Job Info for 2030-01-011

County: UPSHUR Highway: FM 556 Date: 05/03/2024 (6 months ago) Engineer's Estimate: $4,301,743 Control Number: 2030-01-011
Project: BR 2B24(032) District: ATLANTA Time: 0 X Type: REPLACE BRIDGE AND APPROACHES
Bidder's List
Informational:
Email All | Notice | Questions
HCS
Pay Estimates: 1 | 2 | 3 | 4
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $4,301,743.15
EAST TEXAS BRIDGE, INC.   $3,343,732.79 1
-22.27% | -$958,010.36
TRUE ROADS, LLC   $3,520,919.85 2
-18.15% | -$780,823.30
5.3% | $177,187.06
HODGES AND SON CONSTRUCTION COMPANY, INC.   $3,616,494.00 3
-15.93% | -$685,249.15
8.16% | $272,761.21
2.71% | $95,574.15
LONGVIEW BRIDGE AND ROAD, LTD.   $3,816,182.78 4
-11.29% | -$485,560.37
14.13% | $472,449.99
5.52% | $199,688.78
Subcontractor Percentage Amount
MORRIS COUNTY CONTRACTORS, L.L.C. 1.94% $44,973.97
ISAACS CONSTRUCTION SERVICES LLC 1.32% $30,600.84
STRIPING TECHNOLOGY, L.P. 0.60% $13,909.47
PANOLA SIGN & BARRICADE, INC. 0.54% $12,518.53
SOUTHWEST ENVIRONMENT SERVICES LLC 0.33% $7,650.21
TORO BRAVO CONSTRUCTION, LLC 0.26% $6,027.44
HODGES AND SON CONSTRUCTION COMPANY, INC. 0.00% $0.00
Total: 4.99% $115,680.46

