Job Info for 0523-02-050

County: WALLER Highway: FM 362 Date: 03/04/2022 (2 years ago) Engineer's Estimate: $3,687,425 Control Number: 0523-02-050
Project: C 523-2-50 District: HOUSTON Time: 64 WORKING DAYS Type: BASE REPAIR, PLANING, SEAL COAT, 1.5" PFC OL
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6
Plans

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $3,687,425.40
DURWOOD GREENE CONSTRUCTION CO.   $3,607,335.29 1
-2.17% | -$80,090.11
JAMES CONSTRUCTION GROUP, LLC   $3,646,425.28 2
-1.11% | -$41,000.12
1.08% | $39,089.99
TEXAS MATERIALS GROUP, INC.   $3,673,910.17 3
-0.37% | -$13,515.23
1.85% | $66,574.88
0.75% | $27,484.89
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.   $3,687,199.24 4
-0.01% | -$226.16
2.21% | $79,863.95
0.36% | $13,289.07
KNIFE RIVER CORPORATION - SOUTH   $3,961,606.80 5
7.44% | $274,181.40
9.82% | $354,271.51
7.44% | $274,407.56
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC   $4,799,103.62 6
30.15% | $1,111,678.22
33.04% | $1,191,768.33
21.14% | $837,496.82

Bid Items

Items: 71, 0 filtered
WALLER FM 362  |  HOUSTON  |  0523-02-050  |  03/04/2022  |  $3,687,425  |  C 523-2-50  |  BASE REPAIR, PLANING, SEAL COAT, 1.5" PFC OL  |  64 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate DURWOOD GREENE CONSTRUCTION CO. JAMES CONSTRUCTION GROUP, LLC TEXAS MATERIALS GROUP, INC. CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. KNIFE RIVER CORPORATION - SOUTH VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC
110 6001 EXCAVATION (ROADWAY) CY 177.000 $6.910 $40.000 $10.000 $70.000 $180.000 $39.000 $67.000
132 6006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 177.000 $7.190 $40.000 $10.000 $48.000 $180.000 $83.000 $67.000
134 6004 BACKFILL (TY A OR B) STA 437.680 $164.380 $100.000 $93.000 $210.000 $180.000 $107.350 $149.000
162 6002 BLOCK SODDING SY 1,595.000 $2.960 $4.500 $5.000 $4.000 $5.000 $5.430 $5.500
162 6003 STRAW OR HAY MULCH SY 38.000 $0.190 $10.000 $10.000 $6.000 $10.000 $11.000 $11.500
164 6009 BROADCAST SEED (TEMP) (WARM) SY 24.000 $0.100 $5.000 $10.000 $5.000 $10.000 $11.000 $11.500
164 6051 DRILL SEED (TEMP)(WARM OR COOL) SY 14.000 $0.090 $5.000 $75.000 $2.000 $75.000 $82.000 $85.500
166 6001 FERTILIZER AC 0.420 $553.730 $1,200.000 $1,200.000 $100.000 $1,200.000 $1,303.000 $1,367.000
168 6001 VEGETATIVE WATERING MG 50.400 $18.670 $40.000 $46.000 $30.000 $20.000 $60.000 $281.000
247 6056 FL BS (CMP IN PLC)(TY D GR 4)(FNAL POS) CY 30.000 $79.670 $150.000 $161.000 $266.000 $305.000 $173.000 $438.000
292 6002 ASPHALT STAB BASE (GR 2)(PG 64) TON 251.360 $83.730 $100.000 $130.000 $128.000 $140.000 $235.000 $164.000
316 6001 ASPH (MULTI OPTION) GAL 34,869.000 $2.990 $3.450 $3.600 $3.600 $3.800 $3.790 $3.500
316 6434 AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B) CY 895.000 $124.240 $130.000 $137.000 $200.000 $144.000 $214.000 $175.000
342 6002 PFC (ASPHALT) PG76-22 TON 484.020 $110.000 $155.000 $138.500 $150.000 $160.000 $153.000 $170.000
342 6006 PFC-C (AGGREGATE)(PG76 MIX) SAC-A TON 6,961.380 $128.190 $155.000 $138.500 $150.000 $160.000 $153.000 $170.000
351 6002 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") SY 10,800.000 $42.000 $10.000 $35.000 $33.000 $36.000 $38.460 $82.500
