|
|
|
PREPARING ROW
|
STA
|
2.000
|
$25,000.000
|
$12,200.000
|
$659.350
|
$10,000.000
|
$73,317.620
|
|
|
|
REMOV CONC (CURB)
|
LF
|
250.000
|
$10.000
|
$22.000
|
$8.570
|
$20.000
|
$32.550
|
|
|
|
RMV (3"-7") TRT/UNTRT BASE & ASPH PAV
|
SY
|
5,334.000
|
$12.000
|
$8.770
|
$6.950
|
$8.000
|
$7.530
|
|
|
|
RMV (5") TRT/UNTRT BASE & ASPH PAV
|
SY
|
109,061.000
|
$8.000
|
$5.110
|
$5.470
|
$5.000
|
$4.210
|
|
|
|
RMV (8"-19") TRT/UNTRT BASE & ASPH PAV
|
SY
|
2,519.000
|
$15.000
|
$24.000
|
$7.350
|
$20.000
|
$20.420
|
|
|
|
EXCAV (ROADWAY)
|
CY
|
65,867.000
|
$15.000
|
$12.440
|
$3.750
|
$16.000
|
$11.800
|
|
|
|
EMBANK (FNL)(DC)(TY B)
|
CY
|
2,082.000
|
$35.000
|
$17.000
|
$10.950
|
$18.000
|
$11.930
|
|
|
|
BLADING
|
HR
|
63.000
|
$300.000
|
$400.000
|
$445.920
|
$150.000
|
$230.000
|
|
|
|
DRILL SEED (PERM_RURAL_SAND)
|
SY
|
258,106.000
|
$1.000
|
$0.220
|
$0.020
|
$0.120
|
$0.230
|
|
|
|
PROOF ROLLING
|
HR
|
125.000
|
$150.000
|
$150.000
|
$177.970
|
$60.000
|
$143.750
|
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (6")
|
SY
|
2,519.000
|
$25.000
|
$29.300
|
$17.740
|
$20.000
|
$25.440
|
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (8")
|
SY
|
45,389.000
|
$20.000
|
$12.750
|
$15.830
|
$20.000
|
$24.410
|
|
|
|
REWORK BS MTL (TY D)(SURF)(ORD COMP)
|
SY
|
114,395.000
|
$5.000
|
$0.640
|
$0.100
|
$1.000
|
$2.220
|
|
|
|
PRIME COAT (AE-P)
|
GAL
|
32,454.000
|
$6.000
|
$5.320
|
$4.900
|
$5.000
|
$6.810
|
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
29,228.000
|
$5.000
|
$5.210
|
$4.500
|
$4.000
|
$4.930
|
|
|
|
ASPH (CRS-2P)
|
GAL
|
29,228.000
|
$5.000
|
$4.930
|
$4.020
|
$4.000
|
$4.450
|
|
|
|
AGGR (TY-PB, GR-4)(SAC-A)
|
CY
|
1,400.000
|
$175.000
|
$180.000
|
$210.350
|
$160.000
|
$212.140
|
|
|
|
D-GR HMA TY-C SAC-B PG70-22
|
TON
|
547.000
|
$230.000
|
$255.000
|
$199.590
|
$200.000
|
$226.140
|
|
|
|
TACK COAT
|
GAL
|
245.000
|
$15.000
|
$14.870
|
$2.510
|
$4.000
|
$27.010
|
|
|
|
SP MIXES SP-B SAC-B PG70-22
|
TON
|
43,320.000
|
$135.000
|
$105.000
|
$144.230
|
$140.000
|
$153.000
|
|
|
|
TACK COAT
|
GAL
|
15,384.000
|
$5.000
|
$5.110
|
$2.510
|
$4.000
|
$8.060
|
|
|
|
CUT & RESTORING PAV
|
SY
|
30.000
|
$150.000
|
$1,650.000
|
$345.000
|
$250.000
|
$230.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
56.000
|
$300.000
|
$275.000
|
$466.130
|
$250.000
|
$287.500
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,842.000
|
$50.000
|
$38.500
|
$0.470
|
$8.000
|
$40.250
|
|
|
|
CLASS S CONC UTILITY PROTECTION PAD
|
CY
|
26.100
|
$4,000.000
|
$935.000
|
$1,274.230
|
$900.000
|
$977.500
|
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
3.000
|
$1,100.000
|
$1,650.000
|
$1,845.580
|
$2,000.000
|
$1,725.000
|
|
|
|
SET (TY I) (24 IN) (4: 1) (C)
|
EA
|
4.000
|
$9,000.000
|
$3,357.200
|
$16,129.090
|
$3,250.000
|
$3,509.800
|
|
|
|
SET (TY I) (30 IN) (4: 1) (C)
|
EA
|
4.000
|
$10,000.000
|
$3,511.200
|
$8,559.670
|
$8,500.000
|
$3,670.800
|
|
|
|
SET (TY I)(S= 3 FT)(HW= 3 FT)(4:1)(C)
|
EA
|
4.000
|
$9,000.000
|
$9,625.000
|
$9,171.900
|
$12,000.000
|
$10,062.500
|
|
|
|
SET (TY I)(S= 3 FT)(HW= 3 FT)(6:1)(C)
|
EA
|
1.000
|
$10,000.000
|
$9,471.000
|
$14,302.000
|
$11,000.000
|
$9,901.500
|
|
|
|
SET (TY I)(S= 3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
3.000
|
$10,000.000
|
$9,702.000
|
$9,428.810
|
$10,000.000
|
$10,143.000
|
|
|
|
SET (TY I)(S= 3 FT)(HW= 5 FT)(4:1)(C)
|
EA
|
8.000
|
$11,000.000
|
$12,012.000
|
$12,262.450
|
$12,000.000
|
$12,558.000
|
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1)(C)
|
EA
|
2.000
|
$10,000.000
|
$14,399.000
|
$17,794.230
|
$17,000.000
|
$15,053.500
|
