Show Job Controls
Bid Cobra

VAL VERDE SL 79 (3621-01-014)

Items: 72

County: VAL VERDE
Length: N/A
Highway: SL 79
District: LAREDO
Control Number: 3621-01-014
DBE Goal: N/A
Project: STP 1802(541)
Guaranty: N/A
Time: 245 WORKING DAYS
Engineer's Estimate: $14,331,589.21
Date: 08/08/2018 (7 years ago)
Contract Number: N/A
Type: BASE,GRADE,ACP,PAVMRK,ILLUMINATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$14,331,589.21
$11,318,353.32
Over/Under Est: -21.03% -$3,013,235.89
$13,302,194.43
Over/Under Est: -7.18% -$1,029,394.78
Amt Left: 17.53% $1,983,841.11
$13,783,852.79
Over/Under Est: -3.82% -$547,736.42
Amt Left: 21.78% $2,465,499.47
Delta: -3.62% -$481,658.36
Over/Under Est: 2.5% $358,229.60
Amt Left: 29.79% $3,371,465.49
Delta: -6.57% -$905,966.02

Bid Items & Bid Tabulations

72 Total 0 of 72
VAL VERDE  |  SL 79  |  LAREDO  |  3621-01-014  |  08/08/2018  |  $14,331,589.21  |  STP 1802(541)  |  BASE,GRADE,ACP,PAVMRK,ILLUM  |  245 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
RAY FARIS, INC.
REECE ALBERT, INC.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
PREPARING ROW
STA 466.000 $350.000 $207.750 $177.210 $357.120 $325.000
REMOVING CONCRETE(MOW STRIP)
LF 382.000 $11.000 $2.800 $9.080 $13.360 $8.500
REMOVING STAB BASE AND ASPH PAV (5")
SY 223,954.000 $2.500 $1.520 $2.350 $1.530 $4.150
EXCAVATION (ROADWAY)
CY 2,222.000 $9.000 $7.800 $12.490 $17.050 $18.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 34,756.000 $16.000 $3.330 $11.180 $5.560 $9.500
BLADING
HR 30.000 $100.000 $91.200 $97.310 $174.490 $185.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 57.000 $850.000 $708.750 $675.000 $518.750 $1,123.000
DRILL SEEDING (TEMP) (WARM)
AC 57.000 $700.000 $498.750 $475.000 $388.800 $861.000
PROOF ROLLING
HR 78.000 $87.000 $91.200 $62.300 $34.610 $82.000
REWORK BS MATL (TY B)(10")(OC)
SY 223,954.000 $5.500 $2.480 $2.050 $2.880 $4.300
LIME (HYDRATED LIME (SLURRY))
TON 4,411.000 $200.000 $157.500 $214.730 $214.350 $195.000
LIME TRT (SUBGRADE)(6")
SY 241,652.000 $2.000 $2.050 $2.270 $2.430 $1.550
CEMENT
TON 3,461.000 $200.000 $147.000 $240.000 $231.830 $189.000
CEMENT TREAT (EXIST MATL)(DC)(10")
SY 227,524.000 $3.000 $2.850 $2.070 $2.330 $2.750
PRIME COAT (MC-30)
GAL 44,786.000 $3.500 $4.880 $5.010 $4.440 $4.420
ASPH (AC-15P)
GAL 67,186.000 $2.500 $3.310 $3.920 $3.560 $3.850
AGGR(TY-PB GR-4 SAC-B)
CY 1,867.000 $93.000 $59.410 $64.790 $87.050 $96.000
SUPERPAVE MIXTURES SP-C SAC-A PG76-22
TON 25,262.000 $92.000 $86.660 $98.080 $107.690 $89.520
SUPERPAVE MIXTURES SP-B SAC-B PG 76-22
TON 39,541.000 $90.000 $74.320 $81.490 $89.890 $79.500
CEM STABIL BKFL
CY 1,323.000 $95.000 $156.570 $200.000 $118.170 $148.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 30.000 $160.000 $175.000 $175.000 $181.930 $333.500
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 72.000 $185.000 $230.000 $230.000 $239.100 $425.500
RIPRAP (CONC)(FLUME)
CY 54.000 $395.000 $407.000 $425.000 $495.880 $785.000
RIPRAP (MOW STRIP)(4 IN)
CY 493.000 $450.000 $330.740 $425.000 $762.010 $633.000
RETROFIT RAIL (TY T631)
LF 125.000 $77.000 $65.100 $62.000 $64.450 $108.790
CLEAN EXIST CULVERTS
EA 6.000 $1,480.000 $2,477.690 $1,800.000 $2,688.860 $3,933.000
MOBILIZATION
LS 1.000 $1,286,201.000 $801,228.260 $1,251,646.850 $1,065,578.790 $1,800,500.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $6,000.000 $2,228.600 $2,386.000 $3,046.760 $2,089.100
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 1,440.000 $45.000 $38.320 $36.500 $38.200 $88.770
ROCK FILTER DAMS (REMOVE)
LF 1,440.000 $7.000 $14.700 $14.000 $13.510 $21.740
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 224.000 $21.000 $31.240 $29.750 $13.620 $17.860
CONSTRUCTION EXITS (REMOVE)
