REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
80.000
|
$6.990
|
$9.000
|
$12.000
|
$20.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
20.000
|
$18.950
|
$19.000
|
$45.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
418.000
|
$14.360
|
$30.000
|
$35.000
|
$20.000
|
|
|
DRILL SEEDING (PERM) (URBAN) (CLAY)
|
SY
|
2,868.000
|
$0.170
|
$2.000
|
$1.000
|
$0.150
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
2,868.000
|
$0.150
|
$2.000
|
$1.000
|
$0.150
|
|
|
VEGETATIVE WATERING
|
MG
|
241.000
|
$31.390
|
$25.000
|
$1.000
|
$5.000
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
14.000
|
$56.300
|
$145.000
|
$100.000
|
$100.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
20.000
|
$251.000
|
$200.000
|
$120.000
|
$250.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
264.000
|
$233.450
|
$250.000
|
$220.000
|
$250.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
17.000
|
$454.320
|
$420.000
|
$1,000.000
|
$500.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
54.450
|
$496.200
|
$420.000
|
$720.000
|
$500.000
|
|
|
RAIL (TY PR11)
|
LF
|
574.000
|
$89.000
|
$150.000
|
$130.000
|
$200.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
5.000
|
$743.140
|
$800.000
|
$1,000.000
|
$1,000.000
|
|
|
INLET (COMPL)(CURB)(MOD 2 TY C1)
|
EA
|
12.000
|
$7,000.000
|
$6,000.000
|
$8,000.000
|
$8,000.000
|
|
|
INLET (COMPL)(CURB)(TY C1) MOD
|
EA
|
8.000
|
$6,000.000
|
$7,000.000
|
$8,000.000
|
$8,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
1.000
|
$9,975.130
|
$10,000.000
|
$3,000.000
|
$10,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
4.000
|
$11,515.490
|
$12,250.000
|
$6,000.000
|
$10,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
6.000
|
$2,177.220
|
$2,200.000
|
$150.000
|
$2,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$532.060
|
$1,750.000
|
$1,650.000
|
$1,200.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$156,785.330
|
$87,250.000
|
$178,000.000
|
$180,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$3,500.000
|
$2,000.000
|
$1,000.000
|
$7,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
44.000
|
$56.650
|
$120.000
|
$1.000
|
$80.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
44.000
|
$16.480
|
$20.000
|
$1.000
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$17.530
|
$40.000
|
$22.000
|
$20.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$5.020
|
$5.000
|
$5.000
|
$1.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
113.000
|
$61.620
|
$100.000
|
$1.100
|
$60.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,522.000
|
$3.600
|
$3.000
|
$0.100
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,522.000
|
$1.080
|
$1.000
|
$0.100
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
297.000
|
$5.380
|
$7.000
|
$0.100
|
$4.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
297.000
|
$1.250
|
$1.000
|
$0.100
|
$1.000
|
|
|
REMOVE AND RELAY PAVERS
|
SY
|
70.000
|
$150.000
|
$150.000
|
$130.000
|
$100.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
60.000
|
$20.000
|
$30.000
|
$35.000
|
$20.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
6,719.440
|
$18.360
|
$25.000
|
$45.000
|
$25.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,238.000
|
$64.670
|
$55.000
|
$50.000
|
$70.000
|
|
|
DRIVEWAYS (CONC) (FAST TRACK)
|
SY
|
1,112.000
|
$140.000
|
$110.000
|
$120.000
|
$70.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
4,418.390
|
$50.200
|
$47.500
|
$90.000
|
$70.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
4.000
|
$2,115.000
|
$2,000.000
|
$2,000.000
|
$1,700.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
2.000
|
$2,078.570
|
$2,100.000
|
$2,000.000
|
$1,800.000
|
|
|
CURB RAMPS (TY 22)
|
EA
|
2.000
|
$3,550.000
|
$3,100.000
|
$2,000.000
|
$2,800.000
|
|
|
REPLACE LUMINAIRE W/LED (400W EQ)
|
EA
|
8.000
|
$600.000
|
$500.000
|
$600.000
|
$2,500.000
|
|
|
IN RD IL (TY ST) 50T-10 (400W EQ) LED
|
EA
|
33.000
|
$3,780.000
|
$3,800.000
|
$5,000.000
|
$5,500.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
6,057.000
|
$13.590
|
$12.500
|
$10.000
|
$15.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
2,188.000
|
$34.900
|
$22.000
|
$44.000
|
$40.000
|
|
|
CONDT (RM) (1 1/2")
|
LF
|
454.000
|
$7.000
|
$15.000
|
$18.000
|
