WALKER SH 75 (0110-01-049)

Items: 77

County: WALKER
Length: N/A
Highway: SH 75
District: BRYAN
Control Number: 0110-01-049
DBE Goal: N/A
Project: F 2021(717)
Guaranty: N/A
Time: 47 WORKING DAYS
Engineer's Estimate: $908,262.39
Date: 07/01/2021 (4 years ago)
Contract Number: N/A
Type: INTERSECTION IMPROVEMENTS WITH TURN LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (5)
E
Engineer's Estimate
$908,262.39
Over/Under Est: 4.2% $38,159.34
Over/Under Est: 8.33% $75,613.31
Amt Left: 3.96% $37,453.97
Over/Under Est: 8.53% $77,495.62
Amt Left: 4.16% $39,336.28
Delta: -0.19% -$1,882.31
Over/Under Est: 13.61% $123,632.82
Amt Left: 9.03% $85,473.48
Delta: -4.68% -$46,137.20
$1,041,093.16
Over/Under Est: 14.62% $132,830.77
Amt Left: 10% $94,671.43
Delta: -0.89% -$9,197.95
Subcontractor Percentage Amount
STRIPE LINES, INC. 4.34% $53,554.27
J & M CONTRACTING, COMPANY 3.11% $38,376.44
COLD CREEK CONSTRUCTION, LTD 3.01% $37,142.47
CEN TEX HYDROSEED, INC. 2.25% $27,764.31
AREA WIDE PROTECTIVE, INC. 1.46% $18,015.95
STRIPE-A-ZONE, LLC 1.02% $12,586.49
Total: 15.19% $187,439.93

