County: WALLER Highway: FM 362 Date: 01/05/2024 (10 months ago) Engineer's Estimate: $4,339,195 Control Number: 0523-02-051
Project: C 523-2-51 District: HOUSTON Time: 76 WORKING DAYS Type: BASE REPAIR, 1.5" PLANING, 1.5" ACP OVERLAY
Bidder's List
Email All | Notice | Questions
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $4,339,194.89
DURWOOD GREENE CONSTRUCTION CO.   $4,087,471.73 1
-5.8% | -$251,723.16
TEXAS MATERIALS GROUP, INC.   $4,110,723.87 2
-5.27% | -$228,471.02
0.57% | $23,252.14
JAMES CONSTRUCTION GROUP, LLC   $4,168,872.92 3
-3.93% | -$170,321.97
1.99% | $81,401.19
1.41% | $58,149.05
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.   $4,210,289.71 4
-2.97% | -$128,905.18
3% | $122,817.98
0.99% | $41,416.79
FORDE CONSTRUCTION COMPANY, INC.   $4,983,973.59 5
14.86% | $644,778.70
21.93% | $896,501.86
18.38% | $773,683.88
Subcontractor Percentage Amount
TRAFFIC SIGNS & LINES, LLC 8.11% $331,493.96
BATTERSON, LLP 3.98% $162,681.37
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. 2.85% $116,492.94
TRAFFIC SYSTEMS CONSTRUCTION, INC. 1.40% $57,224.60
INTERSTATE BARRICADES & MARKINGS, INC. 0.37% $15,123.65
PROFESSIONAL TRAFFIC CONTROL LLC 0.33% $13,488.66
Total: 17.04% $696,505.18

Bid Items

Items: 79, 0 filtered
WALLER FM 362  |  HOUSTON  |  0523-02-051  |  01/05/2024  |  $4,339,195  |  C 523-2-51  |  BASE REPAIR, 1.5" PLANING, 1.5" ACP OVERLAY  |  76 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate DURWOOD GREENE CONSTRUCTION CO. TEXAS MATERIALS GROUP, INC. JAMES CONSTRUCTION GROUP, LLC CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. FORDE CONSTRUCTION COMPANY, INC.
110 6001 EXCAVATION (ROADWAY) CY 409.000 $25.000 $70.000 $177.000 $80.000 $100.000 $165.000
132 6006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 93.000 $21.000 $200.000 $75.000 $130.000 $200.000 $228.000
134 6004 BACKFILL (TY A OR B) STA 361.980 $245.000 $175.000 $214.000 $245.000 $300.000 $244.000
162 6002 BLOCK SODDING SY 928.000 $4.750 $10.000 $9.000 $7.000 $8.000 $7.400
162 6003 STRAW OR HAY MULCH SY 200.000 $0.700 $5.000 $2.000 $1.000 $2.000 $1.050
164 6009 BROADCAST SEED (TEMP) (WARM) SY 14.000 $0.500 $50.000 $11.000 $3.000 $10.000 $3.150
164 6051 DRILL SEED (TEMP)(WARM OR COOL) SY 186.000 $0.450 $10.000 $11.000 $2.000 $10.000 $2.100
166 6001 FERTILIZER AC 0.330 $1,040.000 $875.000 $1,300.000 $1,500.000 $1,200.000 $1,580.000
168 6001 VEGETATIVE WATERING MG 39.600 $35.000 $110.000 $157.000 $125.000 $100.000 $167.000
247 6056 FL BS (CMP IN PLC)(TY D GR 4)(FNAL POS) CY 44.000 $200.000 $175.000 $158.000 $425.000 $195.000 $685.000
292 6002 ASPHALT STAB BASE (GR 2)(PG 64) TON 817.930 $135.000 $125.000 $194.000 $195.000 $290.000 $160.000
316 6001 ASPH (MULTI OPTION) GAL 48,246.000 $5.250 $3.800 $2.750 $3.400 $3.900 $4.500
316 6434 AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B) CY 1,190.000 $250.000 $165.000 $125.000 $190.000 $175.000 $355.000
351 6002 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") SY 3,000.000 $75.000 $54.000 $54.000 $45.000 $65.000 $112.000
354 6045 PLANE ASPH CONC PAV (2") SY 141,606.000 $2.000 $2.500 $2.000 $1.900 $1.100 $3.050
429 6011 CONC STR REPR(REMOV AND REPL WINGWALL) CY 1.340 $3,000.000 $8,000.000 $12,000.000 $7,500.000 $500.000 $9,000.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 71.000 $500.000 $975.000 $1,100.000 $1,200.000 $1,200.000 $1,300.000
