Job Info for 0004-02-063

County: WARD Highway: IH 20 Date: 06/27/2023 (1 year ago) Engineer's Estimate: $31,008,181 Control Number: 0004-02-063
Project: BR 2023(933) District: ODESSA Time: 434 WORKING DAYS Type: REPLACE BRIDGES AND APPROACHES
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $31,008,180.70
JAMES CONSTRUCTION GROUP, LLC   $28,745,654.99 1
-7.3% | -$2,262,525.71
DAN WILLIAMS COMPANY   $32,593,383.30 2
5.11% | $1,585,202.60
13.39% | $3,847,728.31
RAGLE CONSTRUCTION, INC.   $35,281,895.24 3
13.78% | $4,273,714.54
22.74% | $6,536,240.25
8.25% | $2,688,511.94
FNF CONSTRUCTION, INC.   $37,314,065.00 4
20.34% | $6,305,884.30
29.81% | $8,568,410.01
5.76% | $2,032,169.76
Subcontractor Percentage Amount
LONE STAR PAVING COMPANY 10.76% $3,093,032.48
M & D FOUNDATION DRILLING INDUSTRIES, INC. 6.64% $1,908,711.49
CND CONTRACTING 2.78% $799,129.21
JB PINNACLE GROUP, LLC 1.54% $442,683.09
NATIONWIDE REBAR INC. 1.23% $353,571.56
HJC FARMS, INC. 1.17% $336,324.16
F.S. TRUCKING, INC. 1.02% $293,205.68
DALLAS LITE AND BARRICADE, INC. 0.76% $218,466.98
TRP CONSTRUCTION GROUP, LLC 0.54% $155,226.54
A K FUQUAY CONSTRUCTION 0.41% $117,857.19
TORO BRAVO CONSTRUCTION, LLC 0.38% $109,233.49
A BROTHERS MILLING, LLC 0.24% $68,989.57
A-CORE CONCRETE CUTTING OF TEXAS, INC. 0.17% $48,867.61
FC TRAFFIC CONTROL, INC. 0.13% $37,369.35
WEST TEXAS ROCK RESOURCES, LLC 0.02% $5,749.13
Total: 27.79% $7,988,417.53

Bid Items

Items: 96, 0 filtered
WARD IH 20  |  ODESSA  |  0004-02-063  |  06/27/2023  |  $31,008,181  |  BR 2023(933)  |  REPLACE BRIDGES AND APPROACHES  |  434 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate JAMES CONSTRUCTION GROUP, LLC DAN WILLIAMS COMPANY RAGLE CONSTRUCTION, INC. FNF CONSTRUCTION, INC.
104 6054 REMOVING CONCRETE(MOW STRIP) LF 3,189.000 $15.000 $10.660 $7.000 $6.400 $15.000
105 6044 REMOVING STAB BASE AND ASPH PAV (10") SY 15,520.000 $10.000 $8.830 $10.000 $40.000 $20.000
110 6001 EXCAVATION (ROADWAY) CY 12,127.000 $28.000 $45.380 $16.000 $100.000 $35.000
132 6006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 13,399.000 $25.000 $39.880 $20.000 $20.000 $67.000
150 6002 BLADING HR 30.000 $275.000 $532.150 $150.000 $178.000 $335.000
164 6033 DRILL SEEDING (PERM) (RURAL) (SANDY) SY 53,122.000 $0.250 $1.330 $0.450 $0.450 $1.000
216 6001 PROOF ROLLING HR 30.000 $175.000 $149.190 $71.500 $114.000 $125.000
247 6274 FL BS (CMP IN PLC)(TY A GR 4)(14") SY 33,160.000 $25.000 $40.820 $58.000 $34.000 $25.000
310 6005 PRIME COAT (AE-P) GAL 6,638.000 $6.000 $7.920 $8.500 $7.400 $6.000
316 6017 ASPH (AC-20-5TR) GAL 22,108.000 $5.000 $6.600 $7.500 $6.100 $5.000
316 6126 AGGR(TY-PB GR-4 SAC-A) CY 566.000 $190.000 $228.240 $300.000 $260.000 $130.000
