Job Info for 6422-65-001

County: WASHINGTON Highway: SH0036 Date: 12/01/2022 (1 year ago) Engineer's Estimate: $753,000 Control Number: 6422-65-001
Project: MMC - 642265001 District: BRYAN Time: 180 CALENDAR DAYS Type: HOT MIX

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $753,000.00
TEXAS MATERIALS GROUP, INC.   $697,400.00 1
-7.38% | -$55,600.00
KNIFE RIVER CORPORATION - SOUTH   $709,630.00 2
-5.76% | -$43,370.00
1.75% | $12,230.00
JAMES CONSTRUCTION GROUP, LLC   $709,800.00 3
-5.74% | -$43,200.00
1.78% | $12,400.00
0.02% | $170.00
WALLER COUNTY ASPHALT INC.   $710,800.00 4
-5.6% | -$42,200.00
1.92% | $13,400.00
0.14% | $1,000.00
BIG CREEK CONSTRUCTION, LTD.   $716,000.00 5
-4.91% | -$37,000.00
2.67% | $18,600.00
0.73% | $5,200.00
VULCAN CONSTRUCTION MATERIALS, LLC   $741,200.00 6
-1.57% | -$11,800.00
6.28% | $43,800.00
3.52% | $25,200.00
BRAZOS PAVING, INC.   $744,400.00 7
-1.14% | -$8,600.00
6.74% | $47,000.00
0.43% | $3,200.00

Bid Items

Items: 2, 0 filtered
WASHINGTON SH0036  |  BRYAN  |  6422-65-001  |  12/01/2022  |  $753,000  |  MMC - 642265001  |  HOT MIX  |  180 CALENDAR DAYS
Item code Description Unit Quantity Engineer's Estimate TEXAS MATERIALS GROUP, INC. KNIFE RIVER CORPORATION - SOUTH JAMES CONSTRUCTION GROUP, LLC WALLER COUNTY ASPHALT INC. BIG CREEK CONSTRUCTION, LTD. VULCAN CONSTRUCTION MATERIALS, LLC BRAZOS PAVING, INC.
8011 6001 D-GR HMA(SQ) TY D PG 64-22 (PICKUP) TON 200.000 $90.000 $85.000 $80.000 $84.000 $89.000 $80.000 $83.500 $82.000
8011 6002 D-GR HMA(SQ) TY D PG 64-22 (DELIVERY) TON 7,000.000 $105.000 $97.200 $99.090 $99.000 $99.000 $100.000 $103.500 $104.000
Totals: $753,000.00 $697,400.00 $709,630.00 $709,800.00 $710,800.00 $716,000.00 $741,200.00 $744,400.00