Job Info for 6466-06-001

County: WALKER Highway: IH0045 Date: 07/23/2024 (4 months ago) Engineer's Estimate: $240,000 Control Number: 6466-06-001
Project: MMC - 646606001 District: BRYAN Time: 180 CALENDAR DAYS Type: FLEXIBLE BASE
Notice | Questions
HCS
Pay Estimates: 1 | 2 | 3
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $240,000.00
TOUCHSTONE RESOURCES, LLC   $228,000.00 1
-5% | -$12,000.00
KNIFE RIVER CORPORATION - SOUTH   $316,875.00 2
32.03% | $76,875.00
38.98% | $88,875.00
COLORADO MATERIALS, LTD.   $353,760.00 3
47.4% | $113,760.00
55.16% | $125,760.00
11.64% | $36,885.00
MARTIN MARIETTA MATERIALS, INC.   $414,045.00 4
72.52% | $174,045.00
81.6% | $186,045.00
17.04% | $60,285.00

Bid Items

Items: 4, 0 filtered
WALKER IH0045  |  BRYAN  |  6466-06-001  |  07/23/2024  |  $240,000  |  MMC - 646606001  |  FLEXIBLE BASE  |  180 CALENDAR DAYS
Item code Description Unit Quantity Engineer's Estimate TOUCHSTONE RESOURCES, LLC KNIFE RIVER CORPORATION - SOUTH COLORADO MATERIALS, LTD. MARTIN MARIETTA MATERIALS, INC.
8007 6078 FL BS (SITE DEL) (TY A GR 1-2) (SITE 1) TON 1,500.000 $40.000 $47.000 $50.250 $58.250 $69.550
8007 6079 FL BS (SITE DEL) (TY A GR 1-2) (SITE 2) TON 1,500.000 $40.000 $35.000 $47.000 $52.790 $66.380
8007 6080 FL BS (SITE DEL) (TY A GR 1-2) (SITE 3) TON 1,500.000 $40.000 $35.000 $53.000 $59.560 $68.510
8007 6081 FL BS (SITE DEL) (TY A GR 1-2) (SITE 4) TON 1,500.000 $40.000 $35.000 $61.000 $65.240 $71.590
Totals: $240,000.00 $228,000.00 $316,875.00 $353,760.00 $414,045.00