Show Job Controls
Bid Cobra

VICTORIA US0059 (6428-98-001)

Items: 39

County: VICTORIA
Length: N/A
Highway: US0059
District: YOAKUM
Control Number: 6428-98-001
DBE Goal: N/A
Project: RMC - 642898001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $1,106,625.00
Date: 02/01/2023 (3 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
MARK NETARDUS
MICHAEL BRZOZOWSKI
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (5)
E
Engineer's Estimate
$1,106,625.00
$754,615.00
Over/Under Est: -31.81% -$352,010.00
Over/Under Est: -31.3% -$346,365.00
Amt Left: 0.75% $5,645.00
Over/Under Est: -24.52% -$271,310.00
Amt Left: 10.69% $80,700.00
Delta: -9.87% -$75,055.00
Over/Under Est: -3.77% -$41,725.00
Amt Left: 41.12% $310,285.00
Delta: -27.48% -$229,585.00
Over/Under Est: 37.69% $417,071.25
Amt Left: 101.92% $769,081.25
Delta: -43.08% -$458,796.25

Bid Items & Bid Tabulations

39 Total 0 of 39
VICTORIA  |  US0059  |  YOAKUM  |  6428-98-001  |  02/01/2023  |  $1,106,625.00  |  RMC - 642898001  |  METAL BEAM GUARD FENCE REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JCW CONSTRUCTION, LLC
ABOVE ALL CONSTRUCTION
BK FIELD OPERATIONS LLC
GARRET SHIELDS INFRASTRUCTURE
B & MS CONSTRUCTION, INC.
MOBILIZATION (CALLOUT)
EA 24.000 $1,000.000 $1.000 $1.000 $1.000 $1,000.000 $7,500.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 5.000 $750.000 $1.000 $500.000 $300.000 $400.000 $690.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 60.000 $30.000 $30.000 $20.000 $20.000 $20.000 $11.500
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 60.000 $35.000 $30.000 $20.000 $20.000 $20.000 $34.500
REPAIR RAIL ELEMENT (W - BEAM)
LF 6,000.000 $27.000 $28.000 $25.000 $35.000 $50.000 $28.500
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 75.000 $50.000 $60.000 $25.000 $5.000 $10.000 $46.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 40.000 $35.000 $60.000 $50.000 $30.000 $200.000 $51.750
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 750.000 $25.000 $25.000 $1.000 $1.000 $10.000 $40.250
REM / REPL TIMBER/STL POST W/O CONC FND
EA 700.000 $50.000 $100.000 $80.000 $20.000 $100.000 $57.500
REM / REPL TIMBER / STL POST W/CONC FND
EA 150.000 $55.000 $40.000 $20.000 $20.000 $5.000 $97.750
REALIGN POSTS
EA 200.000 $35.000 $50.000 $50.000 $1.000 $50.000 $23.000
REMOVE & REPLACE BLOCKOUT
EA 350.000 $37.000 $75.000 $80.000 $160.000 $200.000 $23.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 600.000 $30.000 $25.000 $28.000 $22.000 $20.000 $46.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 75.000 $65.000 $200.000 $100.000 $160.000 $150.000 $74.750
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 50.000 $3,000.000 $3,000.000 $3,250.000 $3,750.000 $3,500.000 $4,600.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 20.000 $1,200.000 $850.000 $1,000.000 $700.000 $1,000.000 $1,725.000
REM & RESET SGT IMPACT HEAD
EA 20.000 $200.000 $1.000 $200.000 $50.000 $100.000 $172.500
REPLACE SGT CABLE ASSEMBLY
EA 20.000 $30.000 $1.000 $100.000 $40.000 $20.000 $97.500
REPLACE SGT CABLE ANCHOR
EA 20.000 $30.000 $1.000 $100.000 $50.000 $25.000 $97.500
REPLACE SGT STRUT
EA 50.000 $35.000 $1.000 $100.000 $1.000 $40.000 $97.500
REPLACE SGT OBJECT MARKER
EA 100.000 $35.000 $1.000 $1.000 $1.000 $1.000 $28.750
REPLACE POSTS (TL-3)
EA 1,000.000 $135.000 $0.100 $0.100 $0.100 $1.000 $125.000
REPLACE POSTS (TL-4)
EA 1,000.000 $140.000 $50.000 $200.000 $165.000 $180.000 $185.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 10.000 $100.000 $0.100 $0.100 $0.100 $50.000 $287.500
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 10.000 $100.000 $1.000 $300.000 $10.000 $140.000 $172.500
REPAIR CONCRETE FOUNDATION (TL-3)
EA 10.000 $100.000 $0.100 $1.000 $1.000 $10.000 $345.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 10.000 $100.000 $1.000 $1.000 $1.000 $10.000 $115.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 20.000 $1,500.000 $0.100 $1.000 $1.000 $50.000 $2,012.500
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 30.000 $2,000.000 $500.000 $1,300.000 $1,350.000 $800.000 $1,725.000
REPLACE CABLE (TL-3)
LF 750.000 $5.000 $0.100 $0.100 $0.100 $1.000 $7.480
REPLACE CABLE (TL-4)
LF 1,000.000 $5.000 $0.100 $5.000 $1.000 $1.000 $5.750
CHECK / RE-TENSION CABLE
EA 75.000 $300.000 $1.000 $1.000 $20.000 $50.000 $320.000
REPLACE POST HARDWARE (TL-4)
EA 2,000.000 $11.000 $1.000 $0.100 $0.100 $1.000 $25.000
REPLACE POST HARDWARE (TL-3)
EA 5,000.000 $10.000 $0.100 $0.100 $0.100 $1.000 $0.860
REPLACE CCT POST (5 FT 3 IN)
EA 10.000 $165.000 $0.100 $1.000 $100.000 $80.000 $172.500
REPLACE CCT POST (5 FT 11 IN)
EA 10.000 $165.000 $0.100 $1.000 $200.000 $85.000 $172.500
RMV/REPL(VIA-SAND FILL PLASTIC BARRELS)
EA 200.000 $325.000 $100.000 $10.000 $400.000 $400.000 $575.000
TMA (STATIONARY)
DAY 200.000 $150.000 $500.000 $1.000 $1.000 $100.000 $345.000
1 LANE CLOSURE-4 LANE ROAD
EA 12.000 $4,000.000 $5,000.000 $2,800.000 $2,000.000 $2,000.000 $5,175.000
Totals: $1,106,625.000 $754,615.000 $760,260.000 $835,315.000 $1,064,900.000 $1,523,696.250