VAN ZANDT FM 859 (1171-01-022)

Items: 118

County: VAN ZANDT
Length: N/A
Highway: FM 859
District: TYLER
Control Number: 1171-01-022
DBE Goal: N/A
Project: STP 2022(813)HES
Guaranty: N/A
Time: 166 WORKING DAYS
Engineer's Estimate: $3,198,529.51
Date: 08/04/2022 (3 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
PRESTON FRIEND
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$3,198,529.51
$3,629,409.25
Over/Under Est: 13.47% $430,879.74
Over/Under Est: 23.18% $741,273.85
Amt Left: 8.55% $310,394.11
$4,702,643.21
Over/Under Est: 47.03% $1,504,113.70
Amt Left: 29.57% $1,073,233.96
Delta: -19.36% -$762,839.85
Over/Under Est: 52.39% $1,675,618.54
Amt Left: 34.3% $1,244,738.80
Delta: -3.65% -$171,504.84
Subcontractor Percentage Amount
JM YANEZ CONSTRUCTION, INC. 20.17% $732,051.85
TEXANA LAND & ASPHALT, INC. 12.92% $468,919.68
COLD CREEK CONSTRUCTION, LTD 10.48% $380,362.09
FORTSON CONTRACTING, INC. 2.83% $102,712.28
J. H. ODEN CONTRACTING COMPANY 1.48% $53,715.26
NEED GRASS NOW LLC 0.96% $34,842.33
MISSOURI PETROLEUM PRODUCTS COMPANY LLC 0.55% $19,961.75
FLEX SUPPLY, LLC 0.44% $15,969.40
DUSTROL, INC. 0.38% $13,791.76
LINEAR TRAFFIC MARKINGS LLC 0.29% $10,525.29
Total: 50.50% $1,832,851.69

Bid Items & Bid Tabulations

118 Total 0 of 118
VAN ZANDT  |  FM 859  |  TYLER  |  1171-01-022  |  08/04/2022  |  $3,198,529.51  |  STP 2022(813)HES  |  HAZARD ELIM & SAFETY  |  166 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
BAKER & COMPANY CONSTRUCTION, LLC
STATELINE CONSTRUCTION, LLC
A. L. HELMCAMP, INC.
EAST TEXAS BRIDGE, INC.
PREPARING ROW
STA 361.000 $860.000 $1,175.000 $1,100.000 $1,250.000 $1,700.000
REMOVING CONC (RIPRAP)
SY 13.000 $8.500 $64.000 $50.000 $13.800 $35.000
REMOVING CONC (DRIVEWAYS)
SY 384.000 $10.000 $17.000 $20.000 $13.800 $35.000
SUBGRADE WIDENING (ORD COMP)
STA 12.240 $290.500 $270.000 $3,000.000 $980.000 $600.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 6,864.000 $21.000 $19.000 $15.000 $40.000 $24.000
BLADING
STA 361.000 $142.000 $165.000 $125.000 $334.000 $300.000
FURNISHING AND PLACING TOPSOIL (4")
SY 10,753.000 $2.500 $1.550 $3.000 $1.250 $2.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 5,377.000 $0.150 $0.350 $0.500 $0.130 $0.400
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 10,753.000 $0.750 $1.000 $1.070 $1.200 $0.750
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 5,377.000 $0.680 $0.750 $1.100 $1.200 $0.750
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 5,377.000 $0.680 $0.750 $1.100 $1.200 $0.750
VEGETATIVE WATERING
MG 295.700 $11.000 $40.000 $5.000 $15.000 $15.000
EMULS ASPH (EROSN CONT)(CSS-1)
GAL 833.000 $3.700 $8.000 $15.000 $17.400 $10.000
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 2,074.000 $3.800 $11.000 $11.000 $5.600 $10.000
AGGR (TY-PD GR-3 OR TY-PL GR-3)
CY 50.000 $120.000 $368.000 $300.000 $520.000 $500.000
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 2,132.000 $3.040 $8.100 $15.000 $16.500 $15.000
CUT & RESTORING PAV
SY 86.000 $103.000 $153.000 $260.000 $115.000 $175.000
FLOWABLE BACKFILL
CY 77.000 $105.000 $230.000 $200.000 $259.000 $400.000
