County: WALKER Highway: SH0030 Date: 02/05/2019 (5 years ago) Engineer's Estimate: $441,225 Control Number: 6340-77-001
Project: RMC - 634077001 District: BRYAN Time: 730 W Type: SPOT BASE REPAIR

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $441,225.00
ISI CONTRACTING, INC.   $513,435.00 1
16.37% | $72,210.00

Bid Items

Items: 35, 0 filtered
WALKER SH0030  |  BRYAN  |  6340-77-001  |  02/05/2019  |  $441,225  |  RMC - 634077001  |  SPOT BASE REPAIR  |  730 W
Item code Description Unit Quantity Engineer's Estimate ISI CONTRACTING, INC.
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 30.000 $800.000 $600.000
500 6033 MOBILIZATION (CALLOUT) EA 100.000 $200.000 $400.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 9.000 $2,400.000 $2,500.000
540 6010 MTL W-BEAM GD FEN ADJUSTMENT LF 150.000 $10.000 $10.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 10.000 $1,100.000 $1,500.000
770 6001 REPAIR RAIL ELEMENT (W - BEAM) LF 4,500.000 $18.000 $15.000
770 6002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF 75.000 $50.000 $15.000
770 6003 REP RAIL ELMNT(THRIE-BM TRANS TO W -BM) LF 40.000 $50.000 $15.000
770 6004 REPAIR RAIL ELEMENT (CURVED RAIL) LF 75.000 $50.000 $25.000
770 6006 RAISE RAIL ELEMENT LF 75.000 $8.000 $10.000
770 6010 REM / REPL TIMBER/STL POST W/O CONC FND EA 225.000 $45.000 $40.000
770 6011 REM / REPL TIMBER / STL POST W/CONC FND EA 10.000 $55.000 $45.000
770 6016 REPAIR STEEL POST WITH BASE PLATE EA 10.000 $150.000 $250.000
770 6017 REALIGN POSTS EA 450.000 $8.000 $7.000
770 6019 REMOVE & REPLACE BLOCKOUT EA 15.000 $10.000 $10.000
770 6020 REPLACE STL BLOCKOUTS W /WOOD BLOCKOUTS EA 200.000 $10.000 $5.000
770 6021 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 450.000 $20.000 $28.000
770 6022 REPLACE SINGLE GDRAIL TERMINAL POST EA 50.000 $50.000 $50.000
770 6023 REPAIR OF TERMINAL ANCHORS POSTS EA 10.000 $50.000 $10.000
770 6024 REPLACE TERMINAL ANCHOR POSTS EA 10.000 $50.000 $10.000
770 6027 REMOVE GDRAIL END TRT / REPL WITH SGT EA 25.000 $2,900.000 $3,000.000
770 6028 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 15.000 $1,050.000 $1,000.000
770 6029 REM & RESET SGT IMPACT HEAD EA 25.000 $500.000 $125.000
770 6030 REPLACE SGT CABLE ASSEMBLY EA 6.000 $75.000 $110.000
770 6031 REPLACE SGT CABLE ANCHOR EA 5.000 $65.000 $100.000
770 6032 REPLACE SGT STRUT EA 6.000 $50.000 $100.000
770 6033 REPLACE SGT OBJECT MARKER EA 5.000 $30.000 $30.000
771 6002 REPLACE POSTS (TL-4) EA 800.000 $80.000 $200.000
771 6004 CABLE SPLICE / TURNBUCKLE (TL-4) EA 15.000 $95.000 $550.000
771 6006 REPAIR CONCRETE FOUNDATION (TL-4) EA 125.000 $270.000 $30.000
771 6008 REPR OR REPLC CABLE BARR TERM SEC(TL-4) EA 10.000 $345.000 $1,500.000
771 6010 REPLACE CABLE (TL-4) LF 500.000 $6.000 $3.000
771 6012 REPLACE POST HARDWARE (TL-4) EA 150.000 $20.000 $25.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 10.000 $100.000 $75.000
6185 6002 TMA (STATIONARY) DAY 100.000 $300.000 $250.000
Totals: $441,225.00 $513,435.00