Job Info for 0089-01-099

County: VICTORIA Highway: US 59 Date: 05/02/2024 (6 months ago) Engineer's Estimate: $2,709,350 Control Number: 0089-01-099
Project: C 89-1-99 District: YOAKUM Time: 117 WORKING DAYS Type: UPGRADE DYNAMIC MESSAGE SIGN BOARDS
Bidder's List
Email All | Notice | Questions
HCS
Pay Estimates: 1 | 2
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,709,350.00
ALLSTATE SIGNAL & CONSTRUCTION, LLC   $1,868,961.17 1
-31.02% | -$840,388.83
THIRD COAST SERVICES LLC   $2,122,751.64 2
-21.65% | -$586,598.36
13.58% | $253,790.47
SICE, INC.   $2,186,489.12 3
-19.3% | -$522,860.88
16.99% | $317,527.95
3.00% | $63,737.48
TRAF-TEX, INC.   $2,334,386.85 4
-13.84% | -$374,963.15
24.9% | $465,425.68
6.76% | $147,897.73
FLORIDA TRAFFIC CONTROL DEVICES, INC.   $2,597,468.28 5
-4.13% | -$111,881.72
38.98% | $728,507.11
11.27% | $263,081.43
THE LEVY COMPANY, INC.   $2,820,175.25 6
4.09% | $110,825.25
50.9% | $951,214.08
8.57% | $222,706.97