354 6030 PLANE ASPH CONC PAV(0" TO 8") SY 5,066.000 $8.000 $4.240 $8.000 $8.000 $7.000
400 6005 CEM STABIL BKFL CY 1,238.000 $300.000 $232.910 $325.000 $130.000 $260.000
402 6001 TRENCH EXCAVATION PROTECTION LF 129.000 $45.000 $51.130 $4.300 $27.000 $55.000
416 6004 DRILL SHAFT (36 IN) LF 7,208.000 $475.000 $396.170 $400.000 $500.000 $520.000
416 6018 DRILL SHAFT (SIGN MTS) (24 IN) LF 28.000 $210.000 $233.170 $300.000 $500.000 $200.000
420 6011 CL B CONC (FLUME) CY 40.100 $1,100.000 $4,136.200 $1,500.000 $630.000 $3,250.000
420 6014 CL C CONC (ABUT)(HPC) CY 576.000 $2,000.000 $1,131.110 $1,600.000 $950.000 $2,590.000
420 6030 CL C CONC (CAP)(HPC) CY 566.400 $2,000.000 $1,479.900 $2,200.000 $1,210.000 $2,080.000
422 6002 REINF CONC SLAB (HPC) SF 107,200.000 $35.000 $38.660 $35.000 $37.000 $45.000
422 6015 APPROACH SLAB CY 732.000 $700.000 $1,011.320 $1,000.000 $660.000 $1,440.000
425 6035 PRESTR CONC GIRDER (TX28) LF 13,290.000 $220.000 $233.160 $260.000 $195.000 $339.000
432 6008 RIPRAP (CONC)(CL B)(RR8&RR9) CY 735.700 $750.000 $681.110 $800.000 $538.000 $825.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 518.000 $700.000 $899.350 $750.000 $300.000 $800.000
450 6024 RAIL (TY SSTR)(HPC) LF 3,256.000 $150.000 $86.600 $115.000 $73.000 $125.000
450 6111 RAIL (TY SSTR) (W/DRAIN SLOT) (HPC) LF 2,680.000 $155.000 $93.270 $120.000 $91.000 $140.000
454 6018 SEALED EXPANSION JOINT (4 IN) (SEJ - M) LF 936.000 $260.000 $254.410 $195.000 $205.000 $365.000
464 6008 RC PIPE (CL III)(36 IN) LF 146.000 $400.000 $226.070 $220.000 $301.000 $400.000
467 6450 SET (TY II) (36 IN) (RCP) (4: 1) (C) EA 2.000 $8,000.000 $6,470.350 $8,000.000 $4,000.000 $4,900.000
496 6004 REMOV STR (SET) EA 2.000 $1,800.000 $743.020 $750.000 $1,000.000 $1,100.000
496 6007 REMOV STR (PIPE) LF 133.000 $45.000 $31.950 $30.000 $20.000 $80.000
496 6010 REMOV STR (BRIDGE 100 - 499 FT LENGTH) EA 12.000 $90,000.000 $92,270.000 $85,000.000 $400,000.000 $175,000.000
500 6001 MOBILIZATION LS 1.000 $3,091,200.000 $1,560,547.060 $2,800,000.000 $3,500,000.000 $3,700,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 22.000 $24,000.000 $9,482.220 $25,000.000 $56,500.000 $50,000.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 312.000 $40.000 $31.660 $45.000 $50.000 $110.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 312.000 $14.000 $11.870 $18.000 $25.000 $20.000
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF 8,776.000 $11.000 $13.850 $9.750 $9.750 $15.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 8,776.000 $2.000 $3.300 $1.750 $1.250 $2.000
508 6001 CONSTRUCTING DETOURS SY 11,075.000 $135.000 $97.090 $135.000 $115.000 $160.000
512 6001 PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) LF 9,704.000 $90.000 $66.750 $120.000 $80.000 $90.000
