REMOVING CONC (PAV)
|
SY
|
339.000
|
$10.000
|
$65.000
|
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
71.000
|
$13.670
|
$50.000
|
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
882.000
|
$25.000
|
$35.000
|
|
|
|
REMOVING CONC (CURB)
|
LF
|
468.000
|
$5.260
|
$10.000
|
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
662.000
|
$13.500
|
$10.000
|
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
158.000
|
$15.890
|
$35.000
|
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
145,597.000
|
$4.000
|
$7.000
|
|
|
|
REMOVING STAB BASE AND ASPH PAV (13")
|
SY
|
85,261.000
|
$8.450
|
$17.000
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
9,585.000
|
$11.400
|
$20.000
|
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY D)
|
CY
|
8,894.000
|
$19.000
|
$35.000
|
|
|
|
BLADING
|
HR
|
100.000
|
$337.500
|
$330.000
|
|
|
|
PROOF ROLLING
|
HR
|
100.000
|
$150.000
|
$115.000
|
|
|
|
FL BS (CMP IN PLC)(TY A GR 4)(7")
|
SY
|
133,982.000
|
$11.500
|
$12.000
|
|
|
|
PRIME COAT (AE-P)
|
GAL
|
55,779.000
|
$4.850
|
$6.000
|
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
104,212.000
|
$5.000
|
$4.000
|
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
2,493.000
|
$168.000
|
$150.000
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
10,000.000
|
$42.280
|
$35.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
476.000
|
$272.000
|
$220.000
|
|
|
|
CUT & RESTORING PAV
|
SY
|
187.000
|
$126.520
|
$650.000
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
500.000
|
$19.110
|
$40.000
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
232.000
|
$38.500
|
$50.000
|
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
230.000
|
$392.990
|
$400.000
|
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
10.000
|
$784.340
|
$1,600.000
|
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
70.000
|
$150.000
|
$300.000
|
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
508.000
|
$220.000
|
$350.000
|
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
96.000
|
$159.000
|
$400.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
2.000
|
$10,000.000
|
$16,000.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$3,976.500
|
$4,500.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,910.170
|
$5,000.000
|
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
8.000
|
$2,764.680
|
$5,500.000
|
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$5,000.000
|
$6,500.000
|
|
|
|
ADJUSTING MANHOLES
|
EA
|
1.000
|
$1,660.480
|
$2,300.000
|
|
|
|
ADJUSTING MANHOLES (SANITARY)
|
EA
|
7.000
|
$1,900.000
|
$2,300.000
|
|
|
|
ADJUSTING MANHOLES (WATER VALVE BOX)
|
EA
|
9.000
|
$661.430
|
$1,475.000
|
|
|
|
ADJUSTING MANHOLES (TELEPHONE BOX)
|
EA
|
1.000
|
$1,420.360
|
$1,480.000
|
|
|
|
REMOV STR (WINGWALL)
|
EA
|
9.000
|
$1,570.750
|
$4,700.000
|
|
|
|
REMOV STR (PIPE)
|
LF
|
735.000
|
$23.440
|
$65.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,500,000.000
|
$3,290,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$15,300.780
|
$100,000.000
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
840.000
|
$10.000
|
$10.000
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
840.000
|
$2.500
|
$2.000
|
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
519.000
|
$40.000
|
$50.000
|
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
160.000
|
$40.000
|
$45.000
|
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,131.000
|
$150.000
|
$220.000
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
8,846.000
|
$100.000
|
$140.000
|
|
|
|
CONC SIDEWALKS (5")
|
SY
|
518.000
|
$80.000
|
$150.000
|
|
|
|
CURB RAMPS (TY 7)
|
EA
|
3.000
|
$2,675.000
|
$4,000.000
|
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
70,545.000
|
$0.160
|
$0.150
|
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
26,635.000
|
$0.220
|
$0.200
|
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
11.000
|
$315.000
|
$200.000
|
|
|
|
IN RD IL (TY SA) 50T-10 (400W EQ) LED
|
EA
|
23.000
|
$7,428.130
|
$9,000.000
|
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
4,935.000
|
$15.000
|
$11.000
|
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
670.000
|
$49.850
|
$30.000
|
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
