WASHINGTON US0290 (6332-48-001)

Items: 49

County: WASHINGTON
Length: N/A
Highway: US0290
District: BRYAN
Control Number: 6332-48-001
DBE Goal: N/A
Project: RMC - 633248001
Guaranty: N/A
Time: 731 CALENDAR DAYS
Engineer's Estimate: $692,330.00
Date: 08/07/2018 (7 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (1)
E
Engineer's Estimate
$692,330.00
$883,851.50
Over/Under Est: 27.66% $191,521.50

Bid Items & Bid Tabulations

49 Total 0 of 49
WASHINGTON  |  US0290  |  BRYAN  |  6332-48-001  |  08/07/2018  |  $692,330.00  |  RMC - 633248001  |  METAL BEAM GUARD FENCE REPAIR  |  731 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ISI CONTRACTING, INC.
RIPRAP (MOW STRIP)(4 IN)
CY 25.000 $750.000 $600.000
MOBILIZATION (CALLOUT)
EA 50.000 $300.000 $500.000
MTL W-BEAM GD FEN (TIM POST)
LF 500.000 $22.500 $19.000
MTL W-BEAM GD FEN (STEEL POST)
LF 250.000 $22.500 $45.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $2,000.000 $2,400.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 250.000 $6.000 $9.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $4.000 $1.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $200.000 $1.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $200.000 $110.000
GUARDRAIL END TREATMENT (INSTALL)
EA 50.000 $2,400.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 50.000 $250.000 $230.000
GUARDRAIL END TRTMNT(RETRO)(STEEL POST)
EA 10.000 $1,000.000 $3,000.000
GUARDRAIL END TRTMNT(RETRO)(WOOD POST)
EA 10.000 $1,000.000 $3,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 100.000 $21.000 $12.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BR)
EA 25.000 $21.000 $12.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 25.000 $21.000 $12.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1 (BR)
EA 25.000 $21.000 $12.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 6,000.000 $15.000 $14.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 25.000 $10.000 $2.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 25.000 $10.000 $2.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 50.000 $18.000 $20.000
RAISE RAIL ELEMENT
LF 500.000 $5.000 $7.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 500.000 $40.000 $36.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 40.000 $50.000 $45.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $100.000 $125.000
REALIGN POSTS
EA 200.000 $12.000 $6.000
REMOVE & REPLACE BLOCKOUT
EA 200.000 $10.000 $14.000
REPLACE STL BLOCKOUTS W /WOOD BLOCKOUTS
EA 100.000 $10.000 $12.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,000.000 $20.000 $27.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 50.000 $55.000 $40.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 8.000 $60.000 $7.000
REPLACE TERMINAL ANCHOR POSTS
EA 8.000 $75.000 $7.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 50.000 $2,500.000 $3,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 20.000 $1,000.000 $925.000
REM & RESET SGT IMPACT HEAD
EA 25.000 $150.000 $110.000
REPLACE SGT CABLE ASSEMBLY
EA 20.000 $100.000 $100.000
REPLACE SGT CABLE ANCHOR
EA 20.000 $80.000 $100.000
REPLACE SGT STRUT
EA 20.000 $90.000 $150.000
REPLACE SGT OBJECT MARKER
EA 20.000 $30.000 $28.000
REPLACE POSTS (TL-4)
EA 1,000.000 $90.000 $150.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 50.000 $125.000 $500.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 50.000 $50.000 $30.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 50.000 $500.000 $888.490
REPLACE CABLE (TL-4)
LF 1,000.000 $1.000 $3.000
REPLACE POST HARDWARE (TL-4)
EA 100.000 $35.000 $25.000
REPAIR (BEAT - SSCC)
EA 2.000 $2,200.000 $500.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 50.000 $80.000 $90.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 20.000 $125.000 $50.000
TMA (STATIONARY)
DAY 100.000 $300.000 $285.000
Totals: $692,330.000 $883,851.500