|
|
PREPARING ROW
|
STA
|
200.000
|
$5,000.000
|
$1,425.000
|
$10,000.000
|
$12,000.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
462.000
|
$32.000
|
$21.000
|
$40.000
|
$25.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
840.000
|
$52.000
|
$9.000
|
$30.000
|
$20.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
1,260.000
|
$11.500
|
$12.000
|
$20.000
|
$12.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY A)
|
CY
|
200.000
|
$77.830
|
$55.000
|
$50.000
|
$35.000
|
|
|
BACKFILL (TY A)
|
STA
|
478.000
|
$406.350
|
$309.000
|
$450.000
|
$450.000
|
|
|
BLADING
|
STA
|
40.000
|
$200.000
|
$350.000
|
$400.000
|
$300.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
88,267.000
|
$0.590
|
$0.100
|
$0.130
|
$0.140
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
88,267.000
|
$0.590
|
$0.100
|
$0.130
|
$0.140
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
176,533.000
|
$0.600
|
$0.500
|
$0.650
|
$0.620
|
|
|
VEGETATIVE WATERING
|
MG
|
2,825.000
|
$20.000
|
$7.000
|
$20.000
|
$8.000
|
|
|
CEMENT
|
TON
|
4,798.000
|
$330.000
|
$292.000
|
$340.000
|
$300.000
|
|
|
CEMENT TREAT (EXIST MATL)(DC)(12")
|
SY
|
174,492.000
|
$10.000
|
$5.850
|
$4.000
|
$5.000
|
|
|
PRIME COAT & BLOTTER (MC-30)
|
GAL
|
43,624.000
|
$6.000
|
$5.950
|
$6.500
|
$6.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
160,577.000
|
$6.000
|
$4.550
|
$5.000
|
$6.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
3,186.000
|
$185.000
|
$205.000
|
$270.000
|
$190.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
3,000.000
|
$89.200
|
$69.270
|
$95.000
|
$75.000
|
|
|
PLANE ASPH CONC PAV(0" TO 6")
|
SY
|
183,159.000
|
$6.000
|
$3.080
|
$4.000
|
$6.000
|
|
|
PLANE ASPH CONC PAV (6")
|
SY
|
20,317.000
|
$6.350
|
$4.320
|
$7.500
|
$6.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
3.000
|
$1,533.330
|
$1,200.000
|
$2,000.000
|
$1,500.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
58.000
|
$550.000
|
$710.000
|
$750.000
|
$750.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
184.000
|
$66.400
|
$55.000
|
$70.000
|
$80.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
20.000
|
$90.000
|
$95.000
|
$150.000
|
$100.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
20.000
|
$116.010
|
$160.000
|
$180.000
|
$150.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
16.000
|
$1,406.760
|
$950.000
|
$1,100.000
|
$1,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,545.000
|
$1,500.000
|
$1,700.000
|
$1,400.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$3,044.200
|
$2,500.000
|
$2,500.000
|
$2,500.000
|
|
|
REMOV STR (SET)
|
EA
|
13.000
|
$1,000.000
|
$200.000
|
$500.000
|
$300.000
|
|
|
REMOV STR (PIPE)
|
LF
|
220.000
|
$25.000
|
$17.000
|
$50.000
|
$20.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$3,178,000.000
|
$885,500.000
|
$3,200,000.000
|
$3,320,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$9,000.000
|
$12,000.000
|
$20,000.000
|
$30,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,000.000
|
$56.940
|
$35.000
|
$42.000
|
$42.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,000.000
|
$14.080
|
$10.000
|
$15.000
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,000.000
|
$5.160
|
$3.500
|
$5.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,000.000
|
$2.230
|
$0.250
|
$2.000
|
$0.550
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,000.000
|
$10.000
|
$4.000
|
$6.000
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,000.000
|
$2.180
|
$1.000
|
$2.000
|
$1.100
|
|
|
DRIVEWAYS (CONC)
|
SY
|
462.000
|
$119.190
|
$135.000
|
$170.000
|
$150.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
280.000
|
$89.350
|
$72.000
|
$70.000
|
$70.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
94,400.000
|
$0.700
|
$0.350
|
$0.250
|
$0.750
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
675.000
|
$20.000
|
$22.500
|
$25.000
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,874.000
|
$1,600.000
|
$1,800.000
|
$1,800.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,450.000
|
$1,300.000
|
$1,500.000
|
$1,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
600.000
|
$15.620
|
$2.000
|
$2.500
|