512 6025 PORT CTB (MOVE)(SGL SLP)(TY 1) LF 14,398.000 $15.000 $5.600 $7.000 $20.000 $30.000
512 6049 PORT CTB (REMOVE)(SGL SLP)(TY 1) LF 15,119.000 $25.000 $9.150 $15.000 $12.000 $20.000
514 6001 PERM CTB (SGL SLOPE) (TY 1) (42 ) LF 6,786.000 $180.000 $92.880 $125.000 $60.000 $30.000
533 6001 RUMBLE STRIPS (SHOULDER) LF 13,880.000 $0.250 $0.460 $0.350 $0.500 $0.500
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 3,075.000 $38.000 $44.200 $35.000 $33.000 $45.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 18.000 $3,000.000 $3,529.150 $3,500.000 $2,900.000 $3,500.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 18.000 $1,600.000 $1,945.980 $1,600.000 $1,425.000 $2,000.000
540 6018 MTL BM GD FEN TRANS (NON - SYM) EA 18.000 $1,350.000 $1,602.960 $1,200.000 $1,150.000 $1,500.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 1,975.000 $4.000 $3.300 $3.000 $2.000 $4.000
542 6004 RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA 30.000 $400.000 $329.830 $200.000 $200.000 $350.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 18.000 $3,800.000 $4,386.700 $4,000.000 $3,000.000 $4,500.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 18.000 $380.000 $263.860 $400.000 $200.000 $275.000
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA 1.000 $1,500.000 $3,298.280 $1,000.000 $2,636.080 $650.000
545 6005 CRASH CUSH ATTEN (REMOVE) EA 2.000 $1,800.000 $1,978.960 $1,000.000 $3,105.680 $5,000.000
545 6019 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 2.000 $25,000.000 $10,554.470 $12,000.000 $14,835.420 $25,000.000
636 6002 ALUMINUM SIGNS (TY G) SF 157.000 $35.000 $39.580 $35.000 $50.000 $35.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 3.000 $1,025.000 $1,121.410 $1,400.000 $619.000 $900.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 4.000 $1,200.000 $1,438.050 $2,000.000 $987.000 $1,200.000
644 6076 REMOVE SM RD SN SUP&AM EA 7.000 $175.000 $131.930 $150.000 $175.000 $150.000
647 6001 INSTALL LRSS (STRUCT STEEL) LB 956.000 $10.000 $9.240 $10.000 $15.000 $8.000
647 6003 REMOVE LRSA EA 2.000 $2,000.000 $1,649.140 $950.000 $1,500.000 $1,800.000
658 6013 INSTL DEL ASSM (D-SW)SZ (BRF)CTB EA 32.000 $40.000 $26.390 $75.000 $18.000 $25.000
658 6026 INSTL DEL ASSM (D-SY)SZ (BRF)CTB EA 67.000 $40.000 $26.390 $75.000 $19.000 $25.000
658 6047 INSTL OM ASSM (OM-2Y)(WC)GND EA 2.000 $150.000 $197.900 $125.000 $2.000 $200.000
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 40.000 $35.000 $55.410 $90.000 $35.000 $50.000
658 6064 INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 EA 20.000 $35.000 $55.410 $90.000 $35.000 $50.000
662 6008 WK ZN PAV MRK NON-REMOV (W)6"(SLD) LF 21,814.000 $0.600 $0.660 $0.500 $0.500 $0.750
662 6037 WK ZN PAV MRK NON-REMOV (Y)6"(SLD) LF 23,350.000 $0.600 $0.660 $0.500 $0.500 $0.750
