UVALDE US 90 (0024-01-105)

Items: 46

County: UVALDE
Length: N/A
Highway: US 90
District: SAN ANTONIO
Control Number: 0024-01-105
DBE Goal: N/A
Project: STP 1902(207)HES
Guaranty: N/A
Time: 120 WORKING DAYS
Engineer's Estimate: $1,332,255.28
Date: 07/09/2019 (6 years ago)
Contract Number: N/A
Type: SFT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$1,332,255.28
$1,455,288.95
Over/Under Est: 9.23% $123,033.67
Over/Under Est: 17.26% $229,981.44
Amt Left: 7.35% $106,947.77

Bid Items & Bid Tabulations

46 Total 0 of 46
UVALDE  |  US 90  |  SAN ANTONIO  |  0024-01-105  |  07/09/2019  |  $1,332,255.28  |  STP 1902(207)HES  |  SFT  |  120 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
F & W ELECTRICAL CONTRACTORS, INC.
E-Z BEL CONSTRUCTION, LLC
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 1,118.000 $278.710 $250.000 $300.000
MOBILIZATION
LS 1.000 $75,600.000 $95,000.000 $127,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $5,000.000 $2,100.000 $4,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 50.000 $20.850 $100.000 $65.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $2,571.390 $4,250.000 $2,805.000
CONDT (PVC) (SCH 80) (2")
LF 1,589.000 $7.660 $10.000 $16.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 25.000 $20.440 $60.000 $70.000
CONDT (PVC) (SCH 80) (3")
LF 3,178.000 $14.620 $11.000 $18.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 50.000 $29.350 $65.000 $72.000
ELEC CONDR (NO.6) BARE
LF 5,549.000 $1.320 $1.200 $1.500
TRAY CABLE (4 CONDR) (12 AWG)
LF 14,886.000 $1.970 $2.250 $2.250
GROUND BOX TY A (122311)W/APRON
EA 22.000 $937.430 $825.000 $850.000
GROUND BOX TY D (162922)W/APRON
EA 22.000 $940.060 $950.000 $1,000.000
ZINC-COAT STL WIRE STRAND (3/16")
LF 6,842.000 $3.830 $4.600 $3.000
ZINC-COAT STL WIRE STRAND (5/16")
LF 6,842.000 $3.890 $4.600 $3.000
ELC SRV TY D 120/240 070(NS)AL(E)TP(O)
EA 22.000 $3,632.140 $3,500.000 $5,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 10.000 $524.080 $505.000 $525.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,965.000 $0.770 $0.800 $0.740
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 878.000 $5.630 $6.000 $6.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 18.000 $108.210 $150.000 $150.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 10.000 $137.120 $150.000 $150.000
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 2.000 $477.930 $555.000 $555.000
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 88.000 $36.630 $33.000 $33.000
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
EA 4.000 $222.730 $250.000 $249.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 60.000 $5.290 $8.000 $8.000
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 3.000 $266.210 $450.000 $444.000
PAVEMENT SEALER 4"
LF 1,950.000 $0.080 $0.550 $0.500
PAVEMENT SEALER 24"
LF 104.000 $1.910 $3.000 $3.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 6,170.000 $0.350 $0.550 $0.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 20,360.000 $0.270 $0.500 $0.440
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 3,020.000 $0.280 $0.550 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 23,190.000 $0.280 $0.500 $0.440
REFL PAV MRKR TY I-C
EA 129.000 $3.070 $5.000 $5.000
REFL PAV MRKR TY II-A-A
EA 819.000 $2.790 $3.500 $3.330
REFL PAV MRKR TY II-C-R
EA 309.000 $3.150 $4.000 $4.000
PAV SURF PREP FOR MRK (4")
LF 1,750.000 $0.040 $0.500 $0.500
PAV SURF PREP FOR MRK (24")
LF 104.000 $1.140 $3.000 $3.000
INSTALL HWY TRF SIG (FLASH BEACON)
EA 22.000 $4,410.490 $5,100.000 $1,400.000
REMOVING TRAFFIC SIGNALS
EA 2.000 $4,013.610 $3,000.000 $4,000.000
VEH SIG SEC (12")LED(YEL)
EA 180.000 $221.140 $250.000 $250.000
VEH SIG SEC (12")LED(RED)
EA 144.000 $219.570 $250.000 $250.000
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 25,071.000 $1.880 $2.250 $1.850
INS TRF SIG PL AM (S)STR(TY B)
EA 30.000 $3,142.750 $4,450.000 $5,400.000
INS TRF SIG PL AM (S)STR(TY B)LUM
EA 56.000 $4,550.980 $5,265.000 $5,900.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 80.000 $3.110 $15.000 $14.000
TMA (STATIONARY)
DAY 88.000 $181.620 $420.000 $295.000
Totals: $1,332,255.280 $1,455,288.950 $1,562,236.720