UPTON US 385 (0229-04-057)

Items: 147

County: UPTON
Length: N/A
Highway: US 385
District: ODESSA
Control Number: 0229-04-057
DBE Goal: N/A
Project: C 229-4-57
Guaranty: N/A
Time: 501 WORKING DAYS
Engineer's Estimate: $48,025,326.30
Date: 03/08/2023 (3 years ago)
Contract Number: N/A
Type: HIGHWAY IMPROVEMENT
Mail/Deliver Bids To: N/A
ODA-PRELETTINGQUESTIONS
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$48,025,326.30
$49,428,878.57
Over/Under Est: 2.92% $1,403,552.27
Subcontractor Percentage Amount
4-WAY HAULERS, LLC 15.57% $7,756,755.75
TUCAN CONTRACTING, LLC 2.37% $1,180,700.78
HJC FARMS, INC. 2.17% $1,081,063.58
NICKEL ROCK, LLC 1.00% $498,185.98
J H TRUCKING 1.00% $498,185.98
SCR CIVIL CONSTRUCTION, LLC 0.93% $463,312.96
TRP CONSTRUCTION GROUP, LLC 0.63% $313,857.17
DOUBLE A CONTRACTING, L.P. 0.49% $244,111.13
JB PINNACLE GROUP, LLC 0.45% $224,183.69
CEDAR EATERS OF TEXAS 0.28% $139,492.08
FC TRAFFIC CONTROL, INC. 0.17% $84,691.62
VERIFIED LLC 0.14% $69,746.04
LINE QUEST LLC 0.04% $19,927.44
WEST TEXAS ROCK RESOURCES, LLC 0.02% $9,963.72
Total: 25.26% $12,584,177.92

Bid Items & Bid Tabulations

147 Total 0 of 147
UPTON  |  US 385  |  ODESSA  |  0229-04-057  |  03/08/2023  |  $48,025,326.30  |  C 229-4-57  |  HWY IMPRV  |  501 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
DELHUR INDUSTRIES, INC.
PREPARING ROW
AC 1.200 $3,000.000 $30,000.000
PREPARING ROW
STA 371.000 $5,500.000 $7,471.800
REMOVING CONC (RIPRAP)
SY 1,073.000 $15.000 $24.000
REMOVING STAB BASE & ASPH PAV (0-6")
SY 42,812.000 $5.000 $4.174
REMOVING STAB BASE & ASPH PAV (8"-19")
SY 4,724.000 $7.000 $19.479
EXCAVATION (ROADWAY)
CY 185,789.000 $10.000 $6.240
EXCAVATION (CHANNEL)
CY 936.000 $20.000 $30.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 26,064.000 $17.000 $9.969
EMBANKMENT (FINAL)(DENS CONT)(TY D)
CY 185,789.000 $11.000 $5.667
BLADING
HR 225.000 $300.000 $270.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 582,374.000 $0.150 $0.176
PROOF ROLLING
HR 377.000 $150.000 $240.000
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 324,726.000 $10.000 $5.999
REWORK BS MTL (TY C) (6") (ORD COMP)
STA 88.000 $400.000 $300.000
REWORK BS MTL (TY A) (6") (ORD COMP)
SY 4,448.000 $8.000 $2.400
REWORK BS MTL (TY D)(SURF)(ORD COMP)
SY 42,812.000 $1.500 $1.200
PRIME COAT (AE-P)
GAL 3,349.000 $5.000 $5.550
PRIME COAT (MC-30)
GAL 70,317.000 $6.500 $5.690
FOG SEAL (CSS-1H)
GAL 74,685.000 $5.000 $4.725
ASPH (AC-20-5TR)
GAL 132,967.000 $4.000 $5.440
AGGR(TY-PB GR-4 SAC-A)
CY 2,952.000 $130.000 $139.227
FLEX PAVEMENT STRUCTURE REPAIR (8"-15")
SY 1,110.000 $100.000 $111.532
PLANE ASPH CONC PAV (1.5")
SY 138.000 $2.500 $120.000
CONC PVMT (CONT REINF - CRCP) (6")
SY 1,320.000 $100.000 $300.000
CEM STABIL BKFL
CY 986.000 $220.000 $343.500
TRENCH EXCAVATION PROTECTION
LF 688.000 $20.000 $24.000
TEMPORARY SPL SHORING
SF 2,230.000 $30.000 $24.000
CLASS S CONC UTILITY PROTECTION PADDING
CY 1,192.000 $1,100.000 $745.000
RIPRAP (CONC)(5 IN)
CY 1,479.000 $690.000 $625.000
RIPRAP CONC (8 IN)
CY 88.000 $850.000 $1,530.000
RIPRAP (CONC)(DISSIPATER)
CY 9.000 $2,300.000 $1,530.000
RIPRAP (MOW STRIP)(4 IN)
CY 931.000 $500.000 $550.000
GABION MATTRESSES (GALV)(12 IN)
SY 835.000 $60.000 $84.000
CONC BOX CULV (4 FT X 2 FT)
LF 1,328.000 $440.000 $414.165
CONC BOX CULV (4 FT X 3 FT)
LF 348.000 $500.000 $462.786
CONC BOX CULV (6 FT X 3 FT)
LF 342.000 $720.000 $645.143
CONC BOX CULV (6 FT X 4 FT)
LF 174.000 $860.000 $698.259
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 80.000 $410.000 $378.078
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 216.000 $515.000 $397.141
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 114.000 $550.000 $462.786