450 6018 RAIL (TY T631) LF 256.130 $105.000 $80.000 $88.000 $70.200 $130.000 $75.000
451 6004 RETROFIT RAIL (TY T131RC) LF 150.000 $250.000 $230.000 $335.000 $201.800 $300.000 $213.000
496 6099 REMOVE STR (RAIL) LF 370.000 $20.000 $7.000 $19.000 $4.750 $3.000 $5.000
500 6001 MOBILIZATION LS 1.000 $400,000.000 $200,000.000 $68,000.000 $270,000.000 $350,000.000 $215,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 $3,000.000 $5,000.000 $1,860.000 $14,500.000 $4,000.000 $21,000.000
510 6003 ONE-WAY TRAF CONT (PORT TRAF SIG) MO 1.000 $5,000.000 $5,500.000 $5,250.000 $5,000.000 $10,500.000 $15,000.000
512 6105 PCTB MOVE&RESET(F-SHAPE OR SNGL SLPTY1 LF 270.000 $10.000 $145.000 $23.000 $55.000 $120.000 $190.000
533 6003 RUMBLE STRIPS (SHOULDER) ASPHALT LF 80,075.000 $0.430 $0.150 $0.100 $0.700 $0.150 $0.140
533 6004 RUMBLE STRIPS (CENTERLINE) ASPHALT LF 35,958.000 $0.270 $0.150 $0.100 $0.760 $0.150 $0.140
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 2,562.500 $30.000 $26.000 $23.000 $22.700 $33.250 $26.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 22.000 $2,100.000 $2,500.000 $2,150.000 $1,885.000 $1,800.000 $1,800.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 1.000 $1,510.000 $1,600.000 $1,700.000 $1,450.000 $1,300.000 $1,650.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 1,793.500 $4.000 $3.000 $2.000 $2.000 $12.500 $2.250
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 5.000 $270.000 $270.000 $214.000 $230.000 $200.000 $243.000
542 6004 RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA 18.000 $250.000 $250.000 $160.000 $180.000 $200.000 $190.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 31.000 $3,225.000 $3,400.000 $3,160.000 $3,085.000 $2,950.000 $3,300.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 27.000 $265.000 $275.000 $214.000 $230.000 $200.000 $244.000
560 6011 MAILBOX INSTALL-S (TWW-POST) TY 4 EA 23.000 $310.000 $290.000 $250.000 $232.500 $200.000 $246.000
560 6012 MAILBOX INSTALL-D (TWW-POST) TY 4 EA 7.000 $375.000 $320.000 $290.000 $272.500 $240.000 $288.000
560 6013 MAILBOX INSTALL-M (TWW-POST) TY 4 EA 6.000 $670.000 $370.000 $335.000 $312.500 $575.000 $330.000
636 6007 REPLACE EXISTING ALUMINUM SIGNS(TY A) SF 18.000 $18.000 $30.000 $25.000 $23.000 $30.000 $25.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 49.000 $650.000 $550.000 $509.000 $475.600 $575.000 $503.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 16.000 $780.000 $700.000 $640.000 $595.500 $700.000 $530.000
644 6007 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 1.000 $665.000 $770.000 $660.000 $616.350 $725.000 $652.000
644 6030 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 16.000 $1,100.000 $900.000 $825.000 $768.230 $850.000 $813.000
644 6033 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 5.000 $975.000 $1,200.000 $1,100.000 $1,013.800 $925.000 $1,080.000
644 6034 IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT) EA 1.000 $1,080.000 $1,100.000 $1,050.000 $961.310 $950.000 $1,018.000
644 6036 IN SM RD SN SUP&AM TYS80(1)SA(U-BM) EA 3.000 $1,185.000 $950.000 $890.000 $824.140 $1,000.000 $873.000
644 6076 REMOVE SM RD SN SUP&AM EA 90.000 $92.500 $75.000 $59.000 $55.000 $75.000 $58.000
658 6002 INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI) EA 51.000 $48.000 $90.000 $80.000 $75.000 $45.000 $172.000