$30.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
5,362.000
|
$1.350
|
$2.000
|
$1.000
|
$2.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
10,806.000
|
$1.390
|
$2.000
|
$1.750
|
$2.000
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
3,048.000
|
$2.150
|
$3.000
|
$1.750
|
$2.000
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
6,096.000
|
$2.150
|
$3.500
|
$3.000
|
$3.000
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
6.000
|
$992.850
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
2.000
|
$534.290
|
$525.000
|
$500.000
|
$1,500.000
|
|
|
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
|
EA
|
2.000
|
$3,893.000
|
$4,900.000
|
$4,000.000
|
$6,500.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
96.000
|
$28.260
|
$80.000
|
$42.000
|
$30.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
8.000
|
$568.000
|
$725.000
|
$600.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
2.000
|
$969.320
|
$880.000
|
$700.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P)
|
EA
|
2.000
|
$1,329.170
|
$1,000.000
|
$1,500.000
|
$1,200.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
10.000
|
$449.210
|
$670.000
|
$500.000
|
$500.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
1.000
|
$540.570
|
$670.000
|
$1,000.000
|
$500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$85.000
|
$110.000
|
$65.000
|
$100.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
527.360
|
$4.340
|
$6.500
|
$9.000
|
$10.000
|
|
|
RELOCATE LRSA
|
EA
|
2.000
|
$3,525.000
|
$2,700.000
|
$1,500.000
|
$4,000.000
|
|
|
REMOVE LRSA
|
EA
|
1.000
|
$776.290
|
$1,100.000
|
$500.000
|
$1,000.000
|
|
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
|
LF
|
25.000
|
$0.890
|
$3.000
|
$5.000
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,325.000
|
$0.840
|
$1.500
|
$2.000
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
524.000
|
$5.110
|
$8.000
|
$12.500
|
$6.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
8.000
|
$114.150
|
$160.000
|
$200.000
|
$140.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
8.000
|
$128.230
|
$160.000
|
$200.000
|
$140.000
|
|
|
PAVEMENT SEALER 24"
|
LF
|
524.000
|
$1.600
|
$3.750
|
$2.500
|
$2.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
8.000
|
$62.700
|
$80.000
|
$50.000
|
$40.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
8.000
|
$63.060
|
$80.000
|
$50.000
|
$50.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
400.000
|
$0.410
|
$3.000
|
$2.000
|
$1.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
2,000.000
|
$0.350
|
$2.000
|
$2.000
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
350.000
|
$0.380
|
$3.000
|
$2.000
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
1,000.000
|
$0.350
|
$2.500
|
$2.000
|
$1.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
68.000
|
$3.270
|
$17.500
|
$10.000
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
60.000
|
$3.590
|
$17.500
|
$10.000
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
100.000
|
$0.500
|
$6.000
|
$2.500
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
60.000
|
$1.000
|
$11.000
|
$5.000
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
524.000
|
$2.890
|
$5.000
|
$8.000
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
6.000
|
$59.410
|
$70.000
|
$150.000
|
$100.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
6.000
|
$56.730
|
$70.000
|
$150.000
|
$100.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
524.000
|
$5.000
|
$2.000
|
$1.000
|
$40.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
8.000
|
$45.380
|
$60.000
|
$20.000
|
$40.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
8.000
|
$45.810
|
$60.000
|
$20.000
|
$40.000
|
|
|
REMOVAL OF CONDUIT
|
LF
|
50.000
|
$7.220
|
$4.000
|
$5.000
|
$6.000
|
|
|
REMOVAL OF CABLES
|
LF
|
972.000
|
$1.020
|
$2.000
|
$1.250
|
$2.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,065.550
|
$17,000.000
|
$1.000
|
$9,999.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
324.000
|
$2.130
|
$5.000
|
$5.000
|
$1.000
|
|
|
GROUND BOX (PREPARE)
|
EA
|
2.000
|
$297.000
|
$200.000
|
$150.000
|
$500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
160.000
|
$263.540
|
$200.000
|
$25.000
|
$400.000
|
|
Totals: |
$1,724,638.609
|
$1,703,783.365
|
$2,038,963.740
|
$2,111,933.300
|