Bid Items

Items: 33, 0 filtered
VICTORIA US 59  |  YOAKUM  |  0089-01-099  |  05/02/2024  |  $2,709,350  |  C 89-1-99  |  UPGRADE DYNAMIC MESSAGE SIGN BOARDS  |  117 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate ALLSTATE SIGNAL & CONSTRUCTION, LLC THIRD COAST SERVICES LLC SICE, INC. TRAF-TEX, INC. FLORIDA TRAFFIC CONTROL DEVICES, INC. THE LEVY COMPANY, INC.
132 6005 EMBANKMENT (FINAL)(ORD COMP)(TY C) CY 3.000 $20.000 $1,750.000 $1,143.870 $794.228 $256.000 $108.950 $130.000
150 6002 BLADING HR 28.000 $300.000 $263.970 $183.840 $648.281 $167.000 $160.220 $400.000
247 6366 FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS) CY 96.000 $300.000 $220.000 $187.890 $451.245 $274.000 $307.620 $290.000
416 6005 DRILL SHAFT (42 IN) LF 189.000 $500.000 $539.480 $402.540 $677.699 $492.000 $798.190 $1,300.000
416 6006 DRILL SHAFT (48 IN) LF 270.000 $600.000 $551.360 $392.470 $798.561 $596.000 $890.780 $1,300.000
432 6001 RIPRAP (CONC)(4 IN) CY 9.000 $600.000 $640.000 $623.440 $1,640.873 $1,740.000 $1,903.400 $1,100.000
500 6001 MOBILIZATION LS 1.000 $250,000.000 $25,000.000 $212,275.160 $128,326.850 $58,375.000 $258,579.660 $282,300.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 8.000 $2,500.000 $1,945.000 $2,624.220 $12,328.547 $5,942.000 $1,140.820 $11,170.000
506 6022 CONSTRUCTION EXITS (INSTALL) (TY 3) SY 546.000 $50.000 $39.000 $6.280 $83.907 $27.150 $128.170 $65.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 546.000 $20.000 $11.540 $6.280 $41.162 $7.900 $64.090 $17.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 900.000 $10.000 $8.500 $5.470 $6.251 $6.100 $13.670 $5.750
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 900.000 $2.500 $4.000 $3.280 $0.634 $1.610 $7.510 $1.800
618 6007 CONDT (HDPE) (2") (STL ENCSE) LF 1,120.000 $60.000 $50.000 $32.620 $27.309 $72.500 $41.420 $90.000
618 6009 CONDT (HDPE) (3") LF 7,205.000 $50.000 $15.850 $6.570 $14.721 $24.000 $15.060 $12.500
618 6070 CONDT (RM) (2") LF 1,080.000 $60.000 $26.000 $28.710 $33.416 $34.000 $33.030 $5.000
620 6015 ELEC CONDR (NO.2) BARE LF 8,725.000 $5.000 $4.150 $3.350 $2.408 $3.610 $2.920 $3.350
620 6016 ELEC CONDR (NO.2) INSULATED LF 19,205.000 $5.000 $4.250 $3.970 $2.729 $4.660 $4.120 $3.600
624 6002 GROUND BOX TY A (122311)W/APRON EA 30.000 $1,400.000 $1,160.000 $1,340.130 $1,784.283 $1,368.000 $1,332.190 $1,300.000
628 6250 ELC SRV TY D 120/240 100(NS)SS(N)SP(O) EA 7.000 $7,500.000 $7,720.000 $6,318.020 $5,991.551 $8,989.000 $6,892.190 $8,100.000
650 6021 INS OH SN SUP(25 FT BAL TEE) EA 9.000 $45,000.000 $46,150.000 $69,625.390 $49,364.817 $68,919.000 $68,752.890 $76,500.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 21.000 $8,500.000 $235.000 $1,634.090 $4,151.430 $3,158.000 $366.230 $690.000
6007 6010 FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER) LF 2,180.000 $4.000 $4.850 $7.450 $8.415 $12.500 $11.450 $7.500
6007 6021 FIBER OPTIC SPLICE ENCLOSURE EA 19.000 $3,200.000 $2,505.000 $3,908.710 $1,929.626 $1,678.000 $832.400 $250.000
6007 6023 FIBER OPTIC PATCH PANEL (12 POSITION) EA 18.000 $1,600.000 $1,710.000 $3,996.610 $1,770.859 $836.000 $2,641.640 $1,200.000
6010 6002 CCTV FIELD EQUIPMENT (DIGITAL) EA 9.000 $9,700.000 $9,637.000 $8,998.110 $7,392.690 $7,026.000 $8,234.370 $9,600.000
6010 6003 CCTV FIELD CONTROLLER EA 9.000 $900.000 $755.000 $1,776.270 $612.205 $2,241.000 $656.460 $1.000
6028 6002 INSTALL DMS (FOUNDATION MTD CABINET) EA 9.000 $15,000.000 $13,205.000 $4,687.170 $11,044.352 $16,613.000 $13,831.790 $13,800.000
6064 6046 ITS POLE (55 FT)(90 MPH) EA 9.000 $28,000.000 $19,621.000 $20,059.030 $20,906.957 $20,223.000 $20,856.450 $23,800.000
6064 6080 ITS POLE MNT CAB (TY 2)(CONF 1) EA 9.000 $6,200.000 $5,445.000 $6,130.380 $3,741.326 $7,649.000 $8,149.780 $5,500.000
6123 6001 ETHERNET SWITCH (INSTALL ONLY) EA 18.000 $550.000 $500.000 $1,143.850 $142.479 $348.000 $1,156.080 $370.000
6185 6002 TMA (STATIONARY) DAY 21.000 $400.000 $229.000 $875.950 $508.750 $332.000 $398.280 $130.000
6186 6002 ITS GND BOX(PCAST) TY 1 (243636)W/APRN EA 19.000 $5,600.000 $5,427.000 $5,602.710 $4,696.128 $5,007.000 $4,600.150 $6,500.000
6263 6002 BLUETOOTH DETECTION SYSTEM (INSTALL) EA 7.000 $2,800.000 $4,305.000 $1,715.790 $1,000.361 $4,626.000 $11,795.850 $1,100.000
Totals: $2,709,350.00 $1,868,961.17 $2,122,751.64 $2,186,489.21 $2,334,386.85 $2,597,468.28 $2,820,175.25