VICTORIA FM 616 (0497-05-038)

Items: 68

County: VICTORIA
Length: N/A
Highway: FM 616
District: YOAKUM
Control Number: 0497-05-038
DBE Goal: N/A
Project: BR 2019(097)
Guaranty: N/A
Time: 180 WORKING DAYS
Engineer's Estimate: $1,286,383.70
Date: 10/03/2018 (7 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$1,286,383.70
$1,654,744.26
Over/Under Est: 28.64% $368,360.56
Over/Under Est: 31.52% $405,518.50
Amt Left: 2.25% $37,157.94
$2,459,638.70
Over/Under Est: 91.21% $1,173,255.00
Amt Left: 48.64% $804,894.44
Delta: -45.38% -$767,736.50

Bid Items & Bid Tabulations

68 Total 0 of 68
VICTORIA  |  FM 616  |  YOAKUM  |  0497-05-038  |  10/03/2018  |  $1,286,383.70  |  BR 2019(097)  |  REPLACE BRIDGE AND APPROACHES  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SB CONTRACTORS LLC
REXCO CONSTRUCTION SERVICES, INC.
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 21.030 $3,000.000 $1,800.000 $325.000 $5,700.000
EXCAVATION (ROADWAY)
CY 3,057.000 $8.000 $14.000 $16.490 $30.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 3,698.000 $14.000 $21.000 $20.480 $20.000
BLADING
HR 16.000 $95.000 $65.000 $85.000 $180.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 13,025.000 $0.500 $0.450 $0.290 $1.000
CELL FBR MLCH SEED(TEMP)(WARM)
SY 3,257.000 $0.500 $0.590 $0.270 $1.000
CELL FBR MLCH SEED(TEMP)(COOL)
SY 3,257.000 $0.500 $0.590 $0.270 $1.000
VEGETATIVE WATERING
MG 365.400 $20.000 $45.000 $19.120 $50.000
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 1,417.500 $75.000 $90.000 $78.010 $100.000
LIME TRT (EXST MATL) (6")
SY 6,029.800 $3.000 $5.000 $3.250 $3.500
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 71.500 $160.000 $170.000 $150.000 $185.000
ASPH (RC-250)
GAL 1,134.600 $4.000 $7.500 $7.000 $8.000
AGGR(TY-E GR-5 SAC-B)
CY 38.500 $120.000 $150.000 $325.200 $300.000
AGGR(TY-PE GR-3 SAC-B)
CY 150.600 $100.000 $135.000 $163.700 $300.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 5,203.200 $3.250 $4.250 $4.650 $8.000
D-GR HMA TY-D PG64-22
TON 647.200 $80.000 $105.000 $121.000 $120.000
D-GR HMA TY-D PG64-22(LEVEL-UP)
TON 282.100 $85.000 $105.000 $132.750 $200.000
CEM STABIL BKFL
CY 67.000 $125.000 $175.000 $106.800 $150.000
TEMPORARY SPL SHORING
SF 2,200.000 $10.000 $10.000 $24.000 $42.000
DRILL SHAFT (24 IN)
LF 765.000 $125.000 $183.000 $196.050 $180.000
CL C CONC (ABUT)
CY 26.000 $850.000 $1,500.000 $1,364.350 $1,000.000
CL C CONC (CAP)
CY 20.800 $850.000 $1,500.000 $2,966.690 $1,000.000
CL C CONC (COLUMN)
CY 8.400 $1,000.000 $1,600.000 $2,646.300 $1,000.000
REINF CONC SLAB (SLAB BEAM)
SF 4,788.000 $15.000 $20.500 $15.730 $35.000
APPROACH SLAB
CY 64.200 $500.000 $500.000 $441.710 $1,000.000
PRESTR CONC SLAB BEAM (4SB12)
LF 450.000 $125.000 $165.000 $174.620 $185.000
PRESTR CONC SLAB BEAM (5SB12)
LF 562.500 $150.000 $155.000 $174.620 $185.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,035.000 $100.000 $142.000 $149.600 $185.000
RAIL (TY T223)
LF 252.000 $110.000 $145.000 $160.890 $180.000
ARMOR JOINT (SEALED)
LF 76.000 $100.000 $75.000 $66.340 $150.000
RC PIPE (CL III)(24 IN)
LF 147.000 $85.000 $85.000 $79.390 $105.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 10.000 $1,200.000 $1,250.000 $1,244.660 $2,550.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $15,000.000 $15,000.000 $28,400.000 $90,000.000
REMOV STR (SMALL)
EA 6.000 $500.000 $1,000.000 $1,000.000 $2,500.000
MOBILIZATION
LS 1.000 $100,000.000 $164,000.000 $80,372.500 $220,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $2,500.000 $1,500.000 $2,088.600 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 150.000 $30.000 $36.450 $31.930 $30.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 123.000 $30.000 $39.500 $33.990 $30.000
ROCK FILTER DAMS (REMOVE)
LF 273.000 $8.000 $9.550 $7.210 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 370.000 $3.000 $4.300 $2.830 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 370.000 $1.000 $1.000 $1.030 $2.000
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
LF 1,140.000 $25.000 $22.500 $84.830 $65.000
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
LF 480.000 $10.000 $3.500 $28.500 $20.000
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
LF 660.000 $10.000 $15.000 $27.000 $20.000
DRIVEWAYS (SURF TREAT)
SY 281.000 $20.000 $25.000 $23.500 $42.000
MTL W-BEAM GD FEN (TIM POST)
LF 400.000 $24.000 $24.450 $22.090 $25.000
MTL THRIE-BEAM GD FEN (TIM POST)
EA 4.000 $1,400.000 $1,950.000 $1,594.440 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 750.000 $1.000 $2.500 $1.550 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,300.000 $2,945.000 $2,827.350 $2,850.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $100.000 $250.000 $206.000 $1,500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,200.000 $3,000.000 $1,030.000 $5,000.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $500.000 $2,000.000 $8,345.000 $2,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $10,000.000 $9,500.000 $1,250.000 $12,500.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 1.000 $180.000 $850.000 $195.190 $650.000
RELOCATE SM RD SN SUP&AM TY TWT
EA 1.000 $500.000 $500.000 $565.660 $250.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $18.000 $16.000 $13.390 $100.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 2.000 $50.000 $48.000 $40.170 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 14.000 $15.000 $16.000 $16.630 $100.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 6,234.000 $0.750 $0.850 $0.880 $2.000
WK ZN PAV MRK REMOV (Y)4"(BRK)
LF 440.000 $1.250 $0.850 $0.880 $2.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 4,206.000 $0.750 $0.850 $0.880 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 162.000 $1.500 $2.000 $2.030 $5.000
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 4,208.000 $0.500 $0.750 $0.770 $2.000
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 530.000 $0.800 $0.750 $0.770 $2.000
REFL PAV MRKR TY II-A-A
EA 53.000 $10.000 $10.000 $5.150 $15.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,000.000 $15,000.000 $12,875.000 $11,500.000
TMA (STATIONARY)
EA 2.000 $5,000.000 $5,000.000 $1,030.000 $12,500.000
TMA (MOBILE OPERATION)
DAY 4.000 $150.000 $750.000 $1,287.500 $250.000
Totals: $1,286,383.700 $1,654,744.260 $1,691,902.222 $2,459,638.700