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 47.000 $25.000 $20.000 $12.000 $11.000 $20.000 $12.000
658 6047 INSTL OM ASSM (OM-2Y)(WC)GND EA 28.000 $78.000 $100.000 $91.000 $85.000 $55.000 $160.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 121.000 $39.000 $18.750 $16.000 $15.000 $25.000 $64.000
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 77,764.000 $0.350 $0.300 $0.300 $0.300 $0.270 $0.300
662 6008 WK ZN PAV MRK NON-REMOV (W)6"(SLD) LF 85,930.000 $0.500 $0.350 $0.300 $0.400 $0.300 $0.320
662 6012 WK ZN PAV MRK NON-REMOV (W)8"(SLD) LF 938.000 $0.680 $0.600 $0.500 $1.000 $0.600 $0.900
662 6014 WK ZN PAV MRK NON-REMOV (W)12"(SLD) LF 31.000 $2.500 $1.500 $2.000 $2.000 $1.500 $3.700
662 6016 WK ZN PAV MRK NON-REMOV (W)24"(SLD) LF 801.000 $3.000 $3.000 $3.000 $4.000 $3.000 $4.750
662 6017 WK ZN PAV MRK NON-REMOV (W)(ARROW) EA 1.000 $64.000 $85.000 $86.000 $95.000 $85.000 $133.000
662 6023 WK ZN PAV MRK NON-REMOV (W)(RR XING) EA 1.000 $78.000 $250.000 $300.000 $250.000 $250.000 $396.000
662 6029 WK ZN PAV MRK NON-REMOV(W)(WORD) EA 1.000 $78.000 $100.000 $86.000 $95.000 $100.000 $154.000
662 6032 WK ZN PAV MRK NON-REMOV (Y)4"(BRK) LF 6,750.000 $0.350 $0.300 $0.300 $0.400 $0.270 $0.300
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 32,598.000 $0.350 $0.300 $0.300 $0.320 $0.270 $0.300
662 6035 WK ZN PAV MRK NON-REMOV (Y)6"(BRK) LF 7,420.000 $0.500 $0.350 $0.300 $0.500 $0.300 $0.320
662 6037 WK ZN PAV MRK NON-REMOV (Y)6"(SLD) LF 37,177.000 $0.500 $0.350 $0.300 $0.420 $0.300 $0.320
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 503.000 $1.900 $0.900 $1.500 $1.550 $0.900 $1.050
666 6042 REFL PAV MRK TY I (W)12"(SLD)(100MIL) LF 31.000 $4.700 $3.000 $7.500 $4.000 $3.000 $4.200
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 645.000 $8.000 $6.000 $11.000 $8.500 $6.000 $8.500
666 6054 REFL PAV MRK TY I (W)(ARROW)(100MIL) EA 1.000 $210.000 $165.000 $190.000 $200.000 $165.000 $280.000
666 6078 REFL PAV MRK TY I (W)(WORD)(100MIL) EA 1.000 $205.000 $200.000 $190.000 $550.000 $200.000 $313.000
666 6093 REFL PAV MRK TY I (W)(RR XING)(100MIL) EA 1.000 $417.000 $500.000 $450.000 $200.000 $500.000 $524.000
666 6309 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) LF 85,930.000 $1.100 $0.600 $0.600 $0.650 $0.600 $0.600
666 6318 RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL) LF 7,420.000 $0.750 $0.600 $0.600 $0.800 $0.600 $0.600
666 6321 RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) LF 37,177.000 $0.880 $0.600 $0.600 $0.680 $0.600 $0.600
672 6007 REFL PAV MRKR TY I-C EA 10.000 $6.580 $6.000 $7.000 $4.500 $6.000 $5.800
672 6009 REFL PAV MRKR TY II-A-A EA 834.000 $6.880 $6.000 $7.000 $4.500 $6.000 $5.800
3076 6041 D-GR HMA TY-D SAC-A PG70-22 TON 13,574.490 $129.000 $142.000 $161.000 $130.000 $135.000 $150.000
3076 6076 D-GR HMA TY-D SAC-A PG70-22 (EXEMPT) TON 23.830 $205.000 $200.000 $700.000 $525.000 $420.000 $403.000
6185 6002 TMA (STATIONARY) DAY 87.000 $165.000 $50.000 $89.000 $215.000 $180.000 $200.000
6185 6005 TMA (MOBILE OPERATION) DAY 160.000 $400.000 $50.000 $205.000 $400.000 $180.000 $150.000
6350 6001 LEAD LED CHEVRON EA 1.000 $4,000.000 $6,500.000 $4,800.000 $5,025.000 $4,500.000 $6,500.000
6350 6002 LED CHEVRON EA 11.000 $2,650.000 $5,500.000 $4,300.000 $8,985.000 $4,000.000 $5,300.000
Totals: $4,339,194.89 $4,087,471.73 $4,110,723.87 $4,168,872.93 $4,210,289.72 $4,983,973.60