000 $130.000 $250.000 $298.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 10.000 $435.000 $150.000 $10.000 $50.000 $1.000 $200.000 $200.000 $695.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 10.000 $350.000 $1.000 $5.000 $50.000 $1.000 $10.000 $25.000 $663.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 10.000 $1,500.000 $1,000.000 $2,500.000 $2,500.000 $500.000 $1,000.000 $2,500.000 $8,626.000
REPLACE CABLE (TL-4)
LF 200.000 $6.000 $0.010 $0.100 $4.000 $1.000 $10.000 $4.000 $19.000
CHECK / RE-TENSION CABLE
EA 25.000 $200.000 $1.000 $1.000 $500.000 $300.000 $100.000 $400.000 $763.400
REPLACE POST HARDWARE (TL-4)
EA 100.000 $15.000 $10.000 $1.000 $25.000 $100.000 $30.000 $35.000 $168.000
REPAIR (NARROW REACT 350)
LF 50.000 $500.000 $50.000 $100.000 $100.000 $140.000 $1,000.000 $600.000 $162.000
REPAIR (WIDE QUAD)
EA 2.000 $2,200.000 $500.000 $2,500.000 $500.000 $2,000.000 $10,000.000 $5,000.000 $1,841.000
REPAIR (QUADGUARD)(MASH)(N)
EA 2.000 $2,400.000 $500.000 $2,500.000 $100.000 $3,000.000 $10,000.000 $5,000.000 $1,251.000
REPAIR (TAU)(MASH)(N)
EA 2.000 $2,000.000 $500.000 $1,000.000 $100.000 $3,000.000 $10,000.000 $20,000.000 $1,251.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 10.000 $180.000 $150.000 $1.000 $1.000 $25.000 $50.000 $1.000 $700.000
TMA (STATIONARY)
DAY 70.000 $300.000 $100.000 $1.000 $1.000 $750.000 $300.000 $400.000 $3,000.000
Totals: $651,400.000 $400,151.000 $427,110.000 $511,185.000 $599,790.000 $686,025.000 $689,035.000 $1,215,026.000