TEMPORARY SPL SHORING
SF 1,970.000 $15.000 $60.000 $25.000 $46.000 $65.000
CL C CONC (COLLAR)
EA 14.000 $786.980 $1,380.000 $1,200.000 $580.000 $2,000.000
CL E CONC (SEAL SLAB)(NON-REINF)
CY 25.000 $571.880 $428.000 $450.000 $580.000 $500.000
RIPRAP (CONC)(4 IN)
CY 3.000 $800.000 $642.000 $3,000.000 $690.000 $1,000.000
RIPRAP (CONC)(5 IN)
CY 101.000 $510.000 $589.000 $550.000 $600.000 $750.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 396.000 $181.790 $175.000 $135.000 $173.000 $225.000
RIPRAP (STONE COMMON)(DRY)(24 IN)
CY 180.000 $236.000 $180.000 $140.000 $224.000 $225.000
RIPRAP (MOW STRIP)(4 IN)
CY 110.000 $515.000 $535.000 $650.000 $600.000 $650.000
RAIL (TY T223)
LF 222.400 $120.000 $177.000 $225.000 $167.000 $150.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 84.000 $700.000 $696.000 $1,200.000 $980.000 $1,100.000
CONC BOX CULV (7 FT X 6 FT)(EXTEND)
LF 24.000 $1,000.000 $750.000 $2,200.000 $1,000.000 $1,200.000
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
LF 43.000 $2,000.000 $1,625.000 $2,500.000 $1,700.000 $2,000.000
CONC BOX CULVERT (2 FT X 2 FT) (EXTEND)
LF 12.000 $260.000 $321.000 $600.000 $600.000 $800.000
CONC BOX CULV (2 FT X 3 FT)(EXTEND)
LF 3.000 $280.000 $430.000 $700.000 $630.000 $800.000
CONC BOX CULV (10 FT X 14 FT)(EXTEND)
LF 43.000 $2,800.000 $1,550.000 $2,700.000 $2,100.000 $2,500.000
CONC BOX CULV (3 FT X 1.5 FT)
LF 50.000 $275.000 $383.000 $750.000 $600.000 $800.000
RC PIPE (CL III)(18 IN)
LF 88.000 $50.000 $0.000 $0.000 $0.000 $0.000
RC PIPE (CL III)(24 IN)
LF 178.000 $80.000 $0.000 $0.000 $0.000 $0.000
RC PIPE (CL III)(30 IN)
LF 64.000 $120.000 $0.000 $0.000 $0.000 $0.000
RC PIPE (CL III)(36 IN)
LF 40.000 $180.000 $133.000 $175.000 $173.000 $175.000
RC PIPE (CL III)(42 IN)
LF 6.000 $200.000 $190.000 $225.000 $230.000 $200.000
RC PIPE (CL III)(48 IN)
LF 96.000 $400.000 $188.000 $300.000 $276.000 $260.000
INLET (COMPL)(PAZD)(RC)(3FTX3FT)
EA 2.000 $5,700.000 $4,356.000 $5,500.000 $5,200.000 $6,500.000
INLET (COMPL)(PAZD)(RC)(4FTX4FT)
EA 3.000 $5,800.000 $5,155.000 $6,000.000 $6,300.000 $8,400.000
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
EA 2.000 $5,300.000 $4,960.000 $5,750.000 $5,800.000 $8,000.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 2.000 $5,000.000 $3,745.000 $5,500.000 $5,800.000 $7,500.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 3.000 $7,200.000 $4,815.000 $6,000.000 $6,300.000 $9,000.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 1.000 $8,200.000 $6,153.000 $8,000.000 $10,400.000 $12,000.000
HEADWALL (CH - PW - 0) (DIA= 42 IN)
EA 1.000 $8,700.000 $7,490.000 $9,500.000 $11,500.000 $15,000.000
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 4.000 $13,500.000 $9,095.000 $11,000.000 $13,800.000 $18,000.000
WINGWALL (FW - 0) (HW=11 FT)
EA 1.000 $45,000.000 $20,865.000 $27,000.000 $40,300.000 $40,000.000
WINGWALL (FW - 0) (HW=15 FT)
EA 1.000 $56,000.000 $36,890.000 $45,000.000 $46,000.000 $70,000.000
WINGWALL (FW - 0) (HW=7 FT)
EA 2.000 $15,600.000 $13,857.000 $18,000.000 $18,400.000 $20,000.000
WINGWALL (PW - 2) (HW=7 FT)
