Job Info for 6309-83-001

County: WALLER Highway: US0090 Date: 03/14/2017 (7 years ago) Engineer's Estimate: $169,352 Control Number: 6309-83-001
Project: RMC - 630983001 District: HOUSTON Time: 60 W Type: EMBANKMENT AND CHANNEL STABILIZATION

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $169,352.27
TREVWAY, INC.   $168,760.00 1
-0.35% | -$592.27
K-BAR SERVICES, INC.   $202,160.00 2
19.37% | $32,807.73
19.79% | $33,400.00
ISI CONTRACTING, INC.   $237,760.00 3
40.39% | $68,407.73
40.89% | $69,000.00
17.61% | $35,600.00
JERDON ENTERPRISE, L.P.   $295,744.00 4
74.63% | $126,391.73
75.25% | $126,984.00
24.39% | $57,984.00
FNH CONSTRUCTION, LLC   $308,065.00 5
81.91% | $138,712.73
82.55% | $139,305.00
4.17% | $12,321.00
CHAMPION INFRASTRUCTURE, LLC   $342,670.00 6
102.34% | $173,317.73
103.05% | $173,910.00
11.23% | $34,605.00

Bid Items

Items: 13, 0 filtered
WALLER US0090  |  HOUSTON  |  6309-83-001  |  03/14/2017  |  $169,352  |  RMC - 630983001  |  EMBANKMENT AND CHANNEL STABILIZATION  |  60 W
Item code Description Unit Quantity Engineer's Estimate TREVWAY, INC. K-BAR SERVICES, INC. ISI CONTRACTING, INC. JERDON ENTERPRISE, L.P. FNH CONSTRUCTION, LLC CHAMPION INFRASTRUCTURE, LLC
100 6001 PREPARING ROW AC 0.410 $10,000.000 $4,500.000 $1,000.000 $25,000.000 $39,800.000 $60,000.000 $9,000.000
100 6016 PREPARING ROW (TREE) (36" TO 48" DIA) EA 2.000 $3,750.000 $300.000 $2,000.000 $2,000.000 $1,200.000 $5,000.000 $1,200.000
104 6009 REMOVING CONC (RIPRAP) SY 45.000 $6.050 $25.000 $25.000 $120.000 $262.000 $100.000 $120.000
110 6002 EXCAVATION (CHANNEL) CY 203.000 $7.340 $15.000 $50.000 $80.000 $90.000 $35.000 $120.000
132 6006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 188.000 $15.000 $15.000 $50.000 $60.000 $96.000 $50.000 $70.000
134 6004 BACKFILL (TY A OR B) STA 1.000 $185.000 $1,500.000 $1,500.000 $3,000.000 $20,000.000 $1,000.000 $2,100.000
401 6001 FLOWABLE BACKFILL CY 113.000 $220.000 $150.000 $150.000 $210.000 $340.000 $140.000 $280.000
403 6006 TEMPORARY SPL SHORING (COFFERDAM) SF 165.000 $50.000 $15.000 $15.000 $40.000 $130.000 $100.000 $160.000
432 6002 RIPRAP (CONC)(5 IN) CY 174.000 $435.000 $525.000 $425.000 $540.000 $510.000 $650.000 $900.000
432 6022 RIPRAP (STONE COMMON)(DRY)(6 IN) CY 35.000 $100.000 $150.000 $300.000 $300.000 $169.000 $210.000 $260.000
432 6026 RIPRAP (STONE COMMON)(DRY)(18 IN) CY 89.000 $165.000 $200.000 $300.000 $200.000 $137.000 $210.000 $380.000
500 6001 MOBILIZATION LS 1.000 $12,000.000 $18,000.000 $29,000.000 $19,000.000 $27,000.000 $30,000.000 $20,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 4.000 $3,500.000 $1,500.000 $4,000.000 $4,000.000 $3,800.000 $12,500.000 $3,500.000
Totals: $169,352.27 $168,760.00 $202,160.00 $237,760.00 $295,744.00 $308,065.00 $342,670.00