Show Job Controls
Bid Cobra

WALLER CR (0912-56-058)

Items: 45

County: WALLER
Length: N/A
Highway: CR
District: HOUSTON
Control Number: 0912-56-058
DBE Goal: N/A
Project: BR 1902(322)
Guaranty: N/A
Time: 60 WORKING DAYS
Engineer's Estimate: $504,943.82
Date: 08/05/2020 (5 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$504,943.82
$559,763.20
Over/Under Est: 10.86% $54,819.38
Over/Under Est: 14.68% $74,118.44
Amt Left: 3.45% $19,299.06
Over/Under Est: 15.83% $79,955.34
Amt Left: 4.49% $25,135.96
Delta: -1.01% -$5,836.90
Over/Under Est: 17.21% $86,894.78
Amt Left: 5.73% $32,075.40
Delta: -1.19% -$6,939.44
Over/Under Est: 17.3% $87,362.33
Amt Left: 5.81% $32,542.95
Delta: -0.08% -$467.55
Over/Under Est: 26.74% $135,023.13
Amt Left: 14.33% $80,203.75
Delta: -8.05% -$47,660.80

Bid Items & Bid Tabulations

45 Total 0 of 45
WALLER  |  CR  |  HOUSTON  |  0912-56-058  |  08/05/2020  |  $504,943.82  |  BR 1902(322)  |  REPLACE BRIDGE AND APPROACHES  |  60 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
EARTH BUILDERS, L.P.
FUQUA CONSTRUCTION CO., INC.
KNIFE RIVER CORPORATION - SOUTH
JOHN REED AND COMPANY, LLC
ISI CONTRACTING, INC.
HARPER BROTHERS CONSTRUCTION LLC
PREPARING ROW
STA 3.600 $7,488.510 $8,000.000 $3,000.000 $3,000.000 $4,000.000 $6,000.000 $5,135.000
EXCAVATION (ROADWAY)
CY 613.000 $5.130 $20.000 $20.000 $15.000 $20.000 $20.000 $15.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 334.000 $8.240 $30.000 $30.000 $35.500 $30.000 $31.000 $15.000
EMBANK(FINAL)(DC)(TY E)(CSBE)
CY 13.000 $33.640 $75.000 $30.000 $200.000 $100.000 $95.000 $56.540
BLOCK SODDING
SY 1,462.000 $2.540 $6.000 $4.000 $4.300 $3.000 $3.000 $3.350
STRAW OR HAY MULCH
SY 1,462.000 $0.180 $1.000 $1.000 $1.080 $0.100 $0.280 $0.550
DRILL SEED (TEMP)(WARM OR COOL)
SY 1,462.000 $0.100 $0.800 $1.000 $1.080 $0.100 $0.150 $0.550
FERTILIZER
AC 0.600 $718.360 $1,000.000 $1,000.000 $1,075.000 $500.000 $785.000 $1,333.300
VEGETATIVE WATERING
MG 84.680 $16.000 $70.000 $30.000 $40.000 $15.000 $13.000 $25.000
ASPHALT STAB BASE (GR 2)(PG 64)
TON 494.450 $76.810 $80.000 $50.000 $77.250 $90.000 $110.000 $80.000
SALV, HAUL & STKPL RCL APH PV (0 TO 8")
SY 636.000 $4.000 $10.000 $9.000 $9.000 $5.000 $12.000 $5.000
D-GR HMA(SQ) TY-C PG58-28
TON 60.470 $119.750 $200.000 $248.050 $185.000 $150.000 $165.000 $85.000
D-GR HMA(SQ) TY-D SAC-A PG70-22
TON 60.470 $135.150 $200.000 $248.050 $194.000 $150.000 $140.000 $90.000
CEM STABIL BKFL
CY 103.000 $40.130 $65.000 $150.000 $146.000 $50.000 $45.000 $100.000
DRILL SHAFT (30 IN)
LF 376.000 $220.000 $180.000 $180.000 $160.000 $230.000 $180.000 $295.000
CL C CONC (ABUT)
CY 37.000 $812.970 $1,200.000 $1,500.000 $820.000 $1,500.000 $1,200.000 $1,750.000
REINF CONC SLAB
SF 2,219.000 $13.500 $22.000 $30.000 $23.500 $20.000 $27.000 $40.000
APPROACH SLAB
CY 47.400 $537.000 $750.000 $600.000 $460.000 $600.000 $575.000 $550.000
PRESTR CONC GIRDER (TX28)
LF 278.000 $146.850 $130.000 $183.960 $200.000 $180.000 $220.000 $175.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 25.000 $407.570 $500.000 $320.000 $420.000 $300.000 $585.000 $400.000
RIPRAP (STONE PROTECTION)(15 IN)
CY 150.000 $152.250 $150.000 $150.000 $135.000 $0.010 $215.000 $40.000
RAIL (TY T221)
LF 188.000 $80.000 $100.000 $120.000 $102.000 $80.000 $75.000 $165.000
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
LF 63.000 $67.000 $100.000 $100.000 $97.000 $53.000 $78.000 $150.000
REMOV STR (WINGWALL)
EA 2.000 $2,036.000 $1,500.000 $5,000.000 $1,400.000 $6,000.000 $1,900.000 $2,325.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $35,875.000 $20,000.000 $10,000.000 $14,000.000 $60,000.000 $18,600.000 $50,000.000
MOBILIZATION
LS 1.000 $45,320.000 $50,000.000 $75,000.000 $123,400.000 $55,000.000 $58,000.000 $20,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $6,536.620 $2,000.000 $333.330 $970.000 $6,000.000 $2,300.000 $7,500.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $29.650 $40.000 $25.000 $27.000 $30.000 $22.000 $35.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $7.330 $5.000 $10.000 $10.000 $8.000 $7.300 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 650.000 $2.850 $4.000 $4.000 $4.300 $3.000 $4.000 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 650.000 $0.680 $1.000 $1.000 $1.000 $1.000 $2.600 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 72.000 $3.660 $6.000 $8.000 $8.600 $4.000 $4.750 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 72.000 $0.780 $1.000 $1.000 $1.000 $1.000 $1.000 $2.000
MTL W-BEAM GD FEN (TIM POST)
LF 100.000 $18.440 $25.000 $16.500 $17.740 $35.000 $22.000 $16.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,749.840 $2,000.000 $1,715.000 $1,840.000 $1,550.000 $2,400.000 $1,715.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,841.810 $2,700.000 $2,425.000 $2,600.000 $2,600.000 $2,950.000 $2,425.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $500.000 $650.000 $455.000 $490.000 $570.000 $650.000 $455.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $650.000 $650.000 $485.000 $520.000 $700.000 $800.000 $485.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $15.000 $10.000 $25.000 $27.000 $20.000 $22.000 $25.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 4.000 $108.000 $65.000 $48.000 $52.000 $75.000 $40.000 $48.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $45.000 $25.000 $30.000 $35.000 $30.000 $31.000 $30.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 720.000 $0.500 $1.500 $0.750 $1.310 $0.750 $0.800 $1.220
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 720.000 $0.500 $1.500 $0.750 $1.310 $0.750 $0.800 $1.220
REFL PAV MRKR TY II-A-A
EA 9.000 $5.000 $12.000 $10.000 $10.750 $10.000 $11.000 $10.000
PAV SURF PREP FOR MRK (6")
LF 1,440.000 $0.150 $1.200 $1.000 $0.480 $1.000 $1.100 $0.450
Totals: $504,943.820 $559,763.200 $579,062.267 $584,899.162 $591,838.600 $592,306.150 $639,966.950