Job Info for 0022-05-025

County: VAL VERDE Highway: US 90 Date: 06/02/2022 (2 years ago) Engineer's Estimate: $12,119,655 Control Number: 0022-05-025
Project: F 2022(601) District: LAREDO Time: 445 WORKING DAYS Type: PLANING, OVERLAYING, RAIL UPGRADE & PAV MRK
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $12,119,654.56
HUNTER INDUSTRIES, LTD.   $16,723,941.13 1
37.99% | $4,604,286.57
Subcontractor Percentage Amount
TERRA CONSTRUCTION LLC 8.99% $1,503,482.31
DEPENDABLE FENCE 4.46% $745,887.77
TEXAS GUARDRAIL CONTRACTORS LLC 3.66% $612,096.25
TRP CONSTRUCTION GROUP, LLC 1.44% $240,824.75
FLASHER EQUIPMENT COMPANY 0.71% $118,739.98
DELGADO"S CONTRACTORS, LLC 0.65% $108,705.62
A K FUQUAY CONSTRUCTION 0.63% $105,360.83
SURFACE PREPARATION TECHNOLOGIES, LLC 0.13% $21,741.12
CHEROKEE SERVICES 0.03% $5,017.18
Total: 20.70% $3,461,855.81

Bid Items

Items: 103, 0 filtered
VAL VERDE US 90  |  LAREDO  |  0022-05-025  |  06/02/2022  |  $12,119,655  |  F 2022(601)  |  PLANING, OVERLAYING, RAIL UPGRADE & PAV MRK  |  445 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate HUNTER INDUSTRIES, LTD.
100 6002 PREPARING ROW STA 76.000 $2,000.000 $759.240
100 6016 PREPARING ROW (TREE) (36" TO 48" DIA) EA 2.000 $3,300.000 $5,400.000
104 6001 REMOVING CONC (PAV) SY 41.000 $15.000 $37.620
104 6017 REMOVING CONC (DRIVEWAYS) SY 456.000 $14.000 $37.620
104 6022 REMOVING CONC (CURB AND GUTTER) LF 9,518.000 $8.000 $13.680
104 6036 REMOVING CONC (SIDEWALK OR RAMP) SY 5,469.000 $18.000 $27.360
104 6054 REMOVING CONCRETE(MOW STRIP) LF 300.000 $15.000 $13.680
104 6067 REMOVING CONC (SAWCUT) LF 348.000 $11.330 $27.360
110 6001 EXCAVATION (ROADWAY) CY 890.000 $10.000 $16.020
134 6001 BACKFILL (TY A) STA 512.070 $125.000 $180.900
160 6010 FURNISH AND PLACE TOPSOIL (5") SY 5,479.000 $3.000 $3.150
162 6002 BLOCK SODDING SY 5,479.000 $4.000 $6.990
164 6001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY 5,479.000 $0.250 $0.510
168 6001 VEGETATIVE WATERING MG 206.000 $9.000 $20.520
351 6001 FLEXIBLE PAVEMENT STRUCTURE REPAIR(5") SY 8,912.000 $35.000 $40.250
351 6002 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") SY 4,802.000 $40.000 $49.020
351 6019 FLEXIBLE PAVEMENT STRUCTURE REPAIR(3") SY 35,515.000 $25.000 $25.040
354 6021 PLANE ASPH CONC PAV(0" TO 2") SY 1,467.000 $2.000 $2.080
354 6045 PLANE ASPH CONC PAV (2") SY 133,808.000 $1.500 $2.080
354 6064 PLANE ASPH CONC PAV (2 1/2") SY 20,768.000 $3.000 $2.510
360 6054 CONC PVMT (CONT REINF-CRCP) (HES) (9") SY 1,066.000 $108.320 $275.710
360 6080 CONC PVMT(CRCP)(TRANSITION SLAB) SY 160.000 $110.000 $281.600
361 6002 FULL - DEPTH REPAIR CRCP (8") SY 300.000 $270.000 $288.280
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 865.000 $480.000 $732.800
438 6001 CLEANING AND SEALING EXISTING JOINTS LF 132.000 $30.000 $79.440
450 6050 RAIL (HANDRAIL)(TY D) LF 20.000 $150.000 $688.140
467 6091 SET (TY I)(S=2 FT)(HW=3FT)(4:1)(C) EA 1.000 $6,000.000 $3,752.210
467 6224 SET (TY I)(S= 6 FT)(HW= 6 FT)(4:1) (C) EA 2.000 $11,500.000 $16,181.090
467 6276 SET (TY I)(S= 8 FT)(HW= 5 FT)(4:1) (C) EA 2.000 $11,525.000 $16,525.160
480 6001 CLEAN EXIST CULVERTS EA 4.000 $2,675.000 $1,512.840
496 6005 REMOV STR (WINGWALL) EA 4.000 $1,325.000 $2,953.420
500 6001 MOBILIZATION LS 1.000 $937,769.350 $1,400,864.220
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 23.000 $4,180.000 $2,560.870
506 6003 ROCK FILTER DAMS (INSTALL) (TY 3) LF 64.000 $52.000 $144.130
506 6011 ROCK FILTER DAMS (REMOVE) LF 64.000 $16.000 $29.780
506 6030 BACKHOE WORK (EROSION & SEDMT CONT) HR 7.000 $72.000 $105.300
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 258.000 $2.600 $4.900
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 258.000 $1.050 $1.020
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 8,130.000 $4.500 $5.640
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 8,130.000 $1.250 $1.020
510 6001 ONE-WAY TRAF CONT (FLAGGER CONT) HR 676.000 $150.000 $105.300
510 6002 ONE-WAY TRAF CONT (PILOT CAR) HR 555.000 $68.000 $128.700
512 6072 PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL) LF 120.000 $60.000 $61.300
512 6074 PTB (MOVE)(SGL SLP)(TY 1) OR (STL) LF 360.000 $5.000 $28.610
512 6076 PTB (REMOVE)(SGL SLP)(TY 1) OR (STL) LF 120.000 $15.000 $50.140
529 6008 CONC CURB & GUTTER (TY II) LF 9,518.000 $25.000 $57.340