354 6041 PLANE ASPH CONC PAV (1.5") SY 78,054.000 $1.070 $2.000 $1.550 $1.300 $1.150 $1.000 $2.500
354 6045 PLANE ASPH CONC PAV (2") SY 107,698.000 $2.150 $2.500 $1.800 $1.400 $1.450 $1.000 $3.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 91.000 $482.330 $750.000 $438.000 $600.000 $625.000 $600.000 $510.000
500 6001 MOBILIZATION LS 1.000 $322,000.000 $125,000.000 $203,000.000 $110,000.000 $100,000.000 $180,000.001 $100,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.000 $16,000.000 $4,000.000 $16,500.000 $3,000.000 $2,500.000 $16,000.000 $28,535.000
533 6003 RUMBLE STRIPS (SHOULDER) ASPHALT LF 74,371.000 $0.140 $0.250 $0.210 $0.100 $0.200 $0.100 $0.100
533 6004 RUMBLE STRIPS (CENTERLINE) ASPHALT LF 43,361.000 $0.140 $0.250 $0.260 $0.100 $0.200 $0.130 $0.100
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 1,500.000 $24.730 $25.000 $22.180 $24.000 $28.650 $24.100 $28.500
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 4.000 $1,872.800 $2,200.000 $1,859.000 $1,900.000 $1,950.000 $2,020.000 $2,449.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 1,500.000 $2.330 $2.000 $1.900 $2.000 $0.950 $2.000 $2.500
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 14.000 $2,981.980 $3,500.000 $3,042.000 $3,200.000 $3,250.000 $3,305.000 $3,531.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 14.000 $196.990 $300.000 $261.000 $276.000 $275.000 $284.000 $171.000
560 6011 MAILBOX INSTALL-S (TWW-POST) TY 4 EA 40.000 $216.920 $250.000 $212.000 $225.000 $230.000 $230.000 $290.000
560 6012 MAILBOX INSTALL-D (TWW-POST) TY 4 EA 5.000 $218.750 $300.000 $228.000 $242.000 $320.000 $248.000 $370.000
560 6013 MAILBOX INSTALL-M (TWW-POST) TY 4 EA 11.000 $496.670 $700.000 $581.000 $616.000 $772.000 $631.000 $786.000
636 6007 REPLACE EXISTING ALUMINUM SIGNS(TY A) SF 9.000 $22.900 $26.000 $23.210 $25.000 $20.000 $26.000 $30.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 136.000 $409.630 $500.000 $440.000 $466.000 $475.000 $478.000 $484.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 7.000 $597.600 $600.000 $547.000 $580.000 $600.000 $594.000 $621.000
644 6027 IN SM RD SN SUP&AM TYS80(1)SA(P) EA 2.000 $649.370 $1,100.000 $998.000 $1,058.000 $1,100.000 $1,084.000 $1,128.000
644 6030 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 19.000 $715.780 $900.000 $817.000 $866.000 $925.000 $888.000 $917.000
644 6033 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 11.000 $753.080 $1,100.000 $991.000 $1,050.000 $1,112.000 $1,077.000 $1,185.000
644 6036 IN SM RD SN SUP&AM TYS80(1)SA(U-BM) EA 1.000 $979.430 $950.000 $873.000 $925.000 $1,150.000 $949.000 $1,156.000
644 6076 REMOVE SM RD SN SUP&AM EA 184.000 $59.330 $50.000 $42.000 $44.000 $52.000 $46.000 $62.500
658 6016 INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI) EA 35.000 $40.060 $35.000 $30.000 $31.000 $30.000 $33.000 $28.500
658 6026 INSTL DEL ASSM (D-SY)SZ (BRF)CTB EA 6.000 $26.320 $25.000 $20.000 $21.000 $30.000 $22.000 $27.500
658 6047 INSTL OM ASSM (OM-2Y)(WC)GND EA 28.000 $55.240 $70.000 $60.000 $63.000 $65.000 $65.000 $74.000
658 6081 INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI) EA 38.000 $74.180 $90.000 $80.000 $63.000 $75.000 $87.000 $68.500
