Show Job Controls
Bid Cobra

WALLER US0290 (6389-42-001)

Items: 44

County: WALLER
Length: N/A
Highway: US0290
District: HOUSTON
Control Number: 6389-42-001
DBE Goal: N/A
Project: RMC - 638942001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $324,900.00
Date: 05/05/2022 (4 years ago)
Contract Number: N/A
Type: GUARDRAIL REPAIR
Mail/Deliver Bids To: N/A
CARLOS ZEPEDA
DANIEL DVORAK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$324,900.00
$347,440.00
Over/Under Est: 6.94% $22,540.00
Over/Under Est: 24.64% $80,064.00
Amt Left: 16.56% $57,524.00
Over/Under Est: 24.77% $80,466.00
Amt Left: 16.67% $57,926.00
Delta: -0.10% -$402.00

Bid Items & Bid Tabulations

44 Total 0 of 44
WALLER  |  US0290  |  HOUSTON  |  6389-42-001  |  05/05/2022  |  $324,900.00  |  RMC - 638942001  |  GUARDRAIL REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ABOVE ALL CONSTRUCTION
ROY JORGENSEN ASSOCIATES, INC.
ISI CONTRACTING, INC.
REMOVING CONCRETE(MOW STRIP)
LF 450.000 $13.000 $10.000 $10.000 $2.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 40.000 $105.000 $20.000 $150.000 $95.000
CONC STR REPAIR (STANDARD)
SF 40.000 $80.000 $20.000 $135.000 $90.000
RIPRAP (MOW STRIP)(4 IN)
CY 20.000 $450.000 $400.000 $475.000 $350.000
MOBILIZATION (CALLOUT)
EA 60.000 $400.000 $1.000 $1.000 $500.000
MOBILIZATION (EMERGENCY)
EA 4.000 $500.000 $500.000 $1,000.000 $1,500.000
PORT CTB (MOVE) (SAFETY SH) (TY 2)
LF 150.000 $8.000 $15.000 $10.000 $5.000
PORT CTB (REMOVE) (SAFETY SH) (TY 2)
LF 60.000 $20.000 $15.000 $15.000 $20.000
MTL W-BEAM GD FEN (TIM POST)
LF 500.000 $23.000 $25.000 $20.000 $22.000
MTL W-BEAM GD FEN (STEEL POST)
LF 125.000 $30.000 $60.000 $24.000 $20.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,000.000 $2,000.000 $500.000 $2,420.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,100.000 $1,500.000 $1,000.000 $1,320.000
REMOVE METAL BEAM GUARD FENCE
LF 1,000.000 $2.500 $1.000 $1.000 $1.000
GUARDRAIL END TREATMENT (INSTALL)
EA 16.000 $3,200.000 $3,100.000 $4,000.000 $3,700.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 2,000.000 $16.000 $25.000 $21.000 $23.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 25.000 $15.000 $40.000 $25.000 $30.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 50.000 $15.000 $50.000 $25.000 $42.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 400.000 $45.000 $40.000 $35.000 $45.000
REPAIR STEEL POST WITH BASE PLATE
EA 12.000 $130.000 $40.000 $100.000 $600.000
REALIGN POSTS
EA 80.000 $8.500 $20.000 $10.000 $7.000
REMOVE & REPLACE BLOCKOUT
EA 100.000 $10.000 $20.000 $25.000 $20.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,500.000 $25.000 $33.000 $44.000 $35.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 130.000 $55.000 $100.000 $75.000 $58.000
REPLACE TERMINAL ANCHOR POSTS
EA 4.000 $5.000 $50.000 $1.000 $5.500
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 50.000 $1,015.000 $1,000.000 $1,400.000 $1,210.000
REPLACE SGT CABLE ASSEMBLY
EA 60.000 $100.000 $90.000 $90.000 $110.000
REPLACE SGT CABLE ANCHOR
EA 60.000 $90.000 $90.000 $85.000 $99.000
REPLACE SGT STRUT
EA 60.000 $85.000 $90.000 $90.000 $110.000
REPLACE SGT OBJECT MARKER
EA 60.000 $30.000 $50.000 $50.000 $27.500
REPAIR RAIL ELEMENT (CURVED RAIL)(FURN)
LF 50.000 $17.000 $50.000 $10.000 $10.000
REPLACE POSTS (TL-4)
EA 30.000 $130.000 $200.000 $250.000 $137.500
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 4.000 $300.000 $150.000 $250.000 $385.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 5.000 $50.000 $100.000 $150.000 $27.500
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 4.000 $1,015.000 $2,000.000 $1,100.000 $3,175.000
REPLACE CABLE (TL-4)
LF 250.000 $2.000 $5.000 $2.000 $3.000
CHECK / RE-TENSION CABLE
EA 6.000 $425.000 $500.000 $250.000 $400.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 5.000 $45.000 $50.000 $100.000 $49.500
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 2.000 $65.000 $100.000 $50.000 $49.500
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 50.000 $2.000 $5.000 $2.000 $2.200
REPAIR (TRACC) (BAY)
EA 2.000 $750.000 $1,000.000 $1,250.000 $275.000
REP (CONC PARAPETW/STL POST/RAIL-T4(S))
LF 25.000 $35.000 $100.000 $35.000 $33.000
REP METAL POST W/ BASE PLATE(T4(S)RAIL)
EA 10.000 $25.000 $150.000 $35.000 $16.500
REPAIR TY (T4 (S) RAIL)
LF 25.000 $25.000 $100.000 $100.000 $33.000
TMA (STATIONARY)
DAY 70.000 $200.000 $200.000 $600.000 $400.000
Totals: $324,900.000 $347,440.000 $404,964.000 $405,366.000