Show Job Controls
Bid Cobra

WASHINGTON CS (0917-19-050)

Items: 34

County: WASHINGTON
Length: N/A
Highway: CS
District: BRYAN
Control Number: 0917-19-050
DBE Goal: N/A
Project: BR 2017(904)
Guaranty: N/A
Time: 69 WORKING DAYS
Engineer's Estimate: $359,348.50
Date: 06/06/2018 (7 years ago)
Contract Number: N/A
Type: REPLACE EXISTING BRIDGE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$359,348.50
1
$341,287.96
Over/Under Est: -5.03% -$18,060.54
Over/Under Est: 7.22% $25,934.00
Amt Left: 12.89% $43,994.54
Over/Under Est: 9.25% $33,226.00
Amt Left: 15.03% $51,286.54
Delta: -1.89% -$7,292.00
Over/Under Est: 13.09% $47,053.25
Amt Left: 19.08% $65,113.79
Delta: -3.52% -$13,827.25
Over/Under Est: 17.12% $61,512.30
Amt Left: 23.32% $79,572.84
Delta: -3.56% -$14,459.05
Over/Under Est: 21.26% $76,394.50
Amt Left: 27.68% $94,455.04
Delta: -3.54% -$14,882.20
Over/Under Est: 28.1% $100,985.00
Amt Left: 34.88% $119,045.54
Delta: -5.64% -$24,590.50

Bid Items & Bid Tabulations

34 Total 0 of 34
WASHINGTON  |  CS  |  BRYAN  |  0917-19-050  |  06/06/2018  |  $359,348.50  |  BR 2017(904)  |  REPLACE EXIST BRIDGE  |  69 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TREVWAY, INC.
TALBRAN ENTERPRISES LLC
ELLIS-MCGINNIS CONSTRUCTION CO.
FUQUA CONSTRUCTION CO., INC.
HILL COUNTRY BRIDGE, INC.
FORDE CONSTRUCTION COMPANY, INC.
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 3.600 $2,000.000 $1,000.000 $1,200.000 $4,500.000 $1,617.390 $3,380.000 $1,200.000 $10,000.000
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 1.000 $750.000 $1,000.000 $1,000.000 $1,300.000 $1,000.000 $2,515.000 $3,400.000 $1,000.000
EXCAVATION (ROADWAY)
CY 218.000 $17.000 $9.000 $35.000 $12.000 $15.000 $20.500 $13.000 $30.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 318.000 $20.000 $9.000 $35.000 $20.000 $30.000 $15.100 $21.000 $30.000
FURNISHING AND PLACING TOPSOIL (4")
SY 539.000 $2.000 $4.800 $1.500 $2.000 $0.500 $6.750 $7.000 $1.500
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 539.000 $1.000 $1.000 $1.000 $2.500 $2.490 $8.800 $2.000 $1.000
CELL FBR MLCH SEED(TEMP)(WARM)
SY 270.000 $1.000 $1.000 $1.000 $1.000 $2.490 $2.600 $2.000 $1.000
CELL FBR MLCH SEED(TEMP)(COOL)
SY 270.000 $1.000 $1.000 $1.000 $5.000 $2.490 $2.600 $2.000 $1.000
VEGETATIVE WATERING
MG 71.000 $30.000 $25.000 $40.000 $42.000 $15.000 $10.000 $100.000 $50.000
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
SY 947.000 $17.000 $18.000 $15.000 $15.000 $12.500 $20.000 $18.000 $20.000
CEM STABIL BKFL
CY 70.000 $125.000 $150.000 $80.000 $190.000 $125.000 $181.000 $125.000 $180.000
DRILL SHAFT (36 IN)
LF 234.000 $200.000 $191.000 $217.000 $275.000 $273.720 $188.000 $220.000 $225.000
CL C CONC (ABUT)
CY 37.600 $863.000 $445.000 $800.000 $980.000 $1,000.000 $730.000 $1,100.000 $900.000
REINF CONC SLAB
SF 1,950.000 $15.000 $18.000 $22.000 $20.600 $20.000 $25.000 $25.000 $17.000
PRESTR CONC GIRDER (TX28)
LF 298.000 $150.000 $173.220 $155.000 $145.000 $198.350 $161.500 $168.000 $155.000
RIPRAP (STONE COMMON)(DRY)(6 IN)
CY 22.000 $200.000 $181.270 $85.000 $115.000 $150.000 $225.000 $270.000 $100.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 392.000 $116.000 $127.380 $110.000 $115.000 $125.000 $139.200 $180.000 $150.000
RAIL (TY T223)
LF 198.000 $80.000 $66.300 $120.000 $110.000 $116.000 $99.500 $128.000 $120.000
ARMOR JOINT (SEALED)
LF 44.000 $85.000 $61.000 $85.000 $85.000 $90.000 $63.450 $105.000 $85.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $20,000.000 $20,000.000 $20,000.000 $10,500.000 $8,000.000 $22,000.000 $9,800.000 $25,000.000
MOBILIZATION
LS 1.000 $32,000.000 $34,000.000 $30,000.000 $30,000.000 $36,000.000 $42,000.000 $27,000.000 $45,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $1,500.000 $631.000 $2,700.000 $810.000 $1,002.470 $2,115.000 $3,600.000 $3,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 40.000 $28.000 $25.000 $35.000 $42.000 $49.780 $27.750 $40.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 40.000 $9.000 $5.000 $7.000 $10.000 $12.470 $22.750 $10.000 $5.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000 $34.000 $3.000 $25.000 $14.000 $21.150 $23.400 $17.000 $22.000
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $8.000 $1.000 $7.000 $2.400 $8.710 $8.450 $7.000 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 827.000 $2.500 $4.000 $3.000 $3.600 $3.730 $3.000 $3.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 827.000 $0.600 $0.500 $1.000 $2.000 $1.240 $0.450 $1.000 $2.000
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $790.000 $1,072.000 $1,100.000 $1,300.000 $1,244.150 $936.000 $900.000 $1,100.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,200.000 $2,859.520 $2,500.000 $2,800.000 $2,985.950 $2,390.000 $2,300.000 $2,600.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $320.000 $836.000 $555.000 $420.000 $450.000 $765.000 $445.000 $555.000
REMOVE SM RD SN SUP&AM
EA 2.000 $90.000 $78.160 $50.000 $30.000 $150.000 $75.000 $90.000 $50.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 2.000 $17.000 $20.000 $25.000 $30.000 $12.440 $11.000 $10.000 $25.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 4.000 $21.000 $20.000 $25.000 $30.000 $24.880 $21.000 $20.000 $25.000
Totals: $359,348.500 $341,287.960 $385,282.500 $392,574.500 $406,401.754 $420,860.800 $435,743.000 $460,333.500