6,073.000
|
$2.440
|
$2.500
|
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
12,146.000
|
$3.650
|
$3.000
|
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
7.000
|
$1,767.260
|
$1,700.000
|
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
2.000
|
$7,650.000
|
$13,000.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
94.000
|
$900.000
|
$850.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
23.000
|
$1,114.060
|
$950.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
9.000
|
$1,253.700
|
$1,100.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
1.000
|
$1,027.740
|
$1,150.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,747.000
|
$1,175.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
113.000
|
$143.320
|
$150.000
|
|
|
|
RELOCATE LRSA
|
EA
|
1.000
|
$7,000.000
|
$5,000.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
237,414.000
|
$0.150
|
$0.150
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
5,650.000
|
$0.310
|
$0.200
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
8.000
|
$47.250
|
$40.000
|
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
8.000
|
$57.750
|
$40.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
241,801.000
|
$0.160
|
$0.150
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
24,104.000
|
$2.950
|
$0.500
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
7,030.000
|
$2.230
|
$0.600
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
17,152.000
|
$1.400
|
$0.600
|
|
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
947.000
|
$1.220
|
$1.300
|
|
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
1,749.000
|
$1.120
|
$1.400
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
9,256.000
|
$1.110
|
$1.000
|
|
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
23.000
|
$63.420
|
$26.000
|
|
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
2,929.000
|
$4.730
|
$5.250
|
|
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
8,121.000
|
$0.650
|
$0.700
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
70,545.000
|
$0.550
|
$0.500
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
4,103.000
|
$0.540
|
$0.500
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
88,008.000
|
$0.550
|
$0.500
|
|
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
376.000
|
$14.500
|
$18.500
|
|
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
45.000
|
$258.500
|
$250.000
|
|
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
8.000
|
$567.000
|
$600.000
|
|
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
23.000
|
$315.000
|
$300.000
|
|
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
2.000
|
$686.580
|
$750.000
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
955.000
|
$3.830
|
$4.000
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,320.000
|
$3.240
|
$4.000
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
454,673.000
|
$0.430
|
$0.850
|
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
4,690.000
|
$1.000
|
$1.250
|
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
416.000
|
$1.880
|
$2.000
|
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
482.000
|
$3.290
|
$3.000
|
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
22.000
|
$49.540
|
$35.000
|
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
4.000
|
$56.420
|
$13.000
|
|
|
|
SP MIXES SP-B SAC-B PG70-22
|
TON
|
60,333.000
|
$103.880
|
$132.000
|
|
|
|
STONE-MTRX-ASPH SMAR-F SAC-A
|
TON
|
29,917.000
|
$157.350
|
$157.000
|
|
|
|
BONDING COURSE
|
GAL
|
27,197.000
|
$4.750
|
$6.000
|
|
|
|
CEMENT
|
TON
|
949.000
|
$212.830
|
$345.000
|
|
|
|
EMULSION
|
GAL
|
1,310,816.000
|
$3.500
|
$3.250
|
|
|
|
EMUL TRTMNT (MX EXST MTRL & NEW BASE)7"
|
SY
|
278,897.000
|
$4.000
|
$3.500
|
|
|
|
THERMOPLASTIC PIPE (SIZE)(PP)
|
LF
|
128.000
|
$128.410
|
$140.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$22,000.000
|
$19,750.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
670.000
|
$139.750
|
$200.000
|
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
200.000
|
$75.000
|
$75.000
|
|
1
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
128.000
|
$128.410
|
$0.000
|
|
Totals: |
$27,488,329.300
|
$32,902,552.400
|