PREPARING ROW
|
AC
|
1.200
|
$3,000.000
|
$30,000.000
|
|
|
|
PREPARING ROW
|
STA
|
371.000
|
$5,500.000
|
$7,471.800
|
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
1,073.000
|
$15.000
|
$24.000
|
|
|
|
REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
42,812.000
|
$5.000
|
$4.174
|
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-19")
|
SY
|
4,724.000
|
$7.000
|
$19.479
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
185,789.000
|
$10.000
|
$6.240
|
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
936.000
|
$20.000
|
$30.000
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
26,064.000
|
$17.000
|
$9.969
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY D)
|
CY
|
185,789.000
|
$11.000
|
$5.667
|
|
|
|
BLADING
|
HR
|
225.000
|
$300.000
|
$270.000
|
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
582,374.000
|
$0.150
|
$0.176
|
|
|
|
PROOF ROLLING
|
HR
|
377.000
|
$150.000
|
$240.000
|
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (6")
|
SY
|
324,726.000
|
$10.000
|
$5.999
|
|
|
|
REWORK BS MTL (TY C) (6") (ORD COMP)
|
STA
|
88.000
|
$400.000
|
$300.000
|
|
|
|
REWORK BS MTL (TY A) (6") (ORD COMP)
|
SY
|
4,448.000
|
$8.000
|
$2.400
|
|
|
|
REWORK BS MTL (TY D)(SURF)(ORD COMP)
|
SY
|
42,812.000
|
$1.500
|
$1.200
|
|
|
|
PRIME COAT (AE-P)
|
GAL
|
3,349.000
|
$5.000
|
$5.550
|
|
|
|
PRIME COAT (MC-30)
|
GAL
|
70,317.000
|
$6.500
|
$5.690
|
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
74,685.000
|
$5.000
|
$4.725
|
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
132,967.000
|
$4.000
|
$5.440
|
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
2,952.000
|
$130.000
|
$139.227
|
|
|
|
FLEX PAVEMENT STRUCTURE REPAIR (8"-15")
|
SY
|
1,110.000
|
$100.000
|
$111.532
|
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
138.000
|
$2.500
|
$120.000
|
|
|
|
CONC PVMT (CONT REINF - CRCP) (6")
|
SY
|
1,320.000
|
$100.000
|
$300.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
986.000
|
$220.000
|
$343.500
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
688.000
|
$20.000
|
$24.000
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,230.000
|
$30.000
|
$24.000
|
|
|
|
CLASS S CONC UTILITY PROTECTION PADDING
|
CY
|
1,192.000
|
$1,100.000
|
$745.000
|
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
1,479.000
|
$690.000
|
$625.000
|
|
|
|
RIPRAP CONC (8 IN)
|
CY
|
88.000
|
$850.000
|
$1,530.000
|
|
|
|
RIPRAP (CONC)(DISSIPATER)
|
CY
|
9.000
|
$2,300.000
|
$1,530.000
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
931.000
|
$500.000
|
$550.000
|
|
|
|
GABION MATTRESSES (GALV)(12 IN)
|
SY
|
835.000
|
$60.000
|
$84.000
|
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
1,328.000
|
$440.000
|
$414.165
|
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
348.000
|
$500.000
|
$462.786
|
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
342.000
|
$720.000
|
$645.143
|
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
174.000
|
$860.000
|
$698.259
|
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
80.000
|
$410.000
|
$378.078
|
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
216.000
|
$515.000
|
$397.141
|
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
114.000
|
$550.000
|
$462.786
|
|
|
|
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
|
LF
|
5,388.000
|
$600.000
|
$550.624
|
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
80.000
|
$590.000
|
$505.804
|
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
78.000
|
$750.000
|
$660.080
|
|
|
|
INLET (COMPL)(TY S)
|
EA
|
6.000
|
$7,500.000
|
$5,750.000
|
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
3.000
|
$8,000.000
|
$6,617.900
|
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
1.000
|
$8,300.000
|
$13,293.216
|
|
|
|
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
|
EA
|
1.000
|
$8,500.000
|
$19,961.328
|
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
2.000
|
$9,000.000
|
$11,490.396
|
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
54.000
|
$10,000.000
|
$14,972.844
|
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
5.000
|
$12,500.000
|
$15,996.322
|
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (C)
|
EA
|
2.000
|
$15,000.000
|
$20,217.588
|
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
68.000
|
$10,000.000
|
$10,279.672
|
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(6:1) (C)
|
EA
|
37.000
|
$12,000.000
|
$11,706.097
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
1.000
|
$12,000.000
|
$21,225.000
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
1.000
|
$12,000.000
|
$16,542.696
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (C)
|
EA
|
8.000
|
$15,000.000
|
$20,859.900
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(6:1) (P)
|
EA
|
6.000
|
$15,000.000
|
$24,252.248
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$3,000.000
|
$2,382.500
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
55.000
|
$4,000.000
|
$2,858.800
|
|
|
|
ADJUSTING MANHOLES (WATER VALVE BOX)
|
EA
|
1.000
|
$1,000.000
|
$13,200.000
|
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
15.000
|
$2,600.000
|
$5,199.600
|
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$1,000.000
|
$5,500.000
|
|
|
|
REMOV STR (SET)
|
EA
|
23.000
|
$1,000.000
|
$2,750.000
|
|
|
|
REMOV STR (WINGWALL)
|
EA
|
3.000
|
$2,000.000
|
$3,300.000
|
|
|
|
REMOV STR (HEADWALL)
|
EA
|
8.000
|
$2,500.000
|
$3,300.000
|
|
|
|
REMOV STR (PIPE)
|
LF
|
446.000
|
$40.000
|
$22.000
|
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
532.000
|
$80.000
|
$33.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$4,366,000.000
|
$3,064,308.800
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
25.000
|
$15,000.000
|
$21,247.200
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
336.000
|
$40.000
|
$38.500
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
336.000
|
$10.000
|
$38.500
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
2,330.000
|
$8.000
|
$12.000
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,330.000
|
$2.000
|