$3.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$415.000
|
$150.000
|
$170.000
|
$200.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,000.000
|
$2,800.000
|
$3,100.000
|
$3,200.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
6.000
|
$275.000
|
$200.000
|
$220.000
|
$300.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
7.000
|
$826.180
|
$851.000
|
$1,000.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$950.500
|
$872.000
|
$1,100.000
|
$1,050.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
33.000
|
$698.820
|
$407.000
|
$500.000
|
$550.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
10.000
|
$516.330
|
$491.000
|
$600.000
|
$650.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
68.000
|
$171.060
|
$99.000
|
$120.000
|
$125.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
22.000
|
$28.000
|
$25.000
|
$28.000
|
$30.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
91,312.000
|
$0.750
|
$0.320
|
$0.250
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
91,312.000
|
$0.580
|
$0.320
|
$0.250
|
$0.250
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
1,141.000
|
$5.060
|
$4.500
|
$5.000
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
8,320.000
|
$2.000
|
$1.000
|
$1.100
|
$1.100
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
51,360.000
|
$2.000
|
$1.000
|
$1.100
|
$1.100
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
735.000
|
$1.900
|
$1.250
|
$1.400
|
$1.400
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
955.000
|
$1.400
|
$1.250
|
$1.400
|
$1.400
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
741.000
|
$16.100
|
$13.500
|
$15.000
|
$15.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
85.000
|
$208.560
|
$202.000
|
$225.000
|
$225.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
7.000
|
$258.620
|
$245.000
|
$275.000
|
$275.000
|
|
PREFAB PAV MRK TY C (Y) (24") (SLD)
|
LF
|
50.000
|
$16.100
|
$15.000
|
$17.000
|
$17.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
1,243.000
|
$4.550
|
$4.300
|
$4.750
|
$4.750
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
3,172.000
|
$6.290
|
$4.300
|
$4.750
|
$4.750
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
74,191.000
|
$1.440
|
$0.650
|
$0.750
|
$0.750
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
510.000
|
$1.580
|
$1.000
|
$1.100
|
$1.100
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
7.000
|
$80.000
|
$100.000
|
$110.000
|
$110.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
7.000
|
$86.250
|
$100.000
|
$110.000
|
$110.000
|
|
|
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
|
LF
|
22,828.000
|
$1.000
|
$0.600
|
$0.700
|
$0.700
|
|
|
TEMP TRAF SIGNALS
|
EA
|
1.000
|
$85,000.000
|
$125,500.000
|
$150,000.000
|
$150,000.000
|
|
|
SP MIXES SP-D PG64-22
|
TON
|
2,163.000
|
$150.000
|
$176.000
|
$168.000
|
$185.000
|
|
|
SP MIXES SP-D PG76-22
|
TON
|
36,157.000
|
$170.000
|
$122.750
|
$170.000
|
$172.000
|
|
|
SP MIXES SP-D SAC-A PG76-22
|
TON
|
58,091.000
|
$180.000
|
$130.250
|
$170.000
|
$175.000
|
|
|
TACK COAT
|
GAL
|
58,605.000
|
$2.050
|
$4.500
|
$4.750
|
$5.000
|
|
|
TBPFC (MEMBRANE)
|
GAL
|
48,858.000
|
$7.000
|
$4.500
|
$5.500
|
$6.000
|
|
|
TBPFC PG76-22 SAC-A
|
TON
|
12,434.000
|
$330.000
|
$163.000
|
$220.000
|
$205.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$20,881.970
|
$20,000.000
|
$20,000.000
|
$30,000.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
91,075.000
|
$6.500
|
$3.550
|
$4.000
|
$4.000
|
|
|
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
|
LF
|
95,600.000
|
$1.300
|
$0.820
|
$1.000
|
$0.900
|
|
|
REFL PAV MRK AWT (W) 6" (BRK) (100MIL)
|
LF
|
23,901.000
|
$2.600
|
$0.900
|
$1.000
|
$1.000
|
|
|
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
|
LF
|
113,100.000
|
$1.750
|
$0.820
|
$1.000
|
$0.900
|
|
|
REFL PAV MRK AWT (Y) 6" (BRK) (100MIL)
|
LF
|
19,038.000
|
$0.690
|
$0.900
|
$1.000
|
$1.000
|
|
|
TMA (STATIONARY)
|
DAY
|
212.000
|
$218.570
|
$225.000
|
$275.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
26.000
|
$417.480
|
$0.010
|
$350.000
|
$300.000
|
|
Totals: |
$35,104,208.290
|
$22,871,598.150
|
$32,692,110.220
|
$33,733,733.320
|