EA 4.000 $20,103.250 $16,585.000 $28,500.000 $23,000.000 $25,000.000
SET (TY I)(S=2 FT)(HW=3FT)(4:1)(C)
EA 1.000 $4,000.000 $5,350.000 $14,000.000 $5,800.000 $7,000.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 2.000 $800.000 $766.000 $550.000 $690.000 $700.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 7.000 $1,000.000 $860.000 $575.000 $750.000 $750.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 3.000 $1,050.000 $1,080.000 $800.000 $780.000 $925.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 262.000 $690.000 $856.000 $750.000 $780.000 $925.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 20.000 $800.000 $1,118.000 $1,250.000 $1,200.000 $1,200.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $855.000 $1,294.000 $1,500.000 $1,400.000 $1,400.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 12.000 $1,030.000 $1,294.000 $1,250.000 $1,400.000 $1,400.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 1.000 $1,544.000 $1,558.000 $1,700.000 $2,300.000 $2,500.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 6.000 $2,200.000 $1,940.000 $2,000.000 $2,900.000 $3,000.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 2.000 $2,500.000 $2,320.000 $3,200.000 $5,800.000 $4,000.000
CLEAN EXIST CULVERTS
EA 4.000 $1,025.000 $1,489.000 $500.000 $1,400.000 $2,500.000
REMOV STR (PIPE)
EA 137.000 $351.400 $362.000 $100.000 $230.000 $500.000
MOBILIZATION
LS 1.000 $200,000.000 $268,000.000 $350,000.000 $465,000.000 $435,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $5,000.000 $5,040.000 $2,500.000 $6,500.000 $7,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 285.000 $24.420 $29.000 $35.000 $24.200 $30.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,490.000 $30.750 $33.000 $30.000 $30.500 $35.000
ROCK FILTER DAMS (REMOVE)
LF 1,775.000 $7.810 $8.600 $5.000 $9.800 $9.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 300.000 $19.500 $13.800 $35.000 $66.250 $40.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 100.000 $61.070 $89.000 $50.000 $92.250 $150.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,525.000 $2.850 $3.050 $4.250 $2.800 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,525.000 $0.700 $0.700 $1.000 $0.650 $0.600
TRACKHOE WORK (EROSION & SEDMT CONT)
HR 100.000 $75.020 $107.000 $50.000 $128.000 $150.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 3.000 $3,799.130 $13,285.000 $6,000.000 $7,500.000 $10,000.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 860.000 $12.000 $14.450 $30.000 $15.600 $30.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 860.000 $7.180 $14.450 $30.000 $15.600 $15.000
INTERSECTIONS (ACP)
SY 566.000 $28.520 $51.000 $95.000 $245.000 $60.000
DRIVEWAYS (ACP)
SY 6,542.000 $35.170 $44.400 $52.500 $77.750 $45.000
DRIVEWAYS (CONC) (HES)
SY 384.000 $108.290 $144.450 $150.000 $115.000 $165.000
MTL W-BEAM GD FEN (STEEL POST)
LF 800.000 $30.000 $31.600 $37.000 $31.600 $33.000
MTL THRIE-BEAM GD FEN (STEEL POST)
EA 8.000 $410.000 $2,380.000 $2,500.000 $2,500.000 $2,400.000
REMOVE METAL BEAM GUARD FENCE