$6.000
|
|
|
|
CONSTRUCTING DETOURS
|
SY
|
19,275.000
|
$55.000
|
$62.755
|
|
|
|
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
17,970.000
|
$45.000
|
$53.263
|
|
|
|
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
34,800.000
|
$6.000
|
$6.975
|
|
|
|
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
17,970.000
|
$7.000
|
$9.263
|
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
3,723.000
|
$140.000
|
$132.000
|
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
3,762.000
|
$30.000
|
$85.800
|
|
|
|
CONC SIDEWALKS (5")
|
SY
|
1,070.000
|
$60.000
|
$203.500
|
|
|
|
CURB RAMPS (TY 10)
|
EA
|
12.000
|
$2,500.000
|
$6,600.000
|
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
105,105.000
|
$0.200
|
$0.110
|
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
243.500
|
$40.000
|
$40.700
|
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
150.000
|
$100.000
|
$71.500
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
650.000
|
$5.000
|
$3.300
|
|
|
|
CABLE BARRIER SYSTEM (TL-4)
|
LF
|
16,649.000
|
$15.000
|
$24.750
|
|
|
|
CABLE BARRIER SYSTEM (TL-4) (10'-0")
|
LF
|
607.000
|
$20.000
|
$37.400
|
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
15.000
|
$3,500.000
|
$3,811.500
|
|
|
|
REMOVE CABLE BARRIER
|
LF
|
650.000
|
$5.000
|
$66.000
|
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
1.000
|
$500.000
|
$3,701.500
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$4,000.000
|
$2,750.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$420.000
|
$330.000
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
43.000
|
$1,500.000
|
$900.000
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
35.000
|
$1,000.000
|
$600.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
2.000
|
$30,000.000
|
$25,300.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
35.000
|
$9,000.000
|
$8,250.000
|
|
|
|
WIRE FENCE (TY A)
|
LF
|
1,348.000
|
$25.000
|
$27.500
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
16.000
|
$820.000
|
$973.500
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
13.000
|
$900.000
|
$1,094.500
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
53.000
|
$950.000
|
$1,050.500
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
2.000
|
$1,000.000
|
$1,336.500
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
13.000
|
$1,300.000
|
$1,226.500
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
3.000
|
$1,300.000
|
$1,518.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
64.000
|
$140.000
|
$110.000
|
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
14.000
|
$25.000
|
$20.900
|
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
30.000
|
$100.000
|
$27.500
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
10.000
|
$50.000
|
$51.700
|
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
|
EA
|
6.000
|
$100.000
|
$165.000
|
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
59.000
|
$95.000
|
$165.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
16,605.000
|
$0.250
|
$0.198
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
153,820.000
|
$0.150
|
$0.154
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
7,713.000
|
$0.150
|
$0.198
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
184,050.000
|
$0.150
|
$0.154
|
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
LF
|
1,662.000
|
$5.000
|
$3.850
|
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
1,766.000
|
$5.000
|
$3.850
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
33,201.000
|
$3.000
|
$2.950
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
42,311.000
|
$1.000
|
$2.950
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
5,700.000
|
$1.000
|
$0.979
|
|
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
1,163.000
|
$4.000
|
$3.300
|
|
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
20,199.000
|
$0.500
|
$0.715
|
|
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
76,366.000
|
$0.500
|
$0.715
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
7,555.000
|
$0.500
|
$0.715
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
82,168.000
|
$0.500
|
$0.715
|
|
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
117.000
|
$15.000
|
$14.300
|
|
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
28.000
|
$250.000
|
$275.000
|
|
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
12.000
|
$330.000
|
$352.000
|
|
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
42.000
|
$30.000
|
$27.500
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
474.000
|
$4.000
|
$4.400
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
309.000
|
$4.000
|
$4.400
|
|
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
822.000
|
$4.000
|
$4.400
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
36,180.000
|
$0.500
|
$0.715
|
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
2.000
|
$80.000
|
$88.000
|
|
|
|
SP MIXES SP-B SAC-B PG70-22
|
TON
|
106,903.000
|
$100.000
|
$117.084
|
|
|
|
TACK COAT
|
GAL
|
33,566.000
|
$5.000
|
$4.305
|
|
|
|
STONE-MTRX-ASPH SMAR-F SAC-A
|
TON
|
27,860.000
|
$150.000
|
$212.457
|
|
|
|
TOM-C SAC-A
|
TON
|
1,339.000
|
$200.000
|
$171.927
|
|
|
|
TACK COAT
|
GAL
|
3,097.000
|
$5.000
|
$4.725
|
|
|
|
BONDING COURSE
|
GAL
|
42,032.000
|
$5.000
|
$5.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$20,000.000
|
$18,466.800
|
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
2.000
|
$10,000.000
|
$16,500.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
1,500.000
|
$150.000
|
$276.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
200.000
|
$150.000
|
$360.000
|
|
1
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
308.000
|
$90.000
|
$78.400
|
|
1
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
2,664.000
|
$125.000
|
$113.500
|
|
1A
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,038.000
|
$125.000
|
$0.000
|
|
1A
|
|
THERMOPLASTIC PIPE (PP) (18")
|
LF
|
308.000
|
$90.000
|
$0.000
|
|
1A
|
|
THERMOPLASTIC PIPE (PP) (24")
|
LF
|
1,626.000
|
$125.000
|
$0.000
|
|
Totals: |
$48,386,046.300
|
$49,428,878.728
|