Bid Items & Bid Tabulations

77 Total 0 of 77
WALKER  |  SH 75  |  BRYAN  |  0110-01-049  |  07/01/2021  |  $908,262.39  |  F 2021(717)  |  INTERS IMPRVS WITH TURN LANES  |  47 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
BIG CREEK CONSTRUCTION, LTD.
KNIFE RIVER CORPORATION - SOUTH
ANGEL BROTHERS HOLDINGS CORP.
A. L. HELMCAMP, INC.
PREPARING ROW
STA 25.900 $590.000 $1,550.000 $1,600.000 $811.000 $750.000 $1,275.690
EXCAVATION (ROADWAY)
CY 5,204.000 $14.000 $11.000 $15.000 $11.500 $18.000 $8.460
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 2,595.000 $8.000 $9.000 $15.000 $15.000 $13.000 $14.030
FURNISHING AND PLACING TOPSOIL (4")
SY 10,120.000 $0.320 $2.000 $1.000 $1.800 $1.000 $2.350
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 10,120.000 $0.160 $0.400 $0.500 $0.430 $0.400 $0.420
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 10,120.000 $0.090 $0.250 $0.300 $0.270 $0.250 $0.260
VEGETATIVE WATERING
MG 102.000 $42.510 $20.000 $15.000 $48.000 $20.000 $20.890
FL BS (CMP IN PLC)(TY A GR 1-2)(9")
SY 1,014.000 $16.500 $36.600 $35.000 $22.000 $28.000 $28.440
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 17.000 $150.000 $200.000 $250.000 $205.000 $190.000 $169.410
LIME TRT (EXST MATL)(8")
SY 1,014.000 $3.170 $15.000 $8.000 $12.000 $13.000 $10.240
CEMENT
TON 72.000 $160.000 $185.000 $160.000 $152.000 $150.000 $152.720
CEMENT TREAT (SUBGRADE) (8")
SY 5,830.000 $2.540 $3.250 $3.000 $2.450 $3.000 $3.560
CEM TRT(PLNT MX)(CL M)(TY A)(GR 4)(8")
SY 5,830.000 $32.000 $24.650 $30.000 $22.200 $28.000 $24.140
ASPH (HFRS-2P)
GAL 3,246.000 $15.500 $4.500 $3.750 $5.300 $4.000 $6.200
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 86.000 $110.000 $110.000 $130.000 $212.000 $240.000 $345.460
PLANE ASPH CONC PAV (2")
SY 4,568.000 $1.800 $1.650 $2.000 $1.680 $1.200 $2.870
PLANE ASPH CONC PAV (3")
SY 6,852.000 $2.400 $1.200 $2.500 $2.320 $2.000 $2.870
CEM STABIL BKFL
CY 2.000 $132.000 $150.000 $250.000 $163.000 $160.000 $157.500
RC PIPE (CL III)(24 IN)
LF 120.000 $105.000 $120.000 $75.000 $130.000 $130.000 $126.000
RC PIPE (CL V)(24 IN)
LF 18.000 $120.000 $130.000 $95.000 $141.000 $140.000 $136.500
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 2.000 $1,370.000 $1,000.000 $1,030.000 $1,086.000 $1,000.000 $1,050.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 6.000 $1,308.000 $1,500.000 $1,550.000 $1,630.000 $1,600.000 $1,575.000
REMOV STR (SET)
EA 6.000 $1,000.000 $600.000 $410.000 $652.000 $650.000 $630.000
REMOV STR (HEADWALL)
EA 2.000 $1,000.000 $850.000 $750.000 $923.000 $900.000 $892.500
REMOV STR (PIPE)
LF 10.000 $11.000 $30.000 $55.000 $32.600 $32.000 $31.500
REMOV STR (PIPE)
EA 3.000 $420.000 $750.000 $550.000 $815.000 $800.000 $787.500
MOBILIZATION
LS 1.000 $64,640.000 $80,000.000 $92,500.000 $136,000.000 $92,000.000 $158,633.890
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $6,000.000 $1,500.000 $5,000.000 $11,000.000 $9,000.000 $3,252.860
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 300.000 $31.570 $28.000 $30.000 $30.000 $29.000 $29.400
ROCK FILTER DAMS (REMOVE)
LF 300.000 $7.930 $10.000 $10.000 $11.000 $10.000 $10.500
CONSTRUCTION PERIMETER FENCE
LF 35.000 $4.800 $5.000 $10.000 $6.000 $5.000 $26.670
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,750.000 $4.150 $2.750 $5.000 $3.460 $2.800 $2.890
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,750.000 $1.450 $0.750 $1.000 $0.810 $0.750 $0.790
DRIVEWAYS (ACP)
SY 298.000 $44.000 $50.800 $20.000 $71.000 $50.000 $59.380
TURNOUTS (ACP)
SY 8.000 $50.000 $1,400.000 $35.000 $294.000 $58.000 $397.270
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 1,047.000 $0.200 $13.000 $5.000 $4.350 $5.000 $7.240
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 1.000 $254.000 $260.000 $200.000 $274.000 $260.000 $264.600
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 13.000 $448.000 $500.000 $515.000 $541.000 $500.000 $522.900
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $460.000 $600.000 $650.000 $644.000 $600.000 $622.650
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 2.000 $635.000 $850.000 $800.000 $900.000 $850.000 $872.550
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $689.000 $810.000 $1,000.000 $870.000 $820.000 $840.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $762.000 $975.000 $1,000.000 $1,032.000 $1,000.000 $997.500
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 2.000 $906.000 $975.000 $1,000.000 $1,034.000 $1,000.000 $999.600
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $481.000 $650.000 $1,100.000 $700.000 $650.000 $679.350
REMOVE SM RD SN SUP&AM
EA 9.000 $81.930 $125.000 $75.000 $100.000 $80.000 $105.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 6.000 $81.930 $30.000 $20.000 $27.000 $25.000 $26.250
INSTL DEL ASSM (D-SY)SZ 1(YFLX)SRF
EA 6.000 $102.000 $70.000 $75.000 $71.000 $65.000 $68.250
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 4.000 $2.850 $10.000 $4.000 $11.000 $10.000 $10.500
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 8,007.000 $0.800 $0.700 $1.000 $0.760 $0.700 $0.740
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 65.000 $1.700 $1.400 $1.500 $1.520 $1.500 $1.470
WK ZN PAV MRK REMOV (W)(ARROW)
EA 1.000 $190.000 $110.000 $150.000 $120.000 $110.000 $115.500
WK ZN PAV MRK REMOV (W)(WORD)
EA 1.000 $190.000 $110.000 $150.000 $120.000 $110.000 $115.500
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 6,130.000 $0.740 $0.700 $0.900 $0.760 $0.750 $0.740
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 88.000 $0.850 $1.000 $1.000 $1.000 $1.400 $0.470
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 127.000 $1.600 $1.000 $1.000 $1.000 $1.400 $0.470
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 156.000 $2.000 $0.950 $3.000 $1.030 $1.000 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,624.000 $1.370 $0.950 $1.000 $1.030 $1.000 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 33.000 $5.320 $8.900 $7.500 $10.000 $9.000 $9.350
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 7.000 $153.000 $125.000 $150.000 $136.000 $130.000 $131.250
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 7.000 $158.000 $125.000 $150.000 $136.000 $130.000 $131.250
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 280.000 $0.750 $0.650 $0.500 $0.710 $0.700 $0.680
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 1,112.000 $0.420 $0.650 $0.500 $0.710 $0.700 $0.680
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,053.000 $0.380 $0.650 $0.500 $0.710 $0.700 $0.680
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 5,366.000 $0.580 $0.900 $0.800 $0.970 $0.900 $0.930
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 6,918.000 $3.000 $0.900 $0.800 $0.970 $0.900 $0.930
PREFAB PAV MRK TY B (W)(ARROW)
EA 4.000 $500.000 $300.000 $400.000 $322.000 $300.000 $310.800
REFL PAV MRKR TY I-C
EA 84.000 $4.000 $4.000 $4.100 $4.350 $4.000 $4.200
REFL PAV MRKR TY II-A-A
EA 276.000 $4.000 $4.000 $4.100 $4.350 $4.000 $4.200
REFL PAV MRKR TY II-C-R
EA 73.000 $4.530 $4.000 $4.100 $4.350 $4.000 $4.200
ELIM EXT PAV MRK & MRKS (4")
LF 12,698.000 $0.700 $0.260 $0.400 $0.280 $0.270 $0.270
ELIM EXT PAV MRK & MRKS (8")
LF 65.000 $0.630 $0.360 $1.000 $0.390 $0.370 $0.380
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
LF 240.000 $4.700 $1.200 $1.000 $1.300 $8.000 $1.260
SP MIXES SP-C SAC-A PG70-22
TON 2,715.000 $84.000 $105.000 $97.000 $93.000 $115.000 $99.830
TACK COAT
GAL 1,831.000 $2.000 $3.000 $3.000 $4.190 $2.600 $3.590
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 240.000 $26.000 $10.000 $6.000 $10.300 $27.000 $5.250
TMA (STATIONARY)
DAY 10.000 $180.000 $80.000 $160.000 $400.000 $150.000 $503.460
TMA (MOBILE OPERATION)
DAY 6.000 $128.000 $80.000 $165.000 $700.000 $150.000 $824.430
Totals: $908,262.390 $946,421.730 $983,875.700 $985,758.010 $1,031,895.210 $1,041,093.161