REMOVING CONC (DRIVEWAYS)
|
SY
|
143.000
|
$45.000
|
$150.000
|
$28.750
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
772.000
|
$10.000
|
$30.000
|
$14.700
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
492.000
|
$5.000
|
$21.250
|
$15.000
|
|
|
REMOVING STAB BASE & ASPH PAV (9")
|
SY
|
37,164.000
|
$8.500
|
$7.790
|
$50.000
|
|
|
REWORK BS MTL (TY D)(SURF)(ORD COMP)
|
SY
|
37,164.000
|
$1.000
|
$0.980
|
$1.500
|
|
|
PRIME COAT (AE-P)
|
GAL
|
7,437.000
|
$5.000
|
$5.220
|
$10.600
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
4,905.000
|
$4.000
|
$5.100
|
$8.750
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
18,631.000
|
$5.500
|
$5.880
|
$10.150
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
411.000
|
$245.000
|
$295.000
|
$280.000
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
6,296.000
|
$2.250
|
$6.590
|
$0.550
|
|
|
PLANE ASPH CONC PAV (2 1/2")
|
SY
|
5,566.000
|
$2.750
|
$6.590
|
$2.430
|
|
|
INLET (COMP) (TY SIDEWALK BRIDGE)
|
EA
|
1.000
|
$20,000.000
|
$40,480.000
|
$27,000.000
|
|
|
ADJUSTING MANHOLES (WATER VALVE BOX)
|
EA
|
5.000
|
$700.000
|
$3,220.000
|
$1,310.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$478,627.180
|
$500,000.000
|
$715,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$25,000.000
|
$30,000.000
|
$27,500.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
40.000
|
$6.500
|
$105.000
|
$12.800
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
40.000
|
$1.500
|
$22.000
|
$3.950
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
418.000
|
$55.000
|
$102.350
|
$46.650
|
|
|
DRIVEWAYS (CONC) (FAST TRACK)
|
SY
|
877.000
|
$220.000
|
$249.550
|
$130.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
3,096.000
|
$150.000
|
$143.750
|
$80.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
2.000
|
$4,600.000
|
$5,290.000
|
$1,900.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
3.000
|
$5,400.000
|
$5,554.500
|
$2,400.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
20.000
|
$5,500.000
|
$5,290.000
|
$2,000.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
16.000
|
$50.000
|
$39.100
|
$485.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
37.000
|
$900.000
|
$922.300
|
$910.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$1,350.000
|
$1,335.150
|
$1,425.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
4.000
|
$1,100.000
|
$1,275.350
|
$1,425.000
|
|
|
RELOCATE SM RD SN SUP&AM TY TWT
|
EA
|
7.000
|
$400.000
|
$634.800
|
$741.520
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
50.000
|
$180.000
|
$220.000
|
$230.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
2,000.000
|
$0.300
|
$0.290
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
223,538.000
|
$0.250
|
$0.170
|
$0.150
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
3,342.000
|
$5.000
|
$2.300
|
$3.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
233,144.000
|
$0.250
|
$0.170
|
$0.160
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
758.000
|
$1.500
|
$3.250
|
$3.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
496.000
|
$1.500
|
$3.250
|
$4.300
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
458.000
|
$1.100
|
$1.730
|
$1.250
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
2,000.000
|
$0.500
|
$0.860
|
$1.100
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
3,127.000
|
$0.500
|
$0.860
|
$1.100
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
9,910.000
|
$0.500
|
$0.860
|
$1.040
|
|
PREFAB PAV MRK TY B (W)(4")(BRK)
|
LF
|
10.000
|
$8.000
|
$13.800
|
$3.650
|
|
PREFAB PAV MRK TY B (W)(8")(SLD)
|
LF
|
20.000
|
$16.000
|
$34.500
|
$44.250
|
|
PREFAB PAV MRK TY B (Y)(4")(SLD)
|
LF
|
40.000
|
$8.000
|
$13.800
|
$31.650
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
944.000
|
$15.000
|
$16.100
|
$11.700
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
4.000
|
$700.000
|
$644.000
|
$853.650
|
|
REFL PAV MRKR TY I-C
|
EA
|
104.000
|
$4.500
|
$5.180
|
$6.300
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
132.000
|
$4.000
|
$5.180
|
$6.300
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
9,295.000
|
$0.500
|
$0.850
|
$0.900
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
48.000
|
$3.500
|
$5.750
|
$9.400
|
|
|
ELIM EXT PAV MRK & MRKS (RR XING)
|
EA
|
2.000
|
$150.000
|
$138.000
|
$215.300
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
90.000
|
$0.250
|
$1.150
|
$1.270
|
|
|
SP MIXES SP-B SAC-B PG70-22
|
TON
|
15,332.000
|
$125.000
|
$152.000
|
$200.000
|
|
|
TACK COAT
|
GAL
|
3,721.000
|
$4.500
|
$4.960
|
$8.600
|
|
|
STONE-MTRX-ASPH SMAR-F SAC-A
|
TON
|
4,201.000
|
$185.000
|
$230.000
|
$200.000
|
|
|
BONDING COURSE
|
GAL
|
4,905.000
|
$5.500
|
$4.960
|
$10.800
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$17,500.000
|
$21,600.000
|
$13,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
132.000
|
$200.000
|
$150.000
|
$385.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
24.000
|
$650.000
|
$1,020.000
|
$780.000
|
|
Totals: |
$5,194,897.980
|
$5,995,947.220
|
$8,039,555.810
|