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 5,388.000 $600.000 $550.624
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 80.000 $590.000 $505.804
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 78.000 $750.000 $660.080
INLET (COMPL)(TY S)
EA 6.000 $7,500.000 $5,750.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 3.000 $8,000.000 $6,617.900
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 1.000 $8,300.000 $13,293.216
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
EA 1.000 $8,500.000 $19,961.328
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 2.000 $9,000.000 $11,490.396
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (P)
EA 54.000 $10,000.000 $14,972.844
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 5.000 $12,500.000 $15,996.322
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (C)
EA 2.000 $15,000.000 $20,217.588
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
EA 68.000 $10,000.000 $10,279.672
SET (TY I)(S= 4 FT)(HW= 5 FT)(6:1) (C)
EA 37.000 $12,000.000 $11,706.097
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
EA 1.000 $12,000.000 $21,225.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
EA 1.000 $12,000.000 $16,542.696
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (C)
EA 8.000 $15,000.000 $20,859.900
SET (TY I)(S= 6 FT)(HW= 5 FT)(6:1) (P)
EA 6.000 $15,000.000 $24,252.248
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 8.000 $3,000.000 $2,382.500
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 55.000 $4,000.000 $2,858.800
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 1.000 $1,000.000 $13,200.000
CLEAN EXIST CULVERTS
EA 15.000 $2,600.000 $5,199.600
REMOV STR (INLET)
EA 1.000 $1,000.000 $5,500.000
REMOV STR (SET)
EA 23.000 $1,000.000 $2,750.000
REMOV STR (WINGWALL)
EA 3.000 $2,000.000 $3,300.000
REMOV STR (HEADWALL)
EA 8.000 $2,500.000 $3,300.000
REMOV STR (PIPE)
LF 446.000 $40.000 $22.000
REMOV STR (BOX CULVERT)
LF 532.000 $80.000 $33.000
MOBILIZATION
LS 1.000 $4,366,000.000 $3,064,308.800
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 25.000 $15,000.000 $21,247.200
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 336.000 $40.000 $38.500
CONSTRUCTION EXITS (REMOVE)
SY 336.000 $10.000 $38.500
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 2,330.000 $8.000 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,330.000 $2.000 $6.000
CONSTRUCTING DETOURS
SY 19,275.000 $55.000 $62.755
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
LF 17,970.000 $45.000 $53.263
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 34,800.000 $6.000 $6.975
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 17,970.000 $7.000 $9.263
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 3,723.000 $140.000 $132.000
CONC CURB & GUTTER (TY II)
LF 3,762.000 $30.000 $85.800
CONC SIDEWALKS (5")
SY 1,070.000 $60.000 $203.500
CURB RAMPS (TY 10)
EA 12.000 $2,500.000 $6,600.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 105,105.000 $0.200 $0.110
MTL W-BEAM GD FEN (STEEL POST)
LF 243.500 $40.000 $40.700
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 150.000 $100.000 $71.500
REMOVE METAL BEAM GUARD FENCE
LF 650.000 $5.000 $3.300
CABLE BARRIER SYSTEM (TL-4)
LF 16,649.000 $15.000 $24.750
CABLE BARRIER SYSTEM (TL-4) (10'-0")
LF 607.000 $20.000 $37.400
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 15.000 $3,500.000 $3,811.500
REMOVE CABLE BARRIER
LF 650.000 $5.000 $66.000
REMOVE CABLE BARRIER TERMINAL SECTION
EA 1.000 $500.000 $3,701.500
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $4,000.000 $2,750.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $420.000 $330.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 43.000 $1,500.000 $900.000
