REMOVING CONCRETE(MOW STRIP)
|
LF
|
3,189.000
|
$15.000
|
$10.660
|
$7.000
|
$6.400
|
$15.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (10")
|
SY
|
15,520.000
|
$10.000
|
$8.830
|
$10.000
|
$40.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
12,127.000
|
$28.000
|
$45.380
|
$16.000
|
$100.000
|
$35.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
13,399.000
|
$25.000
|
$39.880
|
$20.000
|
$20.000
|
$67.000
|
|
|
BLADING
|
HR
|
30.000
|
$275.000
|
$532.150
|
$150.000
|
$178.000
|
$335.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
53,122.000
|
$0.250
|
$1.330
|
$0.450
|
$0.450
|
$1.000
|
|
|
PROOF ROLLING
|
HR
|
30.000
|
$175.000
|
$149.190
|
$71.500
|
$114.000
|
$125.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4)(14")
|
SY
|
33,160.000
|
$25.000
|
$40.820
|
$58.000
|
$34.000
|
$25.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
6,638.000
|
$6.000
|
$7.920
|
$8.500
|
$7.400
|
$6.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
22,108.000
|
$5.000
|
$6.600
|
$7.500
|
$6.100
|
$5.000
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
566.000
|
$190.000
|
$228.240
|
$300.000
|
$260.000
|
$130.000
|
|
|
PLANE ASPH CONC PAV(0" TO 8")
|
SY
|
5,066.000
|
$8.000
|
$4.240
|
$8.000
|
$8.000
|
$7.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,238.000
|
$300.000
|
$232.910
|
$325.000
|
$130.000
|
$260.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
129.000
|
$45.000
|
$51.130
|
$4.300
|
$27.000
|
$55.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
7,208.000
|
$475.000
|
$396.170
|
$400.000
|
$500.000
|
$520.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
28.000
|
$210.000
|
$233.170
|
$300.000
|
$500.000
|
$200.000
|
|
|
CL B CONC (FLUME)
|
CY
|
40.100
|
$1,100.000
|
$4,136.200
|
$1,500.000
|
$630.000
|
$3,250.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
576.000
|
$2,000.000
|
$1,131.110
|
$1,600.000
|
$950.000
|
$2,590.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
566.400
|
$2,000.000
|
$1,479.900
|
$2,200.000
|
$1,210.000
|
$2,080.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
107,200.000
|
$35.000
|
$38.660
|
$35.000
|
$37.000
|
$45.000
|
|
|
APPROACH SLAB
|
CY
|
732.000
|
$700.000
|
$1,011.320
|
$1,000.000
|
$660.000
|
$1,440.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
13,290.000
|
$220.000
|
$233.160
|
$260.000
|
$195.000
|
$339.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
735.700
|
$750.000
|
$681.110
|
$800.000
|
$538.000
|
$825.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
518.000
|
$700.000
|
$899.350
|
$750.000
|
$300.000
|
$800.000
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
3,256.000
|
$150.000
|
$86.600
|
$115.000
|
$73.000
|
$125.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOT) (HPC)
|
LF
|
2,680.000
|
$155.000
|
$93.270
|
$120.000
|
$91.000
|
$140.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
936.000
|
$260.000
|
$254.410
|
$195.000
|
$205.000
|
$365.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
146.000
|
$400.000
|
$226.070
|
$220.000
|
$301.000
|
$400.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$8,000.000
|
$6,470.350
|
$8,000.000
|
$4,000.000
|
$4,900.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$1,800.000
|
$743.020
|
$750.000
|
$1,000.000
|
$1,100.000
|
|
|
REMOV STR (PIPE)
|
LF
|
133.000
|
$45.000
|
$31.950
|
$30.000
|
$20.000
|
$80.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
12.000
|
$90,000.000
|
$92,270.000
|
$85,000.000
|
$400,000.000
|
$175,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$3,091,200.000
|
$1,560,547.060
|
$2,800,000.000
|
$3,500,000.000
|
$3,700,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
22.000
|
$24,000.000
|
$9,482.220
|
$25,000.000
|
$56,500.000
|
$50,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$40.000
|
$31.660
|
$45.000
|
$50.000
|
$110.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$14.000
|
$11.870
|
$18.000
|
$25.000
|
$20.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
8,776.000
|
$11.000
|
$13.850
|
$9.750
|
$9.750
|
$15.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
8,776.000
|
$2.000
|
$3.300
|
$1.750
|
$1.250
|
$2.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
11,075.000
|
$135.000
|
$97.090
|
$135.000
|
$115.000
|
$160.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
9,704.000
|
$90.000
|
$66.750
|
$120.000
|
$80.000
|
$90.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
14,398.000
|
$15.000
|
$5.600
|
$7.000
|
$20.000
|
$30.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
15,119.000
|
$25.000
|
$9.150
|
$15.000
|
$12.000
|
$20.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
6,786.000
|
$180.000
|
$92.880
|
$125.000
|
$60.000
|
$30.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
13,880.000
|
$0.250
|
$0.460
|
$0.350
|
$0.500
|
$0.500
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
3,075.000
|
$38.000
|
$44.200
|
$35.000
|
$33.000
|
$45.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
18.000
|
$3,000.000
|
$3,529.150
|
$3,500.000
|
$2,900.000
|
$3,500.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
18.000
|
$1,600.000
|
$1,945.980
|
$1,600.000
|
$1,425.000
|
$2,000.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
18.000
|
$1,350.000
|