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
1.000
|
$12,000.000
|
$13,090.000
|
$17,095.750
|
$16,000.000
|
$13,685.000
|
|
|
|
SET (TY I)(S= 4 FT)(HW= 6 FT)(4:1)(C)
|
EA
|
1.000
|
$15,000.000
|
$13,552.000
|
$17,441.720
|
$18,000.000
|
$14,168.000
|
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
2.000
|
$18,000.000
|
$18,711.000
|
$19,384.720
|
$22,000.000
|
$19,561.500
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$2,500.000
|
$3,249.400
|
$2,504.170
|
$3,000.000
|
$3,397.100
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$3,000.000
|
$3,249.400
|
$2,717.360
|
$4,000.000
|
$3,397.100
|
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$4,000.000
|
$4,897.200
|
$2,942.720
|
$4,500.000
|
$5,119.800
|
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$4,500.000
|
$4,897.200
|
$3,389.790
|
$5,500.000
|
$5,119.800
|
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
25.000
|
$2,000.000
|
$1,980.000
|
$131.870
|
$5,000.000
|
$2,070.000
|
|
|
|
REMOV STR (WINGWALL)
|
EA
|
22.000
|
$5,000.000
|
$990.000
|
$2,074.430
|
$4,000.000
|
$1,035.000
|
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$5,000.000
|
$1,650.000
|
$2,450.500
|
$5,000.000
|
$1,725.000
|
|
|
|
REMOV STR (PIPE)
|
LF
|
5.000
|
$200.000
|
$220.000
|
$816.960
|
$100.000
|
$230.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,033,000.000
|
$1,250,000.000
|
$899,483.650
|
$1,650,000.000
|
$1,600,980.510
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$30,000.000
|
$30,000.000
|
$5,382.370
|
$20,000.000
|
$24,699.070
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$10,500.000
|
$5,006.750
|
$20,000.000
|
$33,418.170
|
|
|
|
TMA (STATIONARY)
|
DAY
|
400.000
|
$600.000
|
$90.000
|
$42.170
|
$300.000
|
$264.230
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
50.000
|
$600.000
|
$935.000
|
$397.880
|
$100.000
|
$442.920
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,380.000
|
$30.000
|
$11.000
|
$1.220
|
$10.000
|
$44.850
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,380.000
|
$10.000
|
$4.000
|
$0.610
|
$5.000
|
$27.520
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
3,340.000
|
$10.000
|
$9.900
|
$10.960
|
$10.000
|
$6.100
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,340.000
|
$2.000
|
$1.100
|
$1.220
|
$1.000
|
$1.040
|
|
|
|
CONSTRUCTING DETOURS
|
SY
|
2,872.000
|
$100.000
|
$35.000
|
$0.460
|
$125.000
|
$116.520
|
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
4.000
|
$10,000.000
|
$6,050.000
|
$3,045.470
|
$5,000.000
|
$6,325.000
|
|
|
|
PTB (FUR&INST)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
3,090.000
|
$80.000
|
$24.750
|
$22.220
|
$40.000
|
$63.250
|
|
|
|
PTB (MOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
8,430.000
|
$10.000
|
$13.750
|
$3.700
|
$35.000
|
$23.000
|
|
|
|
PTB (REMOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
3,090.000
|
$15.000
|
$22.000
|
$19.400
|
$25.000
|
$34.500
|
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
182.000
|
$200.000
|
$44.000
|
$69.460
|
$60.000
|
$46.000
|
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
49,800.000
|
$2.000
|
$0.200
|
$0.070
|
$0.200
|
$0.070
|
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
49,800.000
|
$2.000
|
$0.240
|
$0.080
|
$0.200
|
$0.080
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
36.000
|
$1,400.000
|
$2,750.000
|
$420.730
|
$1,200.000
|
$1,725.000
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
12.000
|
$900.000
|
$1,650.000
|
$1,262.200
|
$1,100.000
|
$1,380.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
12.000
|
$12,000.000
|
$9,625.000
|
$5,020.310
|
$15,000.000
|