SY 224.000 $7.000 $17.590 $16.750 $9.020 $8.380
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 4,830.000 $4.250 $5.350 $5.100 $5.460 $7.310
RUMBLE STRIPS (SHOULDER)
LF 93,087.000 $0.170 $0.200 $0.090 $0.110 $0.220
RUMBLE STRIPS (CENTERLINE)
LF 40,128.000 $0.170 $0.260 $0.100 $0.150 $0.300
MTL W-BEAM GD FEN (TIM POST)
LF 8,157.000 $21.000 $18.900 $18.000 $18.710 $20.700
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 14.000 $1,600.000 $2,178.750 $1,575.000 $1,637.340 $1,811.250
REMOVE METAL BEAM GUARD FENCE
LF 8,157.000 $2.000 $1.310 $1.250 $1.300 $1.440
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 14.000 $300.000 $210.000 $200.000 $207.920 $230.000
RM MTL BM GD FEN TRANS (T101)
EA 4.000 $102.000 $105.000 $100.000 $103.960 $115.000
GUARDRAIL END TREATMENT (INSTALL)
EA 42.000 $2,500.000 $2,336.250 $2,225.000 $2,313.070 $2,558.750
GUARDRAIL END TREATMENT (REMOVE)
EA 42.000 $174.000 $210.000 $200.000 $207.920 $230.000
PIPE UNDERDRAINS (TY 6) (6")
LF 200.000 $17.000 $35.230 $32.000 $35.650 $48.000
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 9.000 $3,805.000 $4,300.000 $4,300.000 $4,470.210 $4,715.000
CONDT (PVC) (SCH 40) (2")
LF 2,834.000 $11.000 $18.000 $18.000 $18.710 $20.700
CONDT (PVC) (SCH 80) (2")
LF 727.000 $12.000 $40.000 $40.000 $41.580 $73.600
ELEC CONDR (NO.8) BARE
LF 7,122.000 $1.000 $1.150 $1.150 $1.200 $1.790
ELEC CONDR (NO.8) INSULATED
LF 3,561.000 $1.400 $1.150 $1.150 $1.200 $1.840
GROUND BOX TY D (162922)W/APRON
EA 10.000 $900.000 $900.000 $900.000 $935.630 $1,495.000
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
EA 1.000 $4,000.000 $4,600.000 $4,600.000 $4,782.080 $8,510.000
ALUMINUM SIGNS (TY G)
SF 304.250 $25.000 $26.000 $26.000 $27.030 $37.950
INSTALL LRSS (STRUCT STEEL)
LB 1,580.930 $5.500 $7.500 $7.500 $7.800 $4.430
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 58.000 $23.000 $26.250 $25.000 $25.990 $28.750
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 50.000 $0.300 $1.760 $1.060 $1.440 $1.470
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 8,002.000 $0.300 $1.760 $1.060 $1.450 $1.150
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 6,330.000 $0.750 $0.840 $0.650 $0.680 $0.810
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 16.000 $125.000 $125.860 $200.000 $207.920 $135.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 10.000 $130.000 $125.860 $300.000 $311.880 $143.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 4.000 $40.000 $39.850 $32.500 $33.790 $64.000
REF PROF PAV MRK TY I(W)4"(SLD)(060MIL)
LF 2,680.000 $0.400 $1.000 $2.000 $2.080 $2.880
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
LF 1,340.000 $0.400 $1.000 $2.000 $2.080 $4.030
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 200.000 $0.300 $0.680 $1.000 $1.040 $1.150
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 89,320.000 $0.300 $0.340 $0.300 $0.310 $0.420
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 9,627.000 $0.300 $0.340 $0.360 $0.370 $0.420
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 73,583.000 $0.300 $0.340 $0.310 $0.320 $0.420
REFL PAV MRKR TY I-R
EA 195.000 $6.260 $7.130 $7.000 $7.280 $9.200
REFL PAV MRKR TY II-A-A
EA 605.000 $2.750 $3.360 $4.000 $4.160 $4.600
REFL PAV MRKR TY II-C-R
EA 298.000 $3.080 $3.360 $3.500 $3.640 $4.600
BONDING COURSESE
GAL 21,963.000 $2.000 $2.360 $3.340 $4.600 $3.570
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $9,500.000 $2,624.080 $5,000.000 $8,891.210 $18,000.000
TMA (STATIONARY)
EA 2.000 $18,500.000 $7,036.250 $10,000.000 $4,615.260 $12,800.000
TMA (MOBILE OPERATION)
HR 1,000.000 $30.000 $25.980 $30.000 $30.790 $27.600
Totals: $14,331,589.205 $11,318,353.325 $13,302,194.435 $13,783,852.802 $14,689,818.827