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 91,408.000 $0.230 $0.280 $0.260 $0.260 $0.260 $0.280 $0.300
662 6008 WK ZN PAV MRK NON-REMOV (W)6"(SLD) LF 91,408.000 $0.240 $0.280 $0.260 $0.260 $0.260 $0.280 $0.300
662 6012 WK ZN PAV MRK NON-REMOV (W)8"(SLD) LF 788.000 $0.360 $0.500 $0.420 $0.420 $0.420 $0.460 $0.500
662 6014 WK ZN PAV MRK NON-REMOV (W)12"(SLD) LF 96.000 $0.860 $2.000 $1.500 $1.500 $1.500 $1.630 $1.500
662 6016 WK ZN PAV MRK NON-REMOV (W)24"(SLD) LF 386.000 $1.810 $3.500 $3.000 $3.000 $3.000 $3.260 $3.500
662 6017 WK ZN PAV MRK NON-REMOV (W)(ARROW) EA 6.000 $47.100 $60.000 $55.000 $55.000 $55.000 $60.000 $62.500
662 6029 WK ZN PAV MRK NON-REMOV(W)(WORD) EA 6.000 $50.040 $60.000 $55.000 $55.000 $55.000 $60.000 $62.500
662 6032 WK ZN PAV MRK NON-REMOV (Y)4"(BRK) LF 8,645.000 $0.250 $0.280 $0.260 $0.260 $0.450 $0.280 $0.300
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 42,941.000 $0.240 $0.280 $0.260 $0.260 $0.260 $0.280 $0.300
662 6035 WK ZN PAV MRK NON-REMOV (Y)6"(BRK) LF 8,645.000 $0.240 $0.280 $0.260 $0.260 $0.260 $0.280 $0.300
662 6037 WK ZN PAV MRK NON-REMOV (Y)6"(SLD) LF 42,941.000 $0.250 $0.280 $0.260 $0.260 $0.260 $0.280 $0.300
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 394.000 $0.810 $1.000 $0.800 $1.060 $0.800 $0.870 $0.900
666 6042 REFL PAV MRK TY I (W)12"(SLD)(100MIL) LF 48.000 $2.370 $4.000 $3.500 $3.700 $3.500 $3.800 $4.000
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 193.000 $4.940 $8.000 $7.000 $7.000 $7.000 $7.600 $8.000
666 6054 REFL PAV MRK TY I (W)(ARROW)(100MIL) EA 3.000 $70.400 $130.000 $125.000 $125.000 $125.000 $136.000 $142.000
666 6078 REFL PAV MRK TY I (W)(WORD)(100MIL) EA 3.000 $77.630 $150.000 $135.000 $135.000 $135.000 $147.000 $154.000
666 6309 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) LF 91,408.000 $0.460 $0.500 $0.490 $0.490 $0.490 $0.530 $0.550
666 6318 RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL) LF 8,645.000 $0.440 $0.500 $0.490 $0.490 $0.450 $0.530 $0.550
666 6321 RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) LF 42,941.000 $0.510 $0.500 $0.490 $0.490 $0.490 $0.530 $0.550
672 6007 REFL PAV MRKR TY I-C EA 46.000 $4.280 $4.000 $4.000 $4.250 $4.000 $4.350 $4.500
672 6009 REFL PAV MRKR TY II-A-A EA 1,042.000 $4.190 $4.000 $4.000 $4.250 $4.000 $4.350 $4.500
685 6003 REMOVE RDSD FLASH BEACON ASSEMBLY EA 2.000 $295.060 $1,000.000 $750.000 $780.000 $750.000 $815.000 $854.000
3076 6041 D-GR HMA TY-D SAC-A PG70-22 TON 6,440.530 $110.000 $130.000 $105.000 $125.000 $113.000 $125.500 $125.000
3076 6049 D-GR HMA TY-D SAC-A PG76-22 TON 312.990 $100.000 $180.000 $157.000 $210.000 $110.000 $146.000 $293.000
3076 6066 TACK COAT GAL 8,592.000 $2.590 $2.000 $2.300 $3.000 $3.500 $3.150 $3.500
6185 6002 TMA (STATIONARY) DAY 22.000 $281.400 $400.000 $298.000 $130.000 $75.000 $500.000 $294.000
6185 6005 TMA (MOBILE OPERATION) DAY 154.000 $423.880 $50.000 $648.000 $15.000 $75.000 $800.000 $28.500
6350 6001 LEAD LED CHEVRON EA 1.000 $4,500.000 $9,500.000 $8,500.000 $9,500.000 $8,500.000 $9,300.000 $9,683.000
Totals: $3,687,425.40 $3,607,335.29 $3,646,425.28 $3,673,910.17 $3,687,199.24 $3,961,606.81 $4,799,103.62