Show Job Controls
Bid Cobra

WARD IH 20 (0004-02-058)

Items: 67

County: WARD
Length: N/A
Highway: IH 20
District: ODESSA
Control Number: 0004-02-058
DBE Goal: N/A
Project: NH 2019(108)
Guaranty: N/A
Time: 351 WORKING DAYS
Engineer's Estimate: $25,388,366.20
Date: 10/02/2018 (7 years ago)
Contract Number: N/A
Type: RECONSTRUCT PAVEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$25,388,366.20
Over/Under Est: -4.91% -$1,246,491.05
$25,073,595.67
Over/Under Est: -1.24% -$314,770.53
Amt Left: 3.86% $931,720.52
$26,699,839.96
Over/Under Est: 5.17% $1,311,473.76
Amt Left: 10.6% $2,557,964.81
Delta: -6.49% -$1,626,244.29
Over/Under Est: 9.48% $2,406,444.88
Amt Left: 15.13% $3,652,935.93
Delta: -4.10% -$1,094,971.12
Over/Under Est: 11.6% $2,945,246.58
Amt Left: 17.36% $4,191,737.63
Delta: -1.94% -$538,801.70

Bid Items & Bid Tabulations

67 Total 0 of 67
WARD  |  IH 20  |  ODESSA  |  0004-02-058  |  10/02/2018  |  $25,388,366.20  |  NH 2019(108)  |  RECON PAVMT  |  351 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
RK HALL, LLC
FNF CONSTRUCTION, INC.
KIEWIT INFRASTRUCTURE SOUTH CO.
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
REMOVING STAB BASE AND ASPH PAV(8")
SY 237,675.000 $3.000 $5.180 $4.130 $6.000 $2.210 $3.700
BACKFILL (TY B)
STA 1,580.000 $110.000 $115.000 $59.720 $300.000 $152.400 $110.000
BLADING
HR 100.000 $150.000 $375.000 $148.740 $225.000 $211.430 $120.000
PROOF ROLLING
HR 100.000 $80.000 $125.000 $101.710 $96.000 $170.390 $60.000
REWORK BS MTL (TY D)(SURF)(ORD COMP)
SY 237,675.000 $0.600 $0.320 $1.030 $2.000 $0.260 $1.310
PRIME COAT (AE-P)
GAL 47,546.000 $3.500 $4.000 $5.250 $4.600 $3.930 $3.000
EMULS ASPH (BS OR SUBGR TRT)(SS-1H)
GAL 70,577.000 $2.500 $3.500 $3.540 $3.700 $3.650 $3.000
ASPH (AC-20-5TR)
GAL 212,053.000 $3.000 $3.350 $3.350 $3.750 $3.780 $3.700
AGGR(TY-PB GR-4 SAC-A)
CY 4,845.000 $130.000 $87.000 $99.440 $80.000 $100.760 $120.000
SUPERPAVE MIXTURES SP-B PG70-22
TON 105,810.000 $80.000 $75.750 $77.000 $81.000 $87.000 $94.000
STONE-MTRX-ASPH SMAR-F SAC-A
TON 84,567.000 $120.000 $105.000 $118.000 $99.640 $116.000 $118.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 20,000.000 $20.000 $23.850 $31.390 $27.000 $35.720 $22.000
PLANE ASPH CONC PAV(0" TO 2")
SY 11,609.000 $1.200 $6.310 $3.080 $1.000 $2.280 $0.860
PLANE ASPH CONC PAV(0" TO 4")
SY 5,840.000 $1.700 $8.050 $3.630 $1.500 $4.910 $1.250
PLANE ASPH CONC PAV (2")
SY 10,980.000 $1.300 $5.690 $2.320 $1.500 $1.720 $1.350
PLANE ASPH CONC PAV (0" TO 3 1/2")
SY 6,756.000 $1.400 $5.920 $2.100 $1.400 $4.790 $1.550
PLANE ASPH CONC PAV (4")
SY 1,020.000 $2.000 $22.470 $13.610 $4.000 $5.880 $4.300
PLANE ASPH CONC PAV (3 1/2")
SY 1,438.000 $1.500 $30.510 $9.540 $2.600 $5.630 $3.350
DRILL SHAFT (SIGN MTS) (12 IN)
LF 70.000 $120.000 $148.500 $148.500 $161.000 $152.140 $135.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 84.000 $155.000 $181.500 $181.500 $200.000 $185.950 $165.000
RIPRAP (MOW STRIP)(4 IN)
CY 420.000 $465.000 $797.500 $797.500 $860.000 $817.060 $487.500
HEADER TYPE EXPANSION JOINT
CF 104.000 $380.000 $690.800 $517.000 $453.000 $467.690 $415.000
JOINT SEALANT
LF 608.000 $15.000 $11.000 $11.550 $15.000 $20.000 $17.750
MOBILIZATION
LS 1.000 $1,603,884.710 $800,000.000 $496,381.440 $2,621,000.000 $2,575,073.450 $2,635,278.020
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $5,000.000 $15,000.000 $10,000.000 $5,000.000 $22,000.000 $10,500.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 5,000.000 $5.000 $5.470 $5.390 $7.000 $6.000 $4.600
BIODEG EROSN CONT LOGS (REMOVE)
LF 5,000.000 $1.000 $0.980 $1.450 $1.000 $1.400 $1.000
RUMBLE STRIPS (SHOULDER)
LF 328,648.000 $0.130 $0.130 $0.080 $0.100 $0.100 $0.080
MTL W-BEAM GD FEN (STEEL POST)
LF 9,125.000 $22.000 $32.450 $32.450 $33.000 $33.250 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 32.000 $1,800.000 $2,612.500 $2,612.500 $2,450.000 $2,676.570 $2,384.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 11.000 $1,500.000 $1,457.500 $1,457.500 $1,350.000 $1,493.240 $1,330.000