$9,775.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
7.000
|
$1,200.000
|
$918.500
|
$1,001.350
|
$925.000
|
$960.250
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
8.000
|
$1,300.000
|
$1,028.500
|
$1,160.930
|
$1,000.000
|
$1,075.250
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$1,400.000
|
$1,375.000
|
$1,659.170
|
$1,300.000
|
$1,437.500
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
5.000
|
$1,500.000
|
$1,375.000
|
$1,636.030
|
$1,300.000
|
$1,437.500
|
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
1.000
|
$3,000.000
|
$1,540.000
|
$1,865.050
|
$1,500.000
|
$1,610.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
10.000
|
$150.000
|
$90.000
|
$116.950
|
$110.000
|
$115.000
|
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
26.000
|
$100.000
|
$170.500
|
$115.730
|
$160.000
|
$178.250
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
131,370.000
|
$0.500
|
$0.280
|
$0.300
|
$0.280
|
$0.290
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
154,720.000
|
$0.500
|
$0.280
|
$0.300
|
$0.280
|
$0.290
|
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
6,200.000
|
$10.000
|
$6.600
|
$7.310
|
$6.500
|
$6.900
|
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
53,064.000
|
$2.000
|
$0.610
|
$0.670
|
$0.750
|
$0.630
|
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
48.000
|
$25.000
|
$22.000
|
$24.360
|
$25.000
|
$23.000
|
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
106,128.000
|
$2.000
|
$0.610
|
$0.670
|
$0.750
|
$0.630
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
19,006.000
|
$2.000
|
$2.000
|
$1.790
|
$1.000
|
$4.000
|
|
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
403.000
|
$1.000
|
$0.830
|
$0.910
|
$0.750
|
$0.860
|
|
|
|
REFL PAV MRK TY I (W)6"(LNDP)(100MIL)
|
LF
|
508.000
|
$1.000
|
$0.810
|
$0.900
|
$0.750
|
$0.850
|
|
|
|
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
|
LF
|
116,048.000
|
$2.000
|
$0.940
|
$0.100
|
$0.850
|
$0.980
|
|
|
|
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
|
LF
|
119,152.000
|
$2.000
|
$0.940
|
$0.110
|
$0.850
|
$0.980
|
|
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
4,704.000
|
$1.500
|
$0.770
|
$0.850
|
$0.700
|
$0.810
|
|
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
54,020.000
|
$1.500
|
$0.770
|
$0.850
|
$0.700
|
$0.810
|
|
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
61,480.000
|
$1.500
|
$0.770
|
$0.850
|
$0.750
|
$0.810
|
|
|
|
PREFAB PM TY B (W)(LN RDCT ARROW)
|
EA
|
4.000
|
$800.000
|
$683.110
|
$756.510
|
$625.000
|
$714.160
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
237.000
|
$6.000
|
$8.250
|
$9.140
|
$7.500
|
$8.630
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,688.000
|
$6.000
|
$4.950
|
$5.480
|
$4.750
|
$5.180
|
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
55,046.000
|
$2.000
|
$0.250
|
$0.060
|
$1.000
|
$0.880
|
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
457,172.000
|
$2.000
|
$0.250
|
$0.040
|
$0.400
|
$0.940
|
|
|
|
BONDING COURSE
|
GAL
|
30,765.000
|
$6.000
|
$5.110
|
$2.510
|
$4.000
|
$4.920
|
|
1
|
|
STONE-MTRX-ASPH SMAR-F SAC-A
|
TON
|
12,752.000
|
$185.000
|
$143.000
|
$201.170
|
$0.000
|
$0.000
|
|
1A
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
12,752.000
|
$185.000
|
$0.000
|
$0.000
|
$180.000
|
$197.890
|
|
2
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
184.000
|
$160.000
|
$160.820
|
$122.980
|
$140.000
|
$167.920
|
|
2A
|
|
THERMOPLASTIC PIPE (PP) (24")
|
LF
|
0.000
|
$160.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
Totals: |
$22,735,895.000
|
$13,723,465.920
|
$13,893,001.143
|
$16,991,349.270
|
$18,500,000.000
|