CRASH CUSH ATTEN (REMOVE)
EA 35.000 $1,000.000 $600.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $30,000.000 $25,300.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 35.000 $9,000.000 $8,250.000
WIRE FENCE (TY A)
LF 1,348.000 $25.000 $27.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 16.000 $820.000 $973.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 13.000 $900.000 $1,094.500
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 53.000 $950.000 $1,050.500
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 2.000 $1,000.000 $1,336.500
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 13.000 $1,300.000 $1,226.500
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 3.000 $1,300.000 $1,518.000
REMOVE SM RD SN SUP&AM
EA 64.000 $140.000 $110.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 14.000 $25.000 $20.900
REMOVE DELIN & OBJECT MARKER ASSMS
EA 30.000 $100.000 $27.500
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 10.000 $50.000 $51.700
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 6.000 $100.000 $165.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 59.000 $95.000 $165.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 16,605.000 $0.250 $0.198
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 153,820.000 $0.150 $0.154
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 7,713.000 $0.150 $0.198
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 184,050.000 $0.150 $0.154
WK ZN PAV MRK REMOV (REFL) TY I-C
LF 1,662.000 $5.000 $3.850
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 1,766.000 $5.000 $3.850
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 33,201.000 $3.000 $2.950
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 42,311.000 $1.000 $2.950
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,700.000 $1.000 $0.979
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 1,163.000 $4.000 $3.300
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 20,199.000 $0.500 $0.715
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 76,366.000 $0.500 $0.715
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 7,555.000 $0.500 $0.715
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 82,168.000 $0.500 $0.715
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 117.000 $15.000 $14.300
PREFAB PAV MRK TY C (W) (ARROW)
EA 28.000 $250.000 $275.000
PREFAB PAV MRK TY C (W) (WORD)
EA 12.000 $330.000 $352.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 42.000 $30.000 $27.500
REFL PAV MRKR TY I-C
EA 474.000 $4.000 $4.400
REFL PAV MRKR TY II-A-A
EA 309.000 $4.000 $4.400
REFL PAV MRKR TY II-C-R
EA 822.000 $4.000 $4.400
ELIM EXT PAV MRK & MRKS (4")
LF 36,180.000 $0.500 $0.715
ELIM EXT PAV MRK & MRKS (ARROW)
EA 2.000 $80.000 $88.000
SP MIXES SP-B SAC-B PG70-22
TON 106,903.000 $100.000 $117.084
TACK COAT
GAL 33,566.000 $5.000 $4.305
STONE-MTRX-ASPH SMAR-F SAC-A
TON 27,860.000 $150.000 $212.457
TOM-C SAC-A
TON 1,339.000 $200.000 $171.927
TACK COAT
GAL 3,097.000 $5.000 $4.725
BONDING COURSE
GAL 42,032.000 $5.000 $5.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $20,000.000 $18,466.800
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $10,000.000 $16,500.000
TMA (STATIONARY)
DAY 1,500.000 $150.000 $276.000
TMA (MOBILE OPERATION)
DAY 200.000 $150.000 $360.000
1
RC PIPE (CL III)(18 IN)
LF 308.000 $90.000 $78.400
1
RC PIPE (CL III)(24 IN)
LF 2,664.000 $125.000 $113.500
1A
RC PIPE (CL III)(24 IN)
LF 1,038.000 $125.000 $0.000
1A
THERMOPLASTIC PIPE (PP) (18")
LF 308.000 $90.000 $0.000
1A
THERMOPLASTIC PIPE (PP) (24")
LF 1,626.000 $125.000 $0.000
Totals: $48,386,046.300 $49,428,878.728