662 6048 WK ZN PAV MRK REMOV (REFL) TY I-C EA 159.000 $6.000 $9.240 $7.000 $7.000 $10.000
662 6050 WK ZN PAV MRK REMOV (REFL) TY II-A-A EA 159.000 $6.000 $9.240 $7.000 $7.000 $10.000
662 6056 WK ZN PAV MRK REMOV (TRAF BTN) TY W EA 632.000 $5.000 $7.920 $6.000 $6.000 $8.000
662 6058 WK ZN PAV MRK REMOV (TRAF BTN) TY Y EA 632.000 $5.000 $7.920 $6.000 $6.000 $8.000
662 6067 WK ZN PAV MRK REMOV (W)6"(SLD) LF 13,562.000 $1.200 $1.450 $1.100 $1.100 $1.500
662 6098 WK ZN PAV MRK REMOV (Y)6"(SLD) LF 17,486.000 $1.600 $1.450 $1.100 $1.100 $1.500
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 414.000 $2.000 $2.640 $2.600 $1.600 $3.000
662 6112 WK ZN PAV MRK SHT TERM RMV (W)(4") LF 1,290.000 $1.300 $2.640 $3.000 $1.600 $3.000
666 6306 RE PM W/RET REQ TY I (W)6"(BRK)(100MIL) LF 6,180.000 $0.800 $0.990 $0.750 $0.750 $1.000
666 6309 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) LF 22,456.000 $0.800 $0.920 $0.700 $0.700 $1.000
666 6321 RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) LF 24,434.000 $1.000 $0.920 $0.700 $0.700 $1.000
672 6010 REFL PAV MRKR TY II-C-R EA 311.000 $6.000 $9.240 $7.000 $7.000 $7.000
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 41,560.000 $0.900 $1.120 $0.850 $0.850 $1.000
677 6028 ELIM EXT PV MRK & MRKS (RUMBLE STRIP) LF 37,596.000 $3.000 $3.960 $6.000 $2.160 $5.000
678 6002 PAV SURF PREP FOR MRK (6") LF 37,310.000 $2.000 $0.330 $0.250 $0.250 $0.250
678 6033 PAV SURF PREP FOR MRK (RPM) EA 227.000 $4.000 $1.320 $1.000 $1.000 $1.000
3077 6007 SP MIXES SP-B SAC-B PG70-22 TON 13,500.000 $130.000 $197.080 $227.000 $200.000 $140.000
3077 6075 TACK COAT GAL 3,068.000 $6.000 $6.600 $10.000 $8.000 $13.000
3080 6021 STONE-MTRX-ASPH SMAR-F SAC-A TON 3,248.000 $160.000 $289.050 $350.000 $325.000 $175.000
3084 6001 BONDING COURSE GAL 3,068.000 $5.500 $6.600 $10.000 $6.100 $8.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 5.000 $25,000.000 $15,002.400 $14,000.000 $50,000.000 $20,000.000
6072 6001 MODULAR GLARE SCREENS (FURN & INSTALL) LF 9,704.000 $30.000 $36.580 $22.000 $21.000 $25.000
6072 6002 MODULAR GLARE SCREENS (REMOVE) LF 9,704.000 $2.000 $10.030 $2.000 $4.500 $3.000
6072 6003 MODULAR GLARE SCREENS (MOVE) LF 8,610.000 $6.000 $10.600 $3.000 $4.000 $2.000
6079 6002 AUTO PORT SMRT TRF MONITOR SYS (PLAN 1) DAY 1,338.000 $500.000 $223.840 $275.000 $255.000 $225.000
6158 6001 TMSP RADAR SPEED CONTROL MONITOR EA 2.000 $10,000.000 $13,323.720 $12,000.000 $100,000.000 $14,000.000
6185 6002 TMA (STATIONARY) DAY 106.000 $500.000 $902.680 $350.000 $250.000 $275.000
6185 6005 TMA (MOBILE OPERATION) DAY 246.000 $750.000 $134.100 $330.000 $787.000 $740.000
Totals: $31,008,180.70 $28,745,655.00 $32,593,383.30 $35,281,895.24 $37,314,065.00