Bid Items

Items: 72, 0 filtered
UPSHUR FM 556  |  ATLANTA  |  2030-01-011  |  05/03/2024  |  $4,301,743  |  BR 2B24(032)  |  REPLACE BRIDGE AND APPROACHES  |  0 X
Item code Description Unit Quantity Engineer's Estimate EAST TEXAS BRIDGE, INC. TRUE ROADS, LLC HODGES AND SON CONSTRUCTION COMPANY, INC. LONGVIEW BRIDGE AND ROAD, LTD.
100 6005 PREP ROW (TREE)(24"-30"DIA) EA 1.000 $1,500.000 $2,500.000 $3,000.000 $3,000.000 $15,000.000
104 6009 REMOVING CONC (RIPRAP) SY 82.000 $45.000 $20.000 $40.000 $10.000 $90.000
104 6054 REMOVING CONCRETE(MOW STRIP) LF 534.000 $16.000 $10.000 $6.000 $10.000 $10.000
105 6014 REMOVING STAB BASE & ASPH PAV (7"-12") SY 3,333.000 $25.000 $11.000 $8.000 $20.000 $13.000
110 6001 EXCAVATION (ROADWAY) CY 708.000 $30.000 $15.000 $22.000 $30.000 $28.000
132 6006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 2,556.000 $50.000 $20.000 $32.000 $30.000 $30.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 5,464.000 $4.500 $3.000 $4.000 $4.000 $4.000
164 6054 BOND FBR MTRX SEED (PERM)(RURAL)(SAND) SY 5,464.000 $1.250 $0.720 $0.800 $1.500 $0.710
164 6055 BONDED FBR MTRX SEED (TEMP)(WARM) SY 2,732.000 $1.250 $0.690 $0.750 $1.000 $0.720
164 6056 BONDED FBR MTRX SEED (TEMP)(COOL) SY 2,732.000 $1.250 $0.690 $0.750 $1.000 $0.700
168 6001 VEGETATIVE WATERING MG 175.000 $160.000 $5.000 $44.000 $1.000 $12.000
169 6002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY 950.000 $3.000 $0.800 $1.900 $3.000 $1.000
247 6236 FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS) CY 976.000 $125.000 $135.000 $135.000 $80.000 $145.000
275 6001 CEMENT TON 127.000 $325.000 $305.000 $300.000 $320.000 $320.000
275 6010 CEMENT TREAT (SUBGRADE) (8") SY 4,391.000 $8.250 $5.000 $3.650 $12.000 $5.000
275 6078 CEMENT TREAT (NEW BASE)(DC)(8") SY 4,383.000 $8.250 $5.000 $3.650 $12.000 $5.000
310 6009 PRIME COAT (MC-30) GAL 1,097.000 $12.000 $6.500 $12.500 $8.000 $7.000
400 6005 CEM STABIL BKFL CY 141.000 $290.000 $275.000 $325.000 $250.000 $305.000
401 6001 FLOWABLE BACKFILL CY 40.000 $650.000 $300.000 $280.000 $250.000 $350.000
416 6002 DRILL SHAFT (24 IN) LF 450.000 $275.000 $175.000 $220.000 $125.000 $230.000
416 6004 DRILL SHAFT (36 IN) LF 440.000 $350.000 $250.000 $380.000 $200.000 $325.000
420 6014 CL C CONC (ABUT)(HPC) CY 29.000 $1,700.000 $1,275.000 $1,850.000 $1,800.000 $1,450.000
420 6030 CL C CONC (CAP)(HPC) CY 34.200 $1,850.000 $1,300.000 $1,925.000 $1,800.000 $1,350.000
420 6038 CL C CONC (COLUMN)(HPC) CY 12.700 $2,100.000 $1,300.000 $2,450.000 $1,800.000 $1,750.000
422 6008 REINF CONC SLAB (SLAB BEAM)(HPC) SF 7,849.000 $30.000 $30.000 $25.000 $24.000 $32.000
422 6016 APPROACH SLAB (HPC) CY 84.400 $850.000 $1,000.000 $770.000 $1,000.000 $1,100.000
425 6011 PRESTR CONC SLAB BEAM (4SB15) LF 672.010 $300.000 $235.000 $300.000 $250.000 $250.000
425 6012 PRESTR CONC SLAB BEAM (5SB15) LF 1,008.010 $310.000 $235.000 $300.000 $250.000 $250.000
432 6006 RIPRAP (CONC)(CL B) CY 2.600 $1,050.000 $1,000.000 $1,685.000 $1,000.000 $2,000.000
432 6031 RIPRAP (STONE PROTECTION)(12 IN) CY 909.000 $225.000 $195.000 $160.000 $200.000 $210.000
432 6039 BEDDING MATERIAL (6 IN) CY 208.000 $220.000 $195.000 $185.000 $200.000 $225.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 40.000 $750.000 $725.000 $700.000 $650.000 $740.000
450 6111 RAIL (TY SSTR) (W/DRAIN SLOT) (HPC) LF 364.000 $165.000 $175.000 $135.000 $110.000 $155.000
454 6003 ARMOR JOINT LF 89.000 $175.000 $125.000 $110.000 $170.000 $130.000
454 6004 ARMOR JOINT (SEALED) LF 128.000 $160.000 $150.000 $110.000 $170.000 $140.000
496 6010 REMOV STR (BRIDGE 100 - 499 FT LENGTH) EA 1.000 $100,000.000 $40,000.000 $60,000.000 $175,000.000 $50,000.000
496 6043 REMOV STR (SMALL FENCE) LF 447.000 $20.000 $4.000 $6.000 $10.000 $10.000
500 6001 MOBILIZATION LS 1.000 $281,000.000 $225,000.000 $200,000.000 $225,000.000 $260,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 11.000 $10,600.000 $5,000.000 $5,500.000 $12,000.000 $6,000.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 60.000 $45.000 $38.000 $50.000 $1.000 $45.000
506 6003 ROCK FILTER DAMS (INSTALL) (TY 3) LF 100.000 $75.000 $54.000 $88.000 $1.000 $55.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 160.000 $20.000 $11.000 $18.000 $1.000 $11.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 160.000 $35.000 $32.000 $37.500 $1.000 $39.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 160.000 $12.000 $10.500 $15.000 $1.000 $11.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 2,551.000 $5.000 $4.250 $5.000 $1.000 $4.500
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 2,551.000 $1.750 $0.700 $0.800 $1.000 $2.000
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF 391.000 $12.000 $8.500 $7.500 $1.000 $7.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 391.000 $3.000 $2.150 $1.250 $1.000 $2.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 562.500 $35.000 $25.000 $29.000 $26.000 $26.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 4.000 $2,500.000 $2,000.000 $2,000.000 $1,500.000 $1,820.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 275.000 $7.000 $2.150 $2.500 $2.000 $2.200
542 6005 RM MTL BM GD FEN TRANS (T101) EA 4.000 $275.000 $165.000 $187.500 $1,200.000 $165.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $3,500.000 $3,100.000 $3,600.000 $2,800.000 $3,200.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 4.000 $350.000 $215.000 $250.000 $500.000 $220.000
552 6003 WIRE FENCE (TY C) LF 448.000 $40.000 $27.000 $18.750 $20.000 $11.000
644 6061 IN SM RD SN SUP&AM TYTWT(1)WS(T) EA 2.000 $825.000 $1,200.000 $1,250.000 $1,600.000 $1,200.000
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 6.000 $43.500 $50.000 $56.250 $50.000 $50.000
658 6016 INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI) EA 18.000 $35.000 $30.000 $31.250 $40.000 $28.000
658 6099 INSTL OM ASSM (OM-2Z)(WFLX)GND EA 2.000 $110.000 $250.000 $125.000 $200.000 $300.000
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 150.000 $3.000 $2.000 $3.750 $5.000 $2.200
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 150.000 $3.000 $2.000 $3.750 $5.000 $2.200
666 6225 PAVEMENT SEALER 6" LF 868.000 $1.100 $2.150 $2.500 $1.000 $2.200
672 6009 REFL PAV MRKR TY II-A-A EA 34.000 $10.000 $21.500 $25.000 $20.000 $22.000
678 6002 PAV SURF PREP FOR MRK (6") LF 868.000 $1.250 $1.100 $1.250 $1.000 $1.100
678 6033 PAV SURF PREP FOR MRK (RPM) EA 6.000 $10.000 $11.000 $12.500 $1.000 $13.000
800 6001 NO. OF WORKING DAYS $/D 5,997.000 $204.000 $171.000 $171.000 $171.000 $204.000
3077 6051 SP MIXES SP-D PG70-22 TON 354.000 $380.000 $245.000 $225.000 $250.000 $200.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 3.000 $16,500.000 $18,000.000 $20,000.000 $28,000.000 $22,000.000
6149 6004 REFL PAV MRK AWT (W) 6" (SLD) (100MIL) LF 2,680.000 $3.000 $2.150 $2.500 $4.000 $2.200
6149 6010 REFL PAV MRK AWT (Y) 6" (SLD) (100MIL) LF 2,680.000 $3.000 $2.150 $2.500 $4.000 $2.200
6185 6002 TMA (STATIONARY) DAY 5.000 $310.000 $350.000 $180.000 $300.000 $250.000
6185 6003 TMA (MOBILE OPERATION) HR 60.000 $95.000 $35.000 $20.000 $50.000 $70.000
Totals: $4,301,743.15 $3,343,732.79 $3,520,919.85 $3,616,494.00 $3,816,182.78