LF 474.000 $2.250 $3.200 $10.000 $3.500 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $2,800.000 $3,185.000 $3,200.000 $3,200.000 $3,200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $225.000 $321.000 $500.000 $345.000 $250.000
CRASH CUSH ATTEN (STKPL)
EA 2.000 $900.000 $990.000 $2,000.000 $1,900.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $23,337.070 $8,240.000 $12,000.000 $33,500.000 $11,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 50.000 $32.000 $26.750 $35.000 $25.300 $30.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 59.000 $58.000 $64.200 $66.000 $69.000 $65.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 1,600.000 $0.150 $1.100 $2.500 $2.300 $2.200
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 26.000 $2.860 $9.650 $15.000 $6.900 $6.500
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 200.000 $0.140 $1.100 $4.000 $2.300 $2.200
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 1,600.000 $0.150 $1.100 $3.000 $2.300 $2.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 40.000 $0.100 $2.150 $8.000 $1.300 $5.000
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 90.000 $1.580 $3.200 $15.000 $0.750 $5.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 48.000 $6.000 $16.050 $12.500 $11.500 $11.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 260.000 $0.350 $3.200 $7.000 $5.800 $5.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 300.000 $0.400 $3.200 $7.000 $5.800 $5.500
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 90.000 $12.370 $5.400 $22.000 $17.300 $20.000
REFL PAV MRKR TY II-A-A
EA 26.000 $3.070 $11.000 $80.000 $11.500 $11.000
SP MIXES SP-B PG64-22
TON 719.000 $135.000 $178.000 $160.000 $166.000 $200.000
SP MIXES SP-D PG64-22 (LEVEL-UP)
TON 51.000 $140.000 $193.000 $250.000 $482.000 $250.000
SP MIXES SP-D PG70-22
TON 419.000 $140.000 $205.000 $200.000 $231.000 $250.000
TACK COAT
GAL 741.000 $3.000 $1.100 $10.000 $5.900 $4.000
THERMOPLASTIC PIPE(30 IN)(PP)(TYPE III)
LF 94.000 $120.000 $0.000 $0.000 $0.000 $0.000
THERMOPLASTIC PIPE(24 IN)(PP)(TYPE III)
LF 158.000 $80.000 $0.000 $0.000 $0.000 $0.000
THERMOPLASTIC PIPE(12 IN)(PP)(TYPE III)
LF 6.000 $64.350 $0.000 $0.000 $0.000 $0.000
THERMOPLASTIC PIPE(18 IN)(PP)(TYPE III)
LF 4,254.000 $50.000 $0.000 $0.000 $0.000 $0.000
INSTALL FTB
LF 200.000 $60.000 $32.000 $90.000 $51.500 $75.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 21.000 $165.000 $85.000 $300.000 $500.000 $250.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $6,500.000 $16,055.000 $9,000.000 $15,100.000 $20,000.000
TMA (STATIONARY)
DAY 150.000 $165.000 $319.000 $150.000 $250.000 $300.000
TMA (MOBILE OPERATION)
DAY 98.000 $120.000 $450.000 $200.000 $500.000 $350.000
1
RC PIPE (CL III)(12 IN)
LF 6.000 $64.350 $93.000 $200.000 $48.300 $65.000
1
RC PIPE (CL III)(18 IN)
LF 4,342.000 $50.000 $44.000 $50.000 $55.250 $82.000
1
RC PIPE (CL III)(24 IN)
LF 336.000 $80.000 $60.000 $63.000 $80.500 $100.000
1
RC PIPE (CL III)(30 IN)
LF 158.000 $120.000 $91.000 $95.000 $127.000 $130.000
Totals: $3,461,855.610 $3,629,409.250 $3,939,803.360 $4,702,643.210 $4,874,148.050