529 6030 CONC CURB & GUTTER (VALLEY GUTTER) LF 135.000 $31.000 $91.750
530 6025 DRIVEWAYS (CONC) (FAST TRACK) SY 1,201.000 $85.000 $183.500
531 6001 CONC SIDEWALKS (4") SY 5,469.000 $55.000 $96.340
531 6004 CURB RAMPS (TY 1) EA 17.000 $1,690.000 $2,867.260
531 6005 CURB RAMPS (TY 2) EA 2.000 $2,300.000 $3,211.330
531 6006 CURB RAMPS (TY 3) EA 1.000 $2,000.000 $3,440.710
531 6008 CURB RAMPS (TY 5) EA 3.000 $2,500.000 $3,784.780
531 6010 CURB RAMPS (TY 7) EA 3.000 $2,000.000 $3,096.640
531 6013 CURB RAMPS (TY 10) EA 31.000 $2,000.000 $2,637.880
533 6003 RUMBLE STRIPS (SHOULDER) ASPHALT LF 99,613.000 $0.130 $0.200
533 6004 RUMBLE STRIPS (CENTERLINE) ASPHALT LF 49,807.000 $0.200 $0.200
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 16,450.000 $26.000 $27.030
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 4.000 $1,995.000 $2,147.100
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 3.000 $1,280.000 $1,397.400
540 6017 MTL BM GD FEN (LONG SPAN SYSTEM) LF 150.000 $90.000 $26.980
542 6001 REMOVE METAL BEAM GUARD FENCE LF 15,925.000 $2.400 $1.790
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 2.000 $200.000 $178.500
542 6004 RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA 4.000 $260.000 $178.500
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 79.000 $2,910.000 $3,243.600
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 8.000 $310.000 $178.500
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA 3.000 $1,300.000 $943.500
545 6005 CRASH CUSH ATTEN (REMOVE) EA 1.000 $800.000 $943.500
545 6019 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 1.000 $8,140.000 $8,976.000
560 6004 MAILBOX INSTALL-S (TWG-POST) TY 2 EA 16.000 $226.000 $306.360
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 34.000 $731.760 $675.630
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 3.000 $712.580 $783.940
644 6005 IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT) EA 2.000 $802.000 $907.720
644 6007 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 4.000 $900.000 $1,005.720
644 6030 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 1.000 $790.000 $1,010.870
644 6031 IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT) EA 2.000 $1,030.000 $1,134.650
644 6033 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 2.000 $1,007.000 $1,315.170
644 6050 IN SM RD SN SUP&AM TYS80(2)SA(P) EA 1.000 $1,000.000 $1,856.710
644 6076 REMOVE SM RD SN SUP&AM EA 41.000 $100.380 $113.470
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 220.000 $31.000 $24.760
662 6001 WK ZN PAV MRK NON-REMOV (W)4"(BRK) LF 3,635.000 $0.260 $3.370
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 8,907.000 $0.250 $3.370
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 5,118.000 $1.500 $1.430
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 8,088.000 $0.900 $1.430
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 4,445.000 $0.770 $1.020
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 2,312.000 $5.500 $8.160
666 6054 REFL PAV MRK TY I (W)(ARROW)(100MIL) EA 33.000 $125.000 $178.500
666 6078 REFL PAV MRK TY I (W)(WORD)(100MIL) EA 32.000 $145.000 $204.000
666 6099 REF PAV MRK TY I(W)18"(YLD TRI)(100MIL) EA 132.000 $40.000 $66.300
666 6300 RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) LF 7,980.000 $0.310 $0.660
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 124,550.000 $0.280 $0.480
666 6312 RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF 15,778.000 $0.280 $0.660
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 126,774.000 $0.300 $0.480
672 6007 REFL PAV MRKR TY I-C EA 980.000 $2.900 $8.160
672 6009 REFL PAV MRKR TY II-A-A EA 1,906.000 $2.910 $8.160
3076 6043 D-GR HMA TY-D PG70-22 (LEVEL-UP) TON 8,691.000 $94.000 $129.420
3077 6033 SP MIXES SP-C SAC-A PG76-22 TON 51,688.000 $100.000 $140.220
3084 6001 BONDING COURSE GAL 88,851.000 $2.300 $4.010
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 4.000 $9,800.000 $10,313.260
6049 6001 LONG CHANNEL MOUNT CURB SYS (INSTALL) LF 415.000 $60.000 $72.210
6049 6003 LONG CHANNEL MOUNT CURB SYS (REMOVE) LF 415.000 $10.000 $7.220
6185 6002 TMA (STATIONARY) DAY 398.000 $200.000 $226.890
6185 6003 TMA (MOBILE OPERATION) HR 286.000 $50.000 $77.350
Totals: $12,119,654.56 $16,723,941.13