$1,602.960
|
$1,200.000
|
$1,150.000
|
$1,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,975.000
|
$4.000
|
$3.300
|
$3.000
|
$2.000
|
$4.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
30.000
|
$400.000
|
$329.830
|
$200.000
|
$200.000
|
$350.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
18.000
|
$3,800.000
|
$4,386.700
|
$4,000.000
|
$3,000.000
|
$4,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
18.000
|
$380.000
|
$263.860
|
$400.000
|
$200.000
|
$275.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$1,500.000
|
$3,298.280
|
$1,000.000
|
$2,636.080
|
$650.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,800.000
|
$1,978.960
|
$1,000.000
|
$3,105.680
|
$5,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$25,000.000
|
$10,554.470
|
$12,000.000
|
$14,835.420
|
$25,000.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
157.000
|
$35.000
|
$39.580
|
$35.000
|
$50.000
|
$35.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
3.000
|
$1,025.000
|
$1,121.410
|
$1,400.000
|
$619.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$1,200.000
|
$1,438.050
|
$2,000.000
|
$987.000
|
$1,200.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
7.000
|
$175.000
|
$131.930
|
$150.000
|
$175.000
|
$150.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
956.000
|
$10.000
|
$9.240
|
$10.000
|
$15.000
|
$8.000
|
|
|
REMOVE LRSA
|
EA
|
2.000
|
$2,000.000
|
$1,649.140
|
$950.000
|
$1,500.000
|
$1,800.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
32.000
|
$40.000
|
$26.390
|
$75.000
|
$18.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
67.000
|
$40.000
|
$26.390
|
$75.000
|
$19.000
|
$25.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
2.000
|
$150.000
|
$197.900
|
$125.000
|
$2.000
|
$200.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
40.000
|
$35.000
|
$55.410
|
$90.000
|
$35.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
20.000
|
$35.000
|
$55.410
|
$90.000
|
$35.000
|
$50.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
21,814.000
|
$0.600
|
$0.660
|
$0.500
|
$0.500
|
$0.750
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
23,350.000
|
$0.600
|
$0.660
|
$0.500
|
$0.500
|
$0.750
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
159.000
|
$6.000
|
$9.240
|
$7.000
|
$7.000
|
$10.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
159.000
|
$6.000
|
$9.240
|
$7.000
|
$7.000
|
$10.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
632.000
|
$5.000
|
$7.920
|
$6.000
|
$6.000
|
$8.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
632.000
|
$5.000
|
$7.920
|
$6.000
|
$6.000
|
$8.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
13,562.000
|
$1.200
|
$1.450
|
$1.100
|
$1.100
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
17,486.000
|
$1.600
|
$1.450
|
$1.100
|
$1.100
|
$1.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
414.000
|
$2.000
|
$2.640
|
$2.600
|
$1.600
|
$3.000
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
1,290.000
|
$1.300
|
$2.640
|
$3.000
|
$1.600
|
$3.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
6,180.000
|
$0.800
|
$0.990
|
$0.750
|
$0.750
|
$1.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
22,456.000
|
$0.800
|
$0.920
|
$0.700
|
$0.700
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
24,434.000
|
$1.000
|
$0.920
|
$0.700
|
$0.700
|
$1.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
311.000
|
$6.000
|
$9.240
|
$7.000
|
$7.000
|
$7.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
41,560.000
|
$0.900
|
$1.120
|
$0.850
|
$0.850
|
$1.000
|
|
|
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
|
LF
|
37,596.000
|
$3.000
|
$3.960
|
$6.000
|
$2.160
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
37,310.000
|
$2.000
|
$0.330
|
$0.250
|
$0.250
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
227.000
|
$4.000
|
$1.320
|
$1.000
|
$1.000
|
$1.000
|
|
|
SP MIXES SP-B SAC-B PG70-22
|
TON
|
13,500.000
|
$130.000
|
$197.080
|
$227.000
|
$200.000
|
$140.000
|
|
|
TACK COAT
|
GAL
|
3,068.000
|
$6.000
|
$6.600
|
$10.000
|
$8.000
|
$13.000
|
|
|
STONE-MTRX-ASPH SMAR-F SAC-A
|
TON
|
3,248.000
|
$160.000
|
$289.050
|
$350.000
|
$325.000
|
$175.000
|
|
|
BONDING COURSE
|
GAL
|
3,068.000
|
$5.500
|
$6.600
|
$10.000
|
$6.100
|
$8.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
5.000
|
$25,000.000
|
$15,002.400
|
$14,000.000
|
$50,000.000
|
$20,000.000
|
|
|
MODULAR GLARE SCREENS (FURN & INSTALL)
|
LF
|
9,704.000
|
$30.000
|
$36.580
|
$22.000
|
$21.000
|
$25.000
|
|
|
MODULAR GLARE SCREENS (REMOVE)
|
LF
|
9,704.000
|
$2.000
|
$10.030
|
$2.000
|
$4.500
|
$3.000
|
|
|
MODULAR GLARE SCREENS (MOVE)
|
LF
|
8,610.000
|
$6.000
|
$10.600
|
$3.000
|
$4.000
|
$2.000
|
|
|
AUTO PORT SMRT TRF MONITOR SYS (PLAN 1)
|
DAY
|
1,338.000
|
$500.000
|
$223.840
|
$275.000
|
$255.000
|
$225.000
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
2.000
|
$10,000.000
|
$13,323.720
|
$12,000.000
|
$100,000.000
|
$14,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
106.000
|
$500.000
|
$902.680
|
$350.000
|
$250.000
|
$275.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
246.000
|
$750.000
|
$134.100
|
$330.000
|
$787.000
|
$740.000
|
|
Totals: |
$31,008,180.700
|
$28,745,654.997
|
$32,593,383.300
|
$35,281,895.240
|
$37,314,065.000
|