MTL BM GD FEN TRANS (NON - SYM)
EA 3.000 $1,100.000 $1,162.700 $1,162.700 $1,100.000 $1,191.210 $1,061.000
REMOVE METAL BEAM GUARD FENCE
LF 9,125.000 $3.000 $4.400 $4.400 $4.250 $4.510 $4.050
REMOVE TERMINAL ANCHOR SECTION
EA 11.000 $240.000 $440.000 $440.000 $410.000 $450.790 $402.000
GUARDRAIL END TREATMENT (INSTALL)
EA 40.000 $2,500.000 $3,300.000 $3,300.000 $3,050.000 $3,380.930 $3,011.000
GUARDRAIL END TREATMENT (REMOVE)
EA 40.000 $280.000 $440.000 $440.000 $410.000 $450.790 $402.000
ALUMINUM SIGNS (TY G)
SF 1,289.000 $25.000 $29.980 $29.980 $28.000 $30.710 $27.250
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 67.000 $550.000 $858.000 $940.500 $870.000 $963.560 $700.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 5.000 $600.000 $1,001.000 $1,094.500 $1,050.000 $1,121.340 $730.000
REMOVE SM RD SN SUP&AM
EA 72.000 $80.000 $75.000 $110.000 $105.000 $112.700 $150.000
INSTALL LRSS (STRUCT STEEL)
LB 6,569.000 $5.500 $6.050 $6.050 $5.600 $6.200 $5.500
REMOVE LRSA
EA 16.000 $900.000 $1,100.000 $1,100.000 $1,050.000 $1,126.980 $1,000.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 67.000 $80.000 $99.000 $148.500 $140.000 $152.140 $135.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 87.000 $34.000 $22.000 $22.000 $21.000 $22.540 $20.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 60.000 $30.000 $22.000 $22.000 $21.000 $22.540 $20.000
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
EA 40.000 $72.000 $99.000 $148.500 $140.000 $152.140 $135.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 40.000 $90.000 $99.000 $148.500 $140.000 $152.140 $135.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 294.000 $18.000 $50.000 $16.500 $15.500 $16.900 $9.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 41,100.000 $0.700 $0.190 $0.120 $0.120 $0.120 $0.160
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 164,324.000 $0.600 $0.150 $0.120 $0.120 $0.120 $0.130
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 164,324.000 $0.600 $0.150 $0.120 $0.120 $0.120 $0.130
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 12,326.000 $2.000 $1.500 $1.890 $1.800 $2.250 $0.510
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,594.000 $0.700 $0.880 $0.680 $0.700 $0.700 $0.760
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 41,100.000 $0.350 $0.400 $0.340 $0.320 $0.350 $0.340
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 180,035.000 $0.300 $0.340 $0.340 $0.320 $0.350 $0.290
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 180,035.000 $0.350 $0.350 $0.340 $0.320 $0.350 $0.300
REFL PAV MRKR TY II-C-R
EA 2,176.000 $3.000 $3.520 $3.300 $3.050 $3.380 $3.040
ELIM EXT PAV MRK & MRKS (4")
LF 369,748.000 $0.400 $0.380 $0.330 $0.310 $0.340 $0.320
ELIM EXT PAV MRK & MRKS (8")
LF 4,594.000 $0.750 $0.530 $0.660 $0.710 $0.680 $0.460
POST AND CABLE FENCE (NEW INSTALLATION)
LF 500.000 $15.000 $22.000 $22.000 $21.000 $22.540 $20.070
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 10.000 $4,000.000 $1,100.000 $1,100.000 $1,050.000 $1,126.980 $1,004.000
BONDING COURSESE
GAL 61,510.000 $3.000 $3.750 $5.270 $5.000 $3.670 $2.600
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $19,250.000 $11,762.710 $25,000.000 $22,156.330 $16,500.000
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $7,000.000 $8,250.000 $10,344.470 $8,000.000 $11,269.750 $6,500.000
AUTO PORT SMRT TRF MONITOR SYS (PLAN 1)
DAY 702.000 $300.000 $470.350 $470.350 $200.000 $450.000 $430.000
TMA (STATIONARY)
EA 4.000 $5,000.000 $18,000.000 $20,864.050 $15,000.000 $21,833.540 $6,500.000
TMA (MOBILE OPERATION)
HR 1,704.000 $30.000 $4.500 $70.460 $90.000 $70.000 $80.000
Totals: $25,388,366.200 $24,141,875.150 $25,073,595.670 $26,699,839.960 $27